DRYDOCK REPAIRS FOR THE CGC PATOKA: requirements and submission rules
62 requirements and 10 submission rules found in the solicitation documents for 70ZU0227QIBCT0003. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- QUOTATION DUE DATE: Your quotation must arrive no later than 04 January, 2027
- The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management which can be accessed via https://www.sam.gov (see 52.204-7).
- Submit questions to Sandra.a.martinez@uscg.mil. and to jayne.gluck@uscg.mil using Attachment 4 - Request for Clarification.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- Contractor must submit quote to the Contracting Officer within 72 hours receipt of the additional work request.
- Submit quotes via email to Contracting Officer, Sandra.a.Martinez@uscg.mil and Jayne.gluck@uscg.mil.
- A completed and electronically signed copy of the ATTACHMENT 1 in portable document format (pdf) shall be submitted.
- The Quoters shall submit all certifications, licenses, and personnel qualifications required by the Statement of Work (SOW) with their initial quote submission.
Requirements
| ID | Requirement |
|---|---|
| R1 | This requirement is being solicited as a total small business set aside using FAR Part 12 Acquisition of Commercial Items. The NAICS Code is 336611 – Ship Repair with a small business size standard of 1,300 employees. |
| R2 | The contractor to provide all necessary materials, equipment, personnel as necessary to perform Drydock repairs to the U.S. Coast Guard Cutter USCGC PATOKA (WLB 203) FY27 Drydock Availability 225’ Buoy Tender homeported in Greenville, MS, all in exact accordance with this solicitation and the attached specification. |
| R3 | The place of performance shall be at the Contractors Facility. |
| R4 | Offeror’s questions concerning this solicitation shall be submitted in writing, and must be submitted on the attached “Request for Clarification” form. One question should be submitted per form. Each form should indicate the name of the offeror’s firm. |
| R5 | The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in section (FAR) 3.908. |
| R6 | The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award. |
| R7 | Unless a waiver or exception applies, the Contractor is prohibited from providing any products or services to the Government or using in the performance of the contract any of the following: (1) A covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees... (2) A Kaspersky Lab-covered article... (3) Covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system... |
| R8 | The Contractor is prohibited from— (i) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements... (ii) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract... and (iii) On or after December 22, 2025, using Federal funds to procure or operate a FASC-prohibited unmanned aircraft system... |
| R9 | Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system |
| R10 | Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC’s implementing regulations at 31 CFR chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States. |
| R11 | The Contractor is prohibited from conducting any restricted business operations in Sudan in accordance with Accountability and Divestment Act of 2007 (Pub. L. 110-174). |
| R12 | Unless an exception applies or the Government grants a waiver, contractors are prohibited from knowingly engaging in any significant transaction (i.e., over $10,000) with Iran’s Revolutionary Guard Corps or any of its officials, agents, or affiliates, the property and interests in property of which are blocked according to the International Emergency Economic Powers Act |
| R13 | Unless the Government has issued an applicable waiver, contractors shall not provide or use as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order |
| R14 | The contractor shall conduct a reasonable inquiry to determine if there are any prohibited products or services. |
| R15 | If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours |
| R16 | During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e) of this clause. |
| R17 | The Contractor shall insert the substance of this clause, including this paragraph (j) but excluding subparagraphs (d)(1) and (i)(1), in all subcontracts and other contractual instruments, including subcontracts for acquiring commercial products or commercial services. |
| R18 | The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services. |
| R19 | A CLIN may not be invoiced until the percentage complete reaches 25 percent. |
| R20 | In addition to the information required by FAR 52.212-4 (g) Invoices shall include: Contract Number, Delivery Order/Task Order Number, DOC Number; Name and Address of the Contractor; Invoice Number and Invoice Date; DUNS Number; Name of the Contract Specialist and Contracting Officer’s; Invoice Routing Code (IRC): SFLC-2; Period of Performance for Work Invoiced; Indicate Small Business Status; Indicate if Final Invoice, the Contractor’s final invoice submitted under the contract must be marked as follows: “THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER” (to be assigned upon contract award); The percentage of completion for each CLIN identified; Vessel name; The overall percentage and dollar amount previously billed, currently billed and unbilled; Shipping and Payment Terms; Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice. |
| R21 | The contractor shall provide a copy of contractor’s standard commercial warranty. The contractor’s standard commercial warranty will be attached to the contract. |
| R22 | The Commanding Officer of the Cutter will pay all toll charges and applicable taxes and surcharges for long-distance telephone calls placed by ship’s personnel. All other charges shall be borne by the Contractor |
| R23 | The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 08 feet and a minimum vertical clearance of 50 feet. |
| R24 | The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. |
| R25 | The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security. |
| R26 | the Contractor agrees to allow officers, employees, and associates of the Government, or other prime Contractors with the Government and their subcontractors, and officers, employees, and associates of offeror on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price. |
| R27 | Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract. |
| R28 | The Contractor shall not perform additional work without the Contracting Officer's authorization. |
| R29 | The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any quote order for a contract order. Unless otherwise directed, the breakdown shall be submitted on an SFLC 002 quote form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the order/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the quote includes a request for a time extension, justification shall be furnished with the quote. |
| R30 | The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the Contractor and shall be included in the Composite Labor Rate. |
| R31 | All additional work that list sub-contracting and/or material must have a written quote from the sub-contractor or the company providing the material with complete, detailed information (listing number of hours/price per hour; each part/component & associated cost; and an estimated shipping cost). |
| R32 | All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made. |
| R33 | Details provided by the Contractor in a CFR are important and the Contractor should include in his/her CFR the following details as a minimum: A sequential number; The contract item which the "CFR" relates to; A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate; A proposed or recommended repair to correct the defective condition; Indicate whether the report requires Coast Guard action, or if it is provided "for info" only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized; A space on the form for the Coast Guard to make comments. |
| R34 | All CFR's will be dated, submitted, and signed by a representative of the Contractor. |
| R35 | The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract. |
| R36 | The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR [upon issuance of a Contract Deficiency Report (CDR)]. |
| R37 | Notwithstanding paragraph(s) (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. |
| R38 | Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. |
| R39 | In connection with the performance of work under this contract, the Contractor agrees as follows: (1) The Contractor will not engage in any racially discriminatory DEI activities; (2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause; (4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and (5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause. |
| R40 | The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States. |
| R41 | the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. |
| R42 | Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services. |
| R43 | A copy of the approved waiver, if a waiver has already been granted, or the waiver request, if a waiver has been applied for, shall be attached to the bid or proposal [under HSAR 3052.209-70]. |
| R44 | In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS)... Only those vendors that are JCP certified and have a JCP number will be able to obtain drawings and references. |
| R45 | Quotes shall be prepared in accordance with these instructions, providing all required information in the format specified. Failure of a quote to show compliance with these instructions may be grounds for exclusion of the quote from further consideration. |
| R46 | All pages in the quote shall be numbered and identified with the quote’s name USCGC PATOKA, Dry dock Repairs FY26, RFQ 70ZU0227QIBCT0003, and insert date of submitted quote. |
| R47 | All pages containing text shall be type written or printed on 8 ½ x 11-inch paper, with at least single spacing. Margins on all four edges of each page will be at least one inch. A page printed on both sides shall be counted as two pages. Quotes shall not be supplemented by a package or reference documents. |
| R48 | Email submission shall not exceed 10mb per email sent. Quote content relating to Price, Technical Capability, and Past Performance Information should be submitted in separate emails. |
| R49 | The Quoters must provide the exact, location of the facility to be used to perform the services required under the solicitation. |
| R50 | The Quoter shall provide documentation demonstrating corporate experience. Provide a description of at least three (3) previous or ongoing contracts performed within the last five (5) years that demonstrate experience providing Dry Dock ship repair services of a similar size, scope, and complexity to this requirement. For each contract, include the contract number, dollar value, period of performance, and a brief description of the services provided. |
| R51 | The Quoters shall provide a planning document for the PATOKA DD FY27 in graphical format (e.g., Gantt Chart, etc.). Each planning document must be legible and have the following characteristics: a. Shows overall period of performance for each work item provided in ATTACHMENT (2), Work Specifications with start and stop dates of major sub-tasks. b. Contains due dates for all major sub-tasks required for Critical Inspection Reports (CIR), along with the submission requirement for CIRs. c. Contains dates for any events requiring Coast Guard Inspector presence. d. Identifies all work item tasks that require Technical Representative and Certified Coating Inspector assistance. e. Identifies all work item tasks that require subcontractor assistance. f. Identifies the critical path(s) for the project... g. Identifies tasks with float (also known as “slack”)... h. Shows start/finish or finish/start relationships and dependencies for all tasks that have work constraints or require coordination of work activities. |
| R52 | Quoters shall provide a written narrative of no more than ten (10) pages providing amplifying information regarding the Quoter’s technical capabilities to complete all work within the prescribed performance period. |
| R53 | Proof of insurance (Statement of coverage from current insurance carrier); |
| R54 | List of ALL subcontractors that the Quoters anticipates subcontracting to. The list shall include the subcontractor’s name, address, point of contract and phone number; the work item listed in the Pricing Schedule the subcontractor will perform work under; and the percentage of work the subcontractor will perform. If a work item requires a Certified Technical Representative or Qualified Technical Representative, the Quoters shall confirm in writing the subcontractor meets the stated requirement. |
| R55 | The quoter's quote shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s) per SFLC Standard Specification 0740. |
| R56 | The quoters shall provide a current certification for the facility to be used to perform the requirements prior to award. Certification requirements are provided in the specification for the applicable work item(s) and SFLC Standard Specification 8634. The Contractor shall also provide the pre-award calculations described in the specification, and Appendix B of the SFLC Standard Specification 8634 with their offer. |
| R57 | The Offeror shall submit a comprehensive Execution Plan detailing their methodology for fulfilling all lodging and messing requirements for the duration of the ship repair availability. This narrative must specifically identify the commercial hotel properties, detailing their proximity to the shipyard, and explain how the Offeror will keep the crew consolidated (e.g., utilizing a single primary facility). The plan must also identify the commercial food options, detailing complete food service logistics, including the provision of high-caloric, nutritionally balanced meals that align with the specification. |
| R58 | Include all required information, EXCLUDING any reference to price [in the technical quote]. |
| R59 | The Quoters shall identify at least three (3) relevant (similar in nature, scope, and complexity to the work items provided in ATTACHMENT (2), Work Specifications and recent (completed within the last (3) three years) federal, state, or local government, or private contracts performed by the Quoters as the prime contractor. Each contract shall be identified using ATTACHMENT (3), Past Performance Information Form. |
| R60 | A quotation must receive an Acceptable rating for all non-price factors to be eligible for award. |
| R61 | The lay day rate and the hourly composite rate in the Pricing Sheet must be used as the maximum rates for purposes of preparing quotes for individual task orders, which are anticipated to be awarded on a firm fixed price basis, throughout the entire contract period. |
| R62 | The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO. |
Recent awards in NAICS 336611
The newest federal contract awards in the same industry code from Department of Homeland Security, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-04-18 | BIS AUTOMATION, INC.U.S. Coast Guard · THRUSTER DRIVE PROGRAMMING AND SERVICE | $14,898 |
| 2027-05-01 | THE ELECTRIC HEATER COU.S. Coast Guard · CGC BEAR HOT WATER HEATER | $42,240 |
| 2027-03-28 | SODERBERG MANUFACTURING COMPANY, INC.U.S. Coast Guard · SEARCHLIGHT | $15,840 |
| 2027-03-26 | PACIFIC MARINE INSPECTIONS LLCU.S. Coast Guard · SEAT, MARINE | $88,814 |
| 2027-02-23 | G I INDUSTRIAL-MARINE, LLCU.S. Coast Guard · TASK ORDER- DOCKSIDE REPAIRS TO THE USCGC CALHOUN (DEFINITE ITEMS) | $1.47 million |
| 2027-02-23 | PLATYPUS MARINE INCU.S. Coast Guard · USCGC SOCKEYE DD FY27 POP: 23FEB2027 - 27APR2027 | $1.10 million |
Source: USAspending.gov, retrieved 2026-11-19. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.