Morales, TX (QNA) ARSR - Repair/Replace Building and Exterior Items to Correct Water Damage, Prevent Water Intrusion: requirements and submission rules

43 requirements and 15 submission rules found in the solicitation documents for 6973GH-27-R-00042. Use them as the start of your compliance matrix.

Solicitation number
6973GH-27-R-00042
Agency
TRANSPORTATION, DEPARTMENT OF / FEDERAL AVIATION ADMINISTRATION / 6973GH FRANCHISE ACQUISITION SVCS
NAICS
236220
Set-aside
Small Business Set Aside - Total
Responses due
23 December 2026 (25 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • (h) If the contractor wants to discuss a past performance evaluation, requests must be submitted in writing to the AO no later than seven days following the date the FAA submits an evaluation to CPARS.
  • CST Wednesday 9 December 2026 Site visits may be arranged during normal duty hours by contacting: (c) All questions clarifications or explanations from the site visit must be submitted in writing to the contracting officer and are due by NLT 5:00 P.M.
  • The Offeror must provide immediate written notice to the Contracting Officer if at any time prior to award the Offeror and/or any of its principals learns that any certification or representation in SAM or on VetCert was erroneous when this proposal/offer was submitted or has become erroneous by reason of changed circumstances.
  • To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.
  • (e) We will not be responsible for any failure attributable to transmitting or receiving the offer, unless it falls under section (a) of AMS provision 3.2.2.3-14 "Late Submissions, Modifications, and Withdrawals of Submittals".
  • (2) In procurements where proposals are requested, alleged improprieties that do not exist in the initial solicitation, but which are subsequently incorporated into the solicitation, must be protested not later than the next closing time for receipt of proposals following the incorporation.
  • If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing.
  • (i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications.
  • (2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.
  • (2) The Contractor must not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims.
  • Assignees must be separately registered in the SAM database.
  • (End of Clause) 3.4.1-4 PERFORMANCE BOND REQUIREMENTS (JAN 2017) (a) The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price, but for this contract the amount required by the Contracting Officer is [ ].
  • Page 27 Yes [X] No [ ] DHS FASCSA orders Yes [ ] No [X] DoD FASCSA orders Yes [ ] No [X] DNI FASCSA orders (2) The Contractor must search for applicable FASCSA orders of the type identified in paragraph (b)(1) of this clause in the System for Award Management (SAM).
  • The Contractor or higher-tier subcontractor must notify their subcontractors, and suppliers under other contractual instruments, that the FASCSA orders in the SIR that are not in SAM apply to the contract and all subcontracts.
  • However, the contractor will not be able to sign and submit the evaluation back to the Government without a statement in the Contractor Comments section.

Requirements

IDRequirement
R1The contractor is responsible for furnishing all materials (unless noted otherwise in the contract documents), equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary for the for the Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion of the ARSR building in accordance with the applicable drawings, specifications and conditions of the contract.
R2Replace exterior all door hardware with lever handles, all lockset cylinders and add panic hardware on Emergency Generator and Equipment Room doors. They must comply with BHMA Grade 1 system that accepts a universal 7-pin removable and interchangeable core.
R3Only replace the Equipment Room exterior doors and frames with 14 gauge steel, label “B” fire rated doors to comply with FAA 1600.69D 4-3-13. Other existing doors and frames remain.
R4The main entrance double door holds a CDX-10 lock and a Hoffman box. The Contractor must coordinate and pay for a GSA-certified locksmith to remove it and reinstall it in the new door.
R5Power wash top and sides of metal cable trays and the steel supports. Protect the underside of the cable trays that may damage the cables.
R6Remove all old dried, cracked or compromised sealant and replace with new for the entire building. This includes inside and outside building vertical control joints, building to foundation joints, concrete door stoops, ductwork and pipe penetrations, soffit, siding and frieze board to wall joints and weatherhoods.
R7Clean out and reseal the building eight vertical wall control joints, outside CMU and inside 5/8” fire retardant plywood walls. Replace backer rods and reseal joints. Sika WS-295 silicone sealant meets ASTM C920.
R8Move furniture, shelves, et cetera, temporarily to perform the interior floor wall and ceiling joint repairs and painting then return it to the initial location when the work is completed. Protect the items attached to the walls not to be painted and equipment that cannot be moved from paint drips and damage, e.g. conduits, remove receptacle and switch covers temporarily for painting, shield ARSR equipment, et cetera.
R9Plywood Sheathing. Where the interior walls are covered with 5/8” 4’ x 8’ fire retardant plywood sheets, strip and clean off all of the accessible joint compound taped plywood panel joints, cut about a 3/8” deep vee groove in joints where sheets meet. Fill the vee grooved joints with water based DAP 3 in 1 Premium Wood Filler, Item no. 101513. Then sand for smooth surface for painting per item 6.a. below.M.3
R10Gypsum Board Sheathing. Where the walls and suspended ceiling are gypsum board, clean off all the existing taped joints, cut about a 3/8” vee in joints where sheets meet. Fill the vee grooved joints with joint compound, cover joints with mesh tape (aka FIBA tape). Apply joint compound smoother out over the tape. Then sand surface for painting per item 6.a. below.M.3
R11Add or replace damaged or missing exterior doors items: exterior moldings Door Jamb Adhesive-Backed Fire/Smoke Silicon Gasketing around all 8 door frames; Heavy Duty Aluminum Brush Door Sweep for thresholds flush mounted on each of the 8 door leaves. Products to meet grade 1 ANSI/BHMA A156 standards as applicable.
R12Apply two coats of water repellant per manufacturer directions to all surfaces of the exterior CMU block wall surfaces and exposed concrete foundation after they have been power washed, cleaned and dried properly. Protect adjacent surfaces and items from repellant drips and spray. Use Foundation Armor SX5000 siloxane-silane blend.M.3
R13Replace all damaged and mold/mildew stained acoustical ceiling tiles. Maintain the existing ceiling tile pattern of 24 by 48 inch tiles. Field verify the number to be replaced prior to ordering and provide 6 extra tiles to the COR for the SSC future use.
R14Contain dust to protect ARSR equipment, shield the equipment, do not cover to prevent any equipment overheating damage.
R15Replace all resilient vinyl composition tiles (VCT) floor tiles and bases with new Contractor Furnished Material (CFM) floor tiles and bases except for those areas specifically covered by the equipment. Provide Armstrong - Standard Excelon Imperial texture, 1/8” Fortress White 12" x12" SKU: 51839 (45 sf/box) or Contracting Officer approved equivalent or better.
R16Move furniture to perform the new flooring installation and return it to the initial location when the work is completed. Provide enough storage boxes (aka Conex boxes) for temporary storage of furniture, shelving, et cetera on site to execute the project work until all stored items are returned to their initial locations inside of the building.
R17Following power washing of cable trays, reattach the underside loose cover. Galvanized cable trays from equipment building to tower and the structural supports and similar adjacent items shall be abraded, sand medium, clean, non-greasy, and uncontaminated from salt and other chemicals for paint coats to adhere better. Apply 3 coats of Rust Grip® per Section 0991 13.42 Miscellaneous Exterior Paint. Second and third coat must be applied before Rust Grip® first coat has fully cured to avoid adhesion issues. The surface must also be dry during application.
R18Replace the two existing gable attic louver exhaust fans, controls, and provide grounding in accordance with FAA-STD-19G. After fan and control installation, test for functionality.
R19Provide and maintain a portable toilet on site for the duration for as long as the construction personnel are on site.
R20Provide specified manufacturer and contractor warranties.
R21Except as provided in paragraph (f) of this clause, the Contractor must submit payment requests in electronic form.Section B
R22Contractors submitting invoices are required to submit invoices via the Delphi eInvoicing web portal which is accessed and authenticated via www.login.govSection B
R23Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA-1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm.Section H (special requirements)
R24The Contractor must perform, using its own organization, work equivalent to at least 51 percent of the total amount of work under the contract on the site.Section I (contract clauses)
R25The Contractor must (a) begin work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than [CO insert date].Section I (contract clauses)
R26In performing this contract, the Contractor must not use asbestos or asbestos-containing building materials during construction, renovation, and/or modernization of this facility.Section I (contract clauses)
R27The Contractor must provide to the Contracting Officer (CO) a signed statement by project completion indicating that no asbestos or asbestos-containing building materials were used during construction, renovation, and/or modernization of this facility.Section I (contract clauses)
R28The Contractor must use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.Section I (contract clauses)
R29The Contractor is prohibited from- (1) Providing any Kaspersky Lab covered article that the Government will use; and (2) Using any Kaspersky Lab covered article in the development of data or deliverables first produced in the performance of the contract.Section I (contract clauses)
R30The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor's employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that a waiver has been granted in accordance with AMS Guidance T3.8.9C.3.c.(2).Section I (contract clauses)
R31Unless an applicable waiver has been issued by the issuing official, Contractors are prohibited from providing or using as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by any applicable FASCSA orders identified by the checkbox(es) in this paragraph (b)(1).Section I (contract clauses)
R32The Contractor must furnish the Contracting Officer with the name, position title, phone number, and email address for each person(s) designated to have access to past performance evaluation(s) for this contract no later than 30 days after award.Section I (contract clauses)
R33The Contractor must notify the Contracting Officer within 2 (two) hours of discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment.Section I (contract clauses)
R34All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take FAA-provided records management training upon starting under the contract and annually thereafter as per the FAA Electronic Learning Management System (eLMS).Section I (contract clauses)
R35The Contractor will not engage in any racially discriminatory DEI activitiesSection I (contract clauses)
R36The FAA requires a minimum acceptance period of 60 calendar days.Section K (representations)
R37The offeror (you) must submit responses to this SIR by the following electronic means email Your offer must arrive at the place and by the time specified in the SIR.Section L (instructions to offerors)
R38Send your offer to Ed Wright at Edward.B.Wright@faa.gov.Section L (instructions to offerors)
R39An optional site visit will be conducted and if you wish to attend, advance notice is required at least 7 days in advance. Please submit the below information to Ed Wright at Edward.B.Wright@faa.gov. Please list all attendees planning to attend.Section L (instructions to offerors)
R40The Offeror must complete and submit a minimum of two (2) Experience Information Forms. All blocks must be filled in and all data must be accurate, current, and complete. All projects submitted must have been underway or completed within the last five (5) years and the projects must be valued at over $100,000.M.3
R41Each Experience Information Form must include a contact information for the Point of Contact (POC) on a previous project i.e. email address and phone number.M.3
R42The Offeror must submit a separate narrative of HOW, in general, they intend to accomplish the requirements solicited in the solicitation. No pricing information is to be submitted within the narrative.M.3
R43The Offeror must include a proposed work plan of WHAT specifically will be done to accomplish the solicitation requirements listed below. No pricing information shall be submitted within the work plan.M.3

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-19RYAN COMPANIES US INCFederal Aviation Administration · DESIGN BUILD SERVICES PRECONSTRUCTION PHASE 1 - CENTRAL FLORIDA$2.29 million
2026-11-19RYAN COMPANIES US INCFederal Aviation Administration · DESIGN BUILD SERVICES PRECONSTRUCTION PHASE 1 - NORTH TEXAS$2.21 million
2026-11-17AIRFIELD WESTERN LLCFederal Aviation Administration · REPLACE THE EXISTING RUNWAY 8L MEDIUM INTENSITY APPROACH LIGHTING (MALSR) SYSTEM AT THE ONTARIO INTERNATIONAL AIRPORT, ONTARIO, CA. THE PROJECT INCLUDES THE DEMOLITION OF SELECTED PORTIONS OF THE EXIS$1.41 million
2026-11-05GUARDIAN CONSTRUCTION, INC.Federal Aviation Administration · DENVER (DEN) AIR TRAFFIC CONTROL TOWER (ATCT) FIRE LIFE SAFETY UPGRADES$181,705
2026-10-22EMCOR GOVERNMENT SERVICES, INCImmediate Office of the Secretary of Transportation · DOT HQ - 07 & 09 FURNITURE RECONFIGURATION - OPTION 2$391,595
2026-10-19HIGH COUNTRY CONTRACTORS INCFederal Aviation Administration · LAWTON, OK - LAW LOC SHELTER REPLACEMENT IN LAWTON, OK IN ACCORDANCE WITH THE APPLICABLE DRAWINGS, SPECIFICATIONS AND CONDITIONS OF THE CONTRACT.$161,896

Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.