RFP - Maloney Canine Vet Clinic Addition: requirements and submission rules
14 requirements and 15 submission rules found in the solicitation documents for 70US0927R70094253. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- If additional clarification is necessary, the bidders must submit in writing a formal request for information (RFI) to the Contracting Officer.
- Initial/Interim CQC Plan due no later than 14 days after NTP (which shall include document control procedures for Pre-Construction, design and construction submissions) b.
- All submittals shall also be reviewed by the Contractor’s Quality Control Manages (QCM) and contain the QCM’s stamp with signature.
- Any problems in incorporating these standards due to conflicts with other technical criteria shall be promptly submitted to the Safety, Health and Environmental Programs Division and Contracting Officer for decision.
- Submittals: All construction submittals such as Pre Construction, design, shop-drawings and close-out documents shall be reviewed by the DOR and contain the DOR approval stamp with signature and date along with corresponding specification number and paragraph, variation / deviation notification, and whether the submittal is For Information Only (FIO) or Government Acceptance (GA).
- The Contractor shall respond to these comments by providing their responses on the same spreadsheet within seven business days after the Government submits comments. c.
- All applicable plans, permits, prerequisite submittals, and safety considerations shall be submitted and accepted prior to any demolition or construction.
- Outage Requests, with an outage work plan, shall be submitted to the Government 14 calendar days in advance of the outage activity.
- For areas of work where traffic flow or pedestrian safety is altered or endangered, the Contractor shall submit a temporary traffic control plan to include signage for Government review and acceptance prior to mobilization.
- The IPS shall be submitted with a schedule narrative as required by the Schedule Narrative section of this RFP.
- 31 | Page submit for Government acceptance, a recovery plan and schedule to demonstrate how the Contractor anticipates regaining adequate progress such that all work required by the contract shall be completed within the contract period of performance.
- NFPA 13 Contractor’s Material and Test Certificate for Aboveground Piping: The Contractor shall submit this document for Government Acceptance to document the successful installation and testing of the sprinkler system.
- Meeting Agenda: The Contractor shall submit the following to the Government 24 hours in advance of the progress meeting: a.
- Note Key Personnel approved by the Contracting Officer in the successful proposal shall function in the same roles in this contract.
- The Contractor shall ensure that each of the design submissions adhere to the approved DQC Plan and shall include dual approval signatures of both the DOR and the QCM prior to submission to the Government for each review i.
Requirements
| ID | Requirement |
|---|---|
| R1 | A conceptional design showing a Top, Side, and Front View of the entire construction project with dimensions site capturing minimum requirements for size, dimensions, and slopes shall be included in the Technical Proposal. |
| R2 | Offerors who submit a proposal must attend a pre-bid site visit that will be scheduled during the solicitation period to verify field conditions referenced in this SOW.Section A |
| R3 | When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.Section A |
| R4 | The Contractor’s services shall consist of a single company capable of providing Architectural/Engineering (A/E) design services related to the design of this addition in its entirety.Section A |
| R5 | Products shall be in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications for commercial-grade equipment and materials under similar circumstances and of similar sizes.Section A |
| R6 | Project Manager shall be an employee of the Prime Contractor. Project Manager with at least 15 (fifteen) years of experience managing similar design-build construction projects. When listing project experience on the resume, demonstrate project experience where the role of Project Manager was performed in a similar environment.Section A |
| R7 | Superintendent shall be an employee of the Prime Contractor. On-site construction supervisor with at least 10 (ten) years continued and dedicated experience managing similar projects. When listing project experience on the resume, demonstrate project experience where the role of Construction Superintendent was performed on a similar project.Section A |
| R8 | EM 385-1-1 (Safety and Health Requirements Manual) compliant Site Safety Health Officer (SSHO) for Federal Construction Projects with 10 (ten) years demonstrated experience where the role of Safety Officer was performed in a similar environment. The SSHO must report directly to the prime contractor principal executive officer; not the project manager or construction superintendent or other site supervision.Section A |
| R9 | Construction Quality Control Manager shall be an employee of the Prime Contractor. The CQCM must report directly to the prime contractor principal executive officer; not the project manager or construction superintendent or other site supervision. Construction Quality Control Manager with 10 (ten) years continuous and dedicated experience managing similar construction projects. When listing project experience on the resume, demonstrate where the role of Construction Quality Control Manager was performed.Section A |
| R10 | Designer of Record shall be a registered engineer or architect with 15 (fifteen) years demonstrated relevant experience as a Designer of Record on similar projects.Section A |
| R11 | Design Quality Control Manager must be a registered engineer or architect with 10 (ten) years relevant project experience.Section A |
| R12 | Commissioning Manager with 7 (seven) years demonstrated relevant experience on similar projects. |
| R13 | All contactor personnel requesting access to JJRTC must be a U.S. citizen.Section A |
| R14 | All contractor personnel must be compliant with the REAL ID Act, passed by Congress in 2005, as it pertains to acceptable forms of Identification for accessing federal facilities.Section A |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Homeland Security, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-20 | FMS PROVIDER LLCU.S. Coast Guard · TRAINING ROOM SERVING AREA RENOVATION AT USCG CEU MIAMI. | $25,493 |
| 2026-11-19 | SOUTHWEST VALLEY CONSTRUCTORS COU.S. Customs and Border Protection · DESIGN-BUILD A BORDER PATROL CHECKPOINT LOCATED IN INDIO CALIFORNIA STATE ROUTE 86 (SR86) | $68.00 million |
| 2026-11-19 | SOUTHWEST VALLEY CONSTRUCTORS COU.S. Customs and Border Protection · DESIGN BUILD BORDER PATROL CHECKPOINT IN CARRIZO SPRINGS, TX | $48.00 million |
| 2026-11-19 | SOUTHWEST VALLEY CONSTRUCTORS COU.S. Customs and Border Protection · DESIGN-BUILD A BORDER PATROL CHECKPOINT LOCATED IN EAGLE PASS, TX. | $56.00 million |
| 2026-11-19 | SOUTHWEST VALLEY CONSTRUCTORS COU.S. Customs and Border Protection · DESIGN-BUILD A BORDER PATROL CHECKPOINT LOCATED IN KINGSVILLE, TX | $111.00 million |
| 2026-11-16 | WHITING-TURNER CONTRACTING COMPANY, THEU.S. Coast Guard · USCGA STEM BUILDING DESIGN BUILD | $155.00 million |
Source: USAspending.gov, retrieved 2026-11-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.