CO OMAD 300(71) Minuteman Missile Access: requirements and submission rules
17 requirements and 15 submission rules found in the solicitation documents for 6982AF27B000010. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Do not include quantities unless measurement notes for those quantities were submitted by the closing date.
- Provide instruments with internal calibration and triaxial orthogonal transducers with flat frequency response from 2 to 250 hertz with a sampling rate of at least 1000 data points per second with sufficient memory 116
- Submit the request to increase the sampling frequency at least 48 hours before starting production.
- If colored concrete is required, submit preliminary samples of the colored concrete according to Subsection 601.03(b).
- Submit additional information as requested to allow the CO to determine the reasonableness of the proposed price.
- Do not include quantities of work involving material for which test reports required under Sections 153 and 154, or certifications required by Subsection 106.03 are, or will be, past due as of the closing date.
- Submit drawings and calculations for approval according to Subsection 104.06(a)(1) that bear the seal and signature of a professional engineer who is proficient in the applicable design field before starting work.
- Provide a copy of the reviewed submittals and certifications signed by the QCM.
- Submit certification signed by the Worker Health and Safety Officer at completion of the project that the worker health and protection plan complied with all regulations and was fully implemented.
- Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged.
- Submit documents and drawings according to Subsection 104.04.
- Submit samples of material for source quality verification testing for material if requested.
- Submit one commercial certification for similar material from the same manufacturer.
- Submit a hazardous spill plan as required by Federal, state, or local regulations at least 2 days before start ing work.
- Submit the original records and a written certification as to the accuracy of the masses at the end of each shift.
Requirements
| ID | Requirement |
|---|---|
| R1 | Follow the requirements of FAR Provision 52.214- 18 Preparation of Bids-Construction. |
| R2 | Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. |
| R3 | Multiply the unit bid price by the quantity for each pay item and show the amount bid. |
| R4 | If "LPSM" appears as a unit of measure in the bid schedule, insert an amount bid for each lump sum pay item. |
| R5 | If "CTSM" appears as a unit of measure in the bid schedule, include the Government inserted amount for the pay item in the total bid amount. |
| R6 | Total the amounts bid for each pay item and show the total bid amount. |
| R7 | Follow the requirements of FAR Clause 52.228-1 Bid Guarantee. |
| R8 | Follow the requirements of FAR Clause 52.228-11 Individual Surety-Pledge of Assets. |
| R9 | Complete and date the SF 28, Affidavit of Individual Surety after the solicitation date. |
| R10 | The individual surety shall personally sign the SF 28. |
| R11 | Bidders cannot serve as their own surety. |
| R12 | Substitution of individual sureties to support a bid bond after the bid opening will not be allowed. |
| R13 | After reviewing the SF 28 and documentary information on the security interest and the assets pledged, the CO may request the surety to submit further information and documents with respect to the documents submitted. The information may be required to be provided under oath. Failure of the surety to respond with the requested information or documents within 7 days of receipt of the request is cause for rejection of the surety. |
| R14 | Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction. |
| R15 | Use SF 25, Performance Bond and SF 25A, Payment Bond for submitting the bonds. |
| R16 | Follow the requirements of Subsections 102.03 and 102.04. |
| R17 | A Contractor submitting an unacceptable individual surety in satisfaction of a performance or payment bond before the issuance of the NTP will be allowed one opportunity to substitute an acceptable surety or sureties within 7 days of receipt of notification that the surety is unacceptable. |
Recent awards in NAICS 237310
The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-15 | GCS LLCFederal Highway Administration · CO NP BLCA 10(1) SOUTH RIM DRIVE IMPROVEMENT GUARDRAIL REPLACEMENT INSTALLATION | $956,200 |
| 2026-11-01 | WAM INDUSTRIES, INCORPORATEDFederal Aviation Administration · ATL ARSR GRAVEL INSTALLATION & BLDG. IMPROVEMENTS | $353,800 |
| 2026-09-22 | FRANK GURNEY INCFederal Aviation Administration · QMI GUARDRAIL REPLACEMENT | $345,000 |
| 2026-09-11 | HERBACK GENERAL ENGINEERING LLCFederal Highway Administration · CA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA | $1.57 million |
| 2026-09-01 | DANHILL CONSTRUCTION COMPANYFederal Highway Administration · PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL | $5.35 million |
| 2026-09-01 | ADAMS CONTRACTING COFederal Highway Administration · TN ERFO FS CHRKE804 2020-2(2): THE PROJECT CONSISTS OF REPAIRING VARIOUS DAMAGED SITES ON MCFARLAND ROAD (FS 23). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMEN | $5.63 million |
Source: USAspending.gov, retrieved 2026-10-31. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.