Aircraft Electrical Component Test Stand (AECTS): requirements and submission rules
28 requirements and 13 submission rules found in the solicitation documents for 70Z03826QK0000014. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- (c) Late submissions, modifications, revisions, and withdrawals of offers.
- Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.” (2) FASCSA Orders.
- (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
- (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
- (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act— covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil.
- The final drawing package shall be completed and submitted to the Government for final approval.
- Any contract modifications or scope adjustments must be submitted in writing to the KO for formal modification.
- (iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
Requirements
| ID | Requirement |
|---|---|
| R1 | As a minimum, offers shall include— (1) The solicitation number; (2) The name, address, telephone number of the Offeror; (3) The Offeror’s Unique Entity Identifier (UEI) and, if applicable, Electronic Funds Transfer (EFT) indicator; (4) Information necessary to evaluate the factors contained in the provision at 52.212-2 or as described in the solicitation; (5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)); and (6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments. |
| R2 | The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. |
| R3 | Offerors are responsible for submitting offers and any modifications or revisions to the Government office designated in the solicitation by the time specified in the solicitation. |
| R4 | Offeror must be able to provide factory new equipment and possesses the ability to support all designated platforms that are supported at the Aviation Logistics Center (ALC). |
| R5 | Offeror must be able to provide documentation that the equipment being offered meets all Requirements outlined in the Technical Criteria (Attachment 2 – Technical Criteria – 70Z03826QK0000014). |
| R6 | Offeror must have an active registration in the Defense Logistics Agency’s Joint Certification Program (JCP). |
| R7 | Offeror must be able to provide an Equipment Operability Certification that certifies the systems are fully operational and ready for use. |
| R8 | Detailed explanation of any requirement listed in the SOW that cannot be successfully accomplished by the offeror. If not addressed, the United States Coast Guard (USCG) will assume that the offeror does not take exception to any terms or conditions. |
| R9 | The offeror shall provide pricing as requested in the attached spreadsheet titled “Attachment 1 – Schedule of Services – 70Z03826QK0000014”. Any quantity price discounts and discounts for prompt payment should be included in this section. |
| R10 | A Certificate of Conformance (COC) IAW FAR 52.246-15 shall be required for all items provided on this order. The COC must include the National Stock Number, Part Number, Serial Number, and Purchase Order Number and must be signed by the Contractor’s authorized representative. |
| R11 | The USCG requires delivery of the initial design package sixty (60) days after receipt of the order (ARO). |
| R12 | The Contractor shall conduct a site visit to ALC within ten (10) calendar days after Contract Award (DACA). The purpose of the Site Visit/Kickoff Meeting shall be to establish the framework of the Contractor and Government interaction during the performance period of the contract. The Contractor shall place emphasis on the schedule (milestones and deliverables), and each phase of the project. |
| R13 | Prior to installing the new AECTS, the contractor shall disconnect and remove the existing AECTS (identified in section 5.2). The Contractor shall provide all labor, rigging equipment, tools, and materials necessary to safely relocate the existing equipment to a location designated by the Government outside Building 63, Shop 242 Aircraft Electrical Shop. |
| R14 | The Contractor shall provide all necessary rigging equipment and labor to perform off-loading and movement of the identified equipment into the customer’s desired location Building 63, Shop 242 Aircraft Electrical Shop. |
| R15 | If the replacement system requires LCD monitors or auxiliary monitors beyond the baseline configuration, all necessary display hardware and cabling shall be included in the Contractor’s proposal. All installation activities shall conform to the Original Equipment Manufacturers (OEM) specifications, technical data, drawings, procedures, and industrial safety manuals. |
| R16 | The Contractor shall assign at least, one (1) Certified Brand Technician to assemble, level, connect and precision-align the AECTS. The technician shall fabricate all rigid high-pressure tubing, make mechanical and electrical interconnections, perform initial start-up, run operational diagnostics, and calibrate all installed options. |
| R17 | Following installation and initial calibration, the Contractor shall execute a confidence verification run on each Ready for Issue (RFI) generator listed in Table 1 IAW the applicable technical orders to prove baseline calibration and diagnostic accuracy. |
| R18 | The Contractor shall calibrate the system IAW OEM specifications and the U.S. National Standard for military Measuring and Test Equipment (M&TE) ANSI/NCSL Z540.3 and ISO/IEC 17025:2017 traceable standards. If specific subsystems do not require calibration or cannot be calibrated in the field, the Contractor shall advise in writing. |
| R19 | The Contractor shall provide a formal Certificate of Calibration for the AECTS containing: Certificate identification number; Name and technician credentials of individual performing calibration; Calibration date and environmental conditions; Instrument model numbers, serial numbers, and sensor identification; Adjustments, standards used, and specific procedures performed; Comprehensive before-and after calibration results and tolerances. |
| R20 | A tamper-evident calibration decal shall be affixed to the primary console. The decal shall indicate: Calibration date; Technician name or employee ID; Next calibration due date (month/year); Equipment serial number; Servicing Contractor name. Decals shall be applied to prevent display obstruction and must be cleanly removable without marring equipment finishes. |
| R21 | The Contractor shall deliver the following documents upon final acceptance: Final “As-Built” mechanical, electrical, and facility connection schematics; Commercial-off-the Shelf (COTS) equipment manuals; Comprehensive Operator and Calibration Manuals; Maintenance and Preventative Maintenance Manuals. |
| R22 | The Contractor shall provide standard commercial warranty coverage commencing immediately upon final Government acceptance of the AECTS. The Government requires: Base Warranty – A minimum of one (1) year full commercial warranty covering all parts, labor, travel, and software support. Extended Warranty – One (1) additional consecutive year of extended warranty coverage commencing immediately upon expiration of the base warranty. |
| R23 | The Contractor shall provide operator training following startup for a minimum of four (4) USCG technicians. Training shall occur during normal working hours between 7:00 a.m. and 3:30 p.m. Eastern Time (ET). Training may incorporate blended computer-based instruction but must include a minimum of four (4) hours of hands-on, on-site instruction covering system configuration, software operation, generator mounting/coupling, and routine run procedures. |
| R24 | The Contractor shall provide maintenance technician training for a minimum of four (4) USCG personnel during standard working hours between 7:00 a.m. and 3:30 p.m. ET. The training shall include at least four (4) hours of hands-on familiarization covering mechanical alignments, fluid maintenance, electrical power distribution, diagnostic fault isolation, component replacement, and calibration checks. |
| R25 | The Contractor shall supply a recommended spare parts list and consumable inventory list for ongoing routine maintenance. |
| R26 | Contractor shall provide OEM certified, but no less than, industry trained technicians and all personnel shall be qualified to perform the maintenance, repair, and calibrations (as applicable) on the listed equipment. |
| R27 | The Contractor shall provide a single POC that shall be responsible for all Contractor work performed under this SOW. The Contractor shall provide the name of the POC and the name(s) of any alternate POCs authorized to act in their absence before the start of performance. The primary POC and all designated alternates shall be able to read, write, speak, and understand English. |
| R28 | The Contractor shall provide all personal protective equipment (respiratory protection, hearing protection, gloves, steel-toed shoes, safety glasses, protective clothing, etc.). |
Recent awards in NAICS 334515
The newest federal contract awards in the same industry code from Department of Homeland Security, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-28 | NEW TECH SOLUTIONS, INC.Federal Emergency Management Agency · PURCHASE ORDER FOR COMMUNICATIONS SYSTEM ANALYZER (R8200) THAT COMBINES RADIO AND INFRASTRUCTURE TEST CAPABILITY WITH THE ABILITY TO MEASURE RADIO FREQUENCY NETWORK CHARACTERISTICS TO SUPPORT THE FEDE | $65,041 |
| 2026-09-28 | FOTRONIC CORPORATIONOffice of Procurement Operations · OCSO REQUESTS FOUR (4) FLIR T865 THERMAL IMAGING CAMERAS FOR THE TECHNICAL OPERATIONS BRANCH. POP: 90 DAYS FROM DATE OF AWARD WITH ONE (1) YEAR WARRANTIES. | $123,460 |
| 2026-09-25 | SIGNAL HOUND, LLCOffice of Procurement Operations · FIVE (5) SIGNAL HOUND SM435B & BB60D SPECTRUM ANALYZERS FOR THE TECHNICAL OPERATIONS BRANCH. | $160,418 |
| 2026-09-09 | VIAVI SOLUTIONS INC.U.S. Coast Guard · FUEL CONTROL TEST SET FOR C130 J TEST SETP/N: PSD90 3QUANTITY: 1 EAPRICE: $23,740.00VENDOR: VIAVI SOLUTION | $23,740 |
| 2026-09-04 | FOTRONIC CORPORATIONU.S. Coast Guard · FY26 BASE ELIZ CITY 01 EZ-THUMP CABLE FAULT LOCATION SYSTEM 01 NORTH AMERICA (US,CA,MX) TERMINATION KIT - HOTLINE CLAMPS WITH MC INTERFACE | $26,307 |
| 2026-08-24 | TEL-INSTRUMENT ELECTRONICS CORPU.S. Coast Guard · PURCHASE TWO (2) IFF TEST SETS | $66,790 |
Source: USAspending.gov, retrieved 2026-11-07. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.