TenderAxiom

TenderAxiom · Opportunities

CO OMAD 300(71) Minuteman Missile Access: requirements and submission rules

14 requirements and 15 submission rules found in the solicitation documents for 6982AF27B000010. Use them as the start of your compliance matrix.

Solicitation number
6982AF27B000010
Agency
TRANSPORTATION, DEPARTMENT OF / FEDERAL HIGHWAY ADMINISTRATION / 6982AF CENTRAL FEDERAL LANDS DIVISI
NAICS
237310
Set-aside
Small Business Set Aside - Total
Responses due
02 December 2026 (4 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Do not include quantities unless measurement notes for those quantities were submitted by the closing date.
  • Provide instruments with internal calibration and triaxial orthogonal transducers with flat frequency response from 2 to 250 hertz with a sampling rate of at least 1000 data points per second with sufficient memory 116
  • Submit the request to increase the sampling frequency at least 48 hours before starting production.
  • If colored concrete is required, submit preliminary samples of the colored concrete according to Subsection 601.03(b).
  • Submit additional information as requested to allow the CO to determine the reasonableness of the proposed price.
  • Do not include quantities of work involving material for which test reports required under Sections 153 and 154, or certifications required by Subsection 106.03 are, or will be, past due as of the closing date.
  • Submit drawings and calculations for approval according to Subsection 104.06(a)(1) that bear the seal and signature of a professional engineer who is proficient in the applicable design field before starting work.
  • Provide a copy of the reviewed submittals and certifications signed by the QCM.
  • Submit certification signed by the Worker Health and Safety Officer at completion of the project that the worker health and protection plan complied with all regulations and was fully implemented.
  • Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged.
  • Submit documents and drawings according to Subsection 104.04.
  • Submit samples of material for source quality verification testing for material if requested.
  • Submit one commercial certification for similar material from the same manufacturer.
  • Submit a hazardous spill plan as required by Federal, state, or local regulations at least 2 days before start ing work.
  • Submit the original records and a written certification as to the accuracy of the masses at the end of each shift.

Requirements

IDRequirement
R1Follow the requirements of FAR Provision 52.214-18 Preparation of Bids-Construction.
R2Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule.
R3Multiply the unit bid price by the quantity for each pay item and show the amount bid.
R4If "LPSM" appears as a unit of measure in the bid schedule, insert an amount bid for each lump sum pay item.
R5If "CTSM" appears as a unit of measure in the bid schedule, include the Government inserted amount for the pay item in the total bid amount.
R6Total the amounts bid for each pay item and show the total bid amount.
R7Follow the requirements of FAR Clause 52.228-1 Bid Guarantee.
R8Follow the requirements of FAR Clause 52.228-11 Individual Surety-Pledge of Assets.
R9Complete and date the SF 28, Affidavit of Individual Surety after the solicitation date.
R10The individual surety shall personally sign the SF 28.
R11Bidders cannot serve as their own surety.
R12Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction.
R13Use SF 25, Performance Bond and SF 25A, Payment Bond for submitting the bonds.
R14Follow the requirements of Subsections 102.03 and 102.04.

Recent awards in NAICS 237310

The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-01WAM INDUSTRIES, INCORPORATEDFederal Aviation Administration · ATL ARSR GRAVEL INSTALLATION & BLDG. IMPROVEMENTS$353,800
2026-09-22FRANK GURNEY INCFederal Aviation Administration · QMI GUARDRAIL REPLACEMENT$345,000
2026-09-11HERBACK GENERAL ENGINEERING LLCFederal Highway Administration · CA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA$1.57 million
2026-09-01DANHILL CONSTRUCTION COMPANYFederal Highway Administration · PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL$5.35 million
2026-09-01ADAMS CONTRACTING COFederal Highway Administration · TN ERFO FS CHRKE804 2020-2(2): THE PROJECT CONSISTS OF REPAIRING VARIOUS DAMAGED SITES ON MCFARLAND ROAD (FS 23). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMEN$5.63 million
2026-09-01CEKRA INCFederal Highway Administration · MT PRAIRIE 2016(3), MILWAUKEE BRIDGE RESURFACING AND REHABILITATION: CONSTRUCTION SERVICES ON WFL PROJECT MT PRAIRIE 2016(3) / MILWAUKEE BRIDGE RESURFACING AND REHABILITATION. THIS WORK CONSISTS OF: R$8.54 million

Source: USAspending.gov, retrieved 2026-10-28. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.