DRYDOCK REPAIRS FOR THE CGC PATOKA: requirements and submission rules
20 requirements and 10 submission rules found in the solicitation documents for 70ZU0227QIBCT0003. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- QUOTATION DUE DATE: Your quotation must arrive no later than 04 January, 2027
- The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management which can be accessed via https://www.sam.gov (see 52.204-7).
- Submit questions to Sandra.a.martinez@uscg.mil. and to jayne.gluck@uscg.mil using Attachment 4 - Request for Clarification.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- Contractor must submit quote to the Contracting Officer within 72 hours receipt of the additional work request.
- Submit quotes via email to Contracting Officer, Sandra.a.Martinez@uscg.mil and Jayne.gluck@uscg.mil.
- A completed and electronically signed copy of the ATTACHMENT 1 in portable document format (pdf) shall be submitted.
- The Quoters shall submit all certifications, licenses, and personnel qualifications required by the Statement of Work (SOW) with their initial quote submission.
Requirements
| ID | Requirement |
|---|---|
| R1 | The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 08 feet and a minimum vertical clearance of 50 feet. |
| R2 | The contractor shall provide a copy of contractor’s standard commercial warranty. The contractor’s standard commercial warranty will be attached to the contract. |
| R3 | In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS)... Only those vendors that are JCP certified and have a JCP number will be able to obtain drawings and references. |
| R4 | All pages in the quote shall be numbered and identified with the quote’s name USCGC PATOKA, Dry dock Repairs FY26, RFQ 70ZU0227QIBCT0003, and insert date of submitted quote. |
| R5 | All pages containing text shall be type written or printed on 8 ½ x 11-inch paper, with at least single spacing. Margins on all four edges of each page will be at least one inch. A page printed on both sides shall be counted as two pages. Quotes shall not be supplemented by a package or reference documents. |
| R6 | Email submission shall not exceed 10mb per email sent. Quote content relating to Price, Technical Capability, and Past Performance Information should be submitted in separate emails. |
| R7 | The Quoters must provide the exact, location of the facility to be used to perform the services required under the solicitation. The offeror is cautioned that its failure to provide the location of its commercial shipyard in the space provided may result in its quote being declared nonresponsive under the provisions of the terms of this Request for Quote. |
| R8 | The Quoter shall provide documentation demonstrating corporate experience. Provide a description of at least three (3) previous or ongoing contracts performed within the last five (5) years that demonstrate experience providing Dry Dock ship repair services of a similar size, scope, and complexity to this requirement. For each contract, include the contract number, dollar value, period of performance, and a brief description of the services provided. |
| R9 | The Quoters shall provide a planning document for the PATOKA DD FY27 in graphical format (e.g., Gantt Chart, etc.). Each planning document must be legible and have the following characteristics: a. Shows overall period of performance for each work item provided in ATTACHMENT (2), Work Specifications with start and stop dates of major sub-tasks. b. Contains due dates for all major sub-tasks required for Critical Inspection Reports (CIR), along with the submission requirement for CIRs. c. Contains dates for any events requiring Coast Guard Inspector presence. d. Identifies all work item tasks that require Technical Representative and Certified Coating Inspector assistance. e. Identifies all work item tasks that require subcontractor assistance. f. Identifies the critical path(s) for the project... g. Identifies tasks with float (also known as “slack”)... h. Shows start/finish or finish/start relationships and dependencies for all tasks that have work constraints or require coordination of work activities. |
| R10 | Quoters shall provide a written narrative of no more than ten (10) pages providing amplifying information regarding the Quoter’s technical capabilities to complete all work within the prescribed performance period. At a minimum the written narrative should explain: Any performance risks and risk strategies; How environmental challenges will be mitigated; How the Quoters plans to limit disruptions to cutter services; The Quoter’s quality assurance and quality control approach; The Quoter’s surge capacity; The Quoter’s terms and conditions of their best commercial warranty. |
| R11 | Proof of insurance (Statement of coverage from current insurance carrier); |
| R12 | List of ALL subcontractors that the Quoters anticipates subcontracting to. The list shall include the subcontractor’s name, address, point of contract and phone number; the work item listed in the Pricing Schedule the subcontractor will perform work under; and the percentage of work the subcontractor will perform. If a work item requires a Certified Technical Representative or Qualified Technical Representative, the Quoters shall confirm in writing the subcontractor meets the stated requirement. |
| R13 | The quoter's quote shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s) per SFLC Standard Specification 0740. |
| R14 | The quoters shall provide a current certification for the facility to be used to perform the requirements prior to award. Certification requirements are provided in the specification for the applicable work item(s) and SFLC Standard Specification 8634. The Contractor shall also provide the pre-award calculations described in the specification, and Appendix B of the SFLC Standard Specification 8634 with their offer. |
| R15 | The Offeror shall submit a comprehensive Execution Plan detailing their methodology for fulfilling all lodging and messing requirements for the duration of the ship repair availability. This narrative must specifically identify the commercial hotel properties, detailing their proximity to the shipyard, and explain how the Offeror will keep the crew consolidated (e.g., utilizing a single primary facility). The plan must also identify the commercial food options, detailing complete food service logistics, including the provision of high-caloric, nutritionally balanced meals that align with the specification. |
| R16 | Include all required information, EXCLUDING any reference to price. Each technical quote must be sufficiently specific, detailed and complete to clearly and fully demonstrate to the government that the Quoters has a thorough knowledge and understanding of the technical requirements. |
| R17 | The Quoters shall identify at least three (3) relevant (similar in nature, scope, and complexity to the work items provided in ATTACHMENT (2), Work Specifications and recent (completed within the last (3) three years) federal, state, or local government, or private contracts performed by the Quoters as the prime contractor. Each contract shall be identified using ATTACHMENT (3), Past Performance Information Form. |
| R18 | A quotation must receive an Acceptable rating for all non-price factors to be eligible for award. |
| R19 | The offeror under this solicitation represents that [Check one]: it is not a foreign incorporated entity that should be treated as an inverted domestic corporation...; it is a foreign incorporated entity... but it has submitted a request for waiver...; or it is a foreign incorporated entity... but it plans to submit a request for waiver... A copy of the approved waiver, if a waiver has already been granted, or the waiver request, if a waiver has been applied for, shall be attached to the bid or proposal. |
| R20 | The quoters represents as part of its offer that— (i) it □ is, □ is not a small business concern; or (ii) It □ is, □ is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The quoters shall enter the name and unique entity identifier of each party to the joint venture: __.] |
Recent awards in NAICS 336611
The newest federal contract awards in the same industry code from Department of Homeland Security, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-04-18 | BIS AUTOMATION, INC.U.S. Coast Guard · THRUSTER DRIVE PROGRAMMING AND SERVICE | $14,898 |
| 2027-05-01 | THE ELECTRIC HEATER COU.S. Coast Guard · CGC BEAR HOT WATER HEATER | $42,240 |
| 2027-03-28 | SODERBERG MANUFACTURING COMPANY, INC.U.S. Coast Guard · SEARCHLIGHT | $15,840 |
| 2027-03-26 | PACIFIC MARINE INSPECTIONS LLCU.S. Coast Guard · SEAT, MARINE | $88,814 |
| 2027-02-23 | G I INDUSTRIAL-MARINE, LLCU.S. Coast Guard · TASK ORDER- DOCKSIDE REPAIRS TO THE USCGC CALHOUN (DEFINITE ITEMS) | $1.47 million |
| 2027-02-23 | PLATYPUS MARINE INCU.S. Coast Guard · USCGC SOCKEYE DD FY27 POP: 23FEB2027 - 27APR2027 | $1.10 million |
Source: USAspending.gov, retrieved 2026-11-14. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.