Housing, Transmission: requirements and submission rules
24 requirements and 8 submission rules found in the solicitation documents for 70Z03826QJ0000278. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Attachment 1 - Terms and Conditions 70Z03826QJ0000278 Page 3 of 22 (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph I of FAR 52.240-91, Security Prohibitions and Exclusions.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.” (2) F ASCSA Orders.
- (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1I(2)).
- (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- (iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
Requirements
| ID | Requirement |
|---|---|
| R1 | Should the government receive responsive offers from responsible sources that can provide new manufactured Housing, Transmissions with documentation that they are authorized/licensed by the Original Equipment Manufacturer (OEM), Hamilton Sundstrand (Cage Code 73030), the solicitation will be amended accordingly to consider any offers received. If deemed necessary, other than cost and price will be requested from the offeror. |
| R2 | The contractor shall indicate whether they will accept the inclusion of FAR clause 52.217-6 in any order awarded as a result of this solicitation. If yes, the contractor should indicate whether they will honor the clause through one year after date of award or provide the last date they will honor pricing for additional orders. |
| R3 | By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)— (1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and (2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g). |
| R4 | By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph (g). |
| R5 | By submission of its offer, the offeror certifies, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), that the offeror does not conduct any restricted business operations in Sudan. |
| R6 | Except as provided in paragraph (f)(2) of this provision or if a waiver has been granted in accordance with FAR 40.203-3, the offeror, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), by submission of its offer— (i) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran; (ii) Certifies that the offeror, or any person (as defined at section 15 of the Iran Sanctions Act of 1996, Pub. L. 104-172, 50 U.S.C. 1701 note) owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Act... and (iii) Certifies that the offeror, and any person owned or controlled by the offeror, does not knowingly engage in any transaction that exceeds $10,000 with Iran’s Revolutionary Guard Corps or any of its officials, agents, or affiliates... |
| R7 | If the disclosure provided does not contain any of the information required by paragraph (1), and the Offeror later discovers new information that is required by paragraph (1), then the Offeror shall submit a subsequent disclosure within 72 hours of discovering the new information. |
| R8 | The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. |
| R9 | The Contractor shall, immediately upon discovery, notify and disclose conditions to the Contracting Officer of any event, supply change, material change, supply malfunction, counterfeit/suspect parts or materiel, defect or non-airworthy condition of any product or component (to include components used in repairs) found to potentially cause a non-conformity to the original specifications of this order. The Government reserves the right to inspect any non-conforming product or component. Therefore, the Contractor shall obtain approval from the Contracting Officer prior to the disposition of any non-conforming product or component. |
| R10 | The Contractor’s quality control manual shall address in detail the Contractor’s risk management, test, inspection, non-conforming product and counterfeit/suspect parts processes. |
| R11 | The Contractor shall immediately notify the Contracting Officer of any changes that potentially have an impact on the product. Changes may include but are not limited to products, processes, material, supplier sources, manufacturing facility location and personnel qualifications. |
| R12 | The Contractor shall allow the Government access to all applicable areas of the Contractor’s facilities to ensure compliance with contractual requirements. |
| R13 | The Contractor shall retain all records in accordance with FAR 4.7 Contractor Records Retention. The Contractor shall be required to permit Government access to applicable records retained at any level of the supply chain. |
| R14 | Unless otherwise specified, the Contractor shall flow down all requirements in this order to their supply chain, to include all subcontractors and suppliers. |
| R15 | The container shall be packed and labeled suitable for shipment via land, air, or sea. Packaging material shall NOT consist of the following: popcorn, shredded paper, Styrofoam of any type, or peanut packaging. |
| R16 | Each part shall be individually packed in a separate envelope, box, carton or crate. For bulk packages, packaging of material up to 100 each per package is acceptable. Each individual container shall be labeled on the inside with National Stock Number, Part Number, Serial Number, Quantity, Nomenclature, Purchase Order Number, and Purchase Order Line-Item Number. Packing List and Certification/Documentation shall be placed on the outside of individual containers. |
| R17 | The internal packing material shall be sufficient to prevent damage during shipment, handling, and storage. Preservation and protection shall be provided to prevent corrosion, deterioration, or decay during warehouse storage for a period of one year. |
| R18 | Items shall be shipped to the following address: USCG Aviation Logistics Center Receiving Section, Bldg. 63 1664 Weeksville Road Elizabeth City, NC 27909-5001 Purchase Order Number: [to be determined] |
| R19 | A Certificate of Conformance (COC) IAW FAR 52.246-15 shall be required for all items provided on this order. The COC must include the National Stock Number, Part Number, Serial Number, and Purchase Order Number and must be signed by the Contractor’s authorized representative. |
| R20 | Full and clear traceability must be provided with delivery of each part. If full and clear traceability is not provided, ALC will not accept delivery of the part and invoicing may not be approved for payment. |
| R21 | Certificate of Conformance in accordance with FAR 52.246-15 is required. |
| R22 | F.O.B. Destination is requested as the delivery term for all deliverables. All offers will be considered F.O.B. Destination unless F.O.B. origin is specified AND estimated shipping costs are included. |
| R23 | The Contractor’s invoice and the completed DD-250 (when required) shall be prepared IAW FAR 52.212-4 and sent to the billing office below. |
| R24 | The final invoice submitted under the awarded contract shall be clearly marked and labeled FINAL. |
Recent awards in NAICS 336413
The newest federal contract awards in the same industry code from Department of Homeland Security, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-02-05 | HABCO INDUSTRIES LLCU.S. Coast Guard · TIRE CAGE FOR THE NEW USCG HAIWING | $18,900 |
| 2026-11-13 | AVIATRIX INCU.S. Coast Guard · PURCHASE OF THE FRAME ASSY, MR PYLON FOR USE ON USCG MH-60T HELICOPTERS. | $63,992 |
| 2026-11-13 | SOC - CONSILIUM CORPU.S. Coast Guard · PROCUREMENT OF 10 EA OF AIRCREWMAN SEATCOVERS FOR USE ON THE MH-65 AIRCRAFT | $5,740 |
| 2026-11-13 | MISSION SYSTEMS DAVENPORT INC.U.S. Coast Guard · PROCUREMENT OF 5 EA OF MECH, HARNESS ASSY FOR USE ON THE MH-65 AIRCRAFT. | $48,408 |
| 2026-11-13 | SIKORSKY AIRCRAFT CORPORATIONU.S. Coast Guard · PURCHASE OF THE BRACKET TO BE UTILIZED ON USCG MH-60T HELICOPTERS. | $3,526 |
| 2026-11-13 | WILKERSON COMPANY INCORPORATEDU.S. Coast Guard · PROCUREMENT OF HC-144 AIRCRAFT TIRES. | $43,375 |
Source: USAspending.gov, retrieved 2026-11-17. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.