Graphic Design Support Services for the U. S. Department of Transportation (DOT): requirements and submission rules
16 requirements and 15 submission rules found in the solicitation documents for 693JK427R500001. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 11:30 PM EST local time (Hour) 12/3/2027 (Date) CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No.
- If you have been using those older systems, you should now go to www.sam.gov to complete the Online Representations and Certifications Application (ORCA) by the due date of the proposal submission.
- Offerors registering in the SAM system for the first time should therefore allow sufficient time to complete the representations and certifications process prior to the due date for proposal submissions.
- There is no minimum-font-size or prescribed font-style for proposals submitted to DOT in response to this Solicitation—but each offeror’s proposal shall be fully-legible.
- Proposal-Submission-Deadline: 11:30 PM Eastern Standard Time, December 3, 2027.
- All proposals must be received by DOT, via E- MAILED submission, by this Solicitation’s Proposal-Submission-Deadline.
- The Contractor shall submit information to support the proposed action to enable the contracting officer to evaluate the potential impact of the change on the contract.
- Each offeror shall show, on the front page of each proposal-volume submitted to DOT in response to this Solicitation, the following information: 1.
- It is preferred that the Offeror's acceptance period be not less than 180 days after this Solicitation’s proposal-submission-deadline, in order to allow DOT sufficient time to evaluate the proposals.
- The following information shall be submitted to assist the Contracting Officer in making a responsibility determination: Provide the following information in your Cost Proposal Part: a.
- Deviations or Conditional Assumptions (No Page Limit) The Offeror shall explain in detail any deviations or conditional assumptions taken with the requirements of this Solicitation.
- Payment of Fixed Rates The Contractor shall submit monthly vouchers to the payment office in Section G of this contract for actual number of quantities provided/performed for the period listed in the of delivery order or contract.
- H.2 NON-DISCLOSURE All Contractor personnel who will be personally and substantially involved in the performance under this Contract shall execute and submit a Non-Disclosure Agreement prior to the commencement of any work.
- H.4.1.6 On an annual basis, the contractor shall submit verification to the Contracting Officer that the IT Security Plan remains valid.
- Two copies of any material proposed to be published or distributed shall be submitted to the Contracting Officer.
Requirements
| ID | Requirement |
|---|---|
| R1 | All proposals shall be e-mailed to all of the following DOT E-Mail addresses: james.mowery@dot.gov ; and Jeffrey.McLean@dot.gov and Briyanah.Harris@dot.gov |
| R2 | This Graphic Design Solicitation is a competitive Woman-Owned SMALL-business-set-aside acquisition... each offeror-company’s average annual gross-revenue, as computed across the offeror-company’s five most-recently-completed company-fiscal years, must be LESS than $9,000,000.B.1 |
| R3 | In order to qualify for inclusion in this Solicitation’s eligible group of Woman-Owned small-business-prime-offerors, prospective offerors shall note, and shall comply with, the following requirements “A” and “B”: A. The prime offeror must fit within this Solicitation’s specified NAICSs Code and associated small-business-size-standard; and B. In addition to satisfying the average-annual-gross-revenue-limit specified in requirement A immediately above, each prime-offeror-company submitting a proposal under this Solicitation must also be a Woman-owned small-business proposing to itself perform more than half of this project’s total work, in order for the prime-offeror-company to qualify as a Woman-owned small-business-prime-offeror.L.2 |
| R4 | Each offeror’s Cost Proposal shall show, and shall price out. precisely the configuration of staffing-hours which is displayed in the Pricing Table given below. And each offeror’s Cost Proposal shall show a fully-LOADED-hourly-billing-rate for each particular labor-category (job-title) for each particular project-year. Accordingly, each offeror’s Cost Proposal shall display a filled-in-by-the-offeror version of the following Graphic Design Support Services Pricing TableB.2 |
| R5 | To be eligible for award of a contract resulting from this solicitation, the Offerors must be registered in the Federal Government’s “System for Award Management” (SAM), AND be registered in the Federal Government “Online Representations and Certifications Application” (ORCA).Section K (representations) |
| R6 | All Offerors and prospective contractors must be registered in the System for Award Management (SAM) with their Online Representations and Certifications Applications (ORCA) at https://www.sam.gov/ or must provide a completed copy of 52.212-3 with their quotation.Section I (contract clauses) |
| R7 | DOT asks that each particular offeror company please present its proposal in the following labelled Parts: Part I Proposal: Technical Capability... Part II Proposal – Past Performance... Part III Proposal– Cost Proposal / Price Proposal, and Financial Information for Offeror-CompanySection L (instructions to offerors) |
| R8 | The contractor shall provide and maintain two adequately trained, knowledgeable Level II graphic designers to meet all CPPMO requirements detailed in this SOW. The contractor shall ensure its staff is thoroughly trained on current software, hardware, and systems used at DOT, as well as any future technology upgrades or changes. The contractor must also provide alternate backup personnel to ensure seamless coverage.B.2 |
| R9 | Key Qualifications & Requirements for Level II Graphic Designers: Education: Bachelor’s degree in Graphic Design, Visual Communications, Fine Arts, or a related field. (In some public/civil service classifications, a Master's degree in visual design or equivalent work experience satisfies senior/level 2 prerequisites). Work Experience: Typically 2 to 5 years of professional graphic design experience (agency or in-house). Portfolio: A strong, versatile portfolio demonstrating applied layout design, typography, brand alignment, print prepress, and digital asset creation.B.2 |
| R10 | Each offeror shall also include, in its Part III Proposal, the Financial / Organizational information described below in this Section L of this Solicitation. Financial / Organizational Proposal, which shall include: a recent offeror-balance-sheet and a recent offeror-income-statement (and possibly any lines-of credit) showing the offeror’s financial responsibility and capability for performing the project envisioned in this Solicitation; and screen-shots or other legible-copies of the offeror’s current SAM-registration-information / UEI-registration-information, and thereby confirming that the offeror has no current “exclusions”; and a statement specifying the details of any prior offeror-“exclusions” and any prior (or current) debarment of the offeror from Federal-contracting; and a displaying of a link or other citation to the precise place where DOT would be able to find the offeror’s Representations and Certifications that are applicable to this Solicitation; and an explicit confirmation that the offeror’s average annual gross revenue, as computed across the offeror-firm’s five most-recently-completed company-fiscal-years, is less than dollar-limit specified in this Solicitation’s above-specified NAICS Code. And the foregoing types of information shall also be presented for each and every subcontractor-company that the offeror-company is proposing to use in the performance of the project contemplated in this Solicitation.Section I (contract clauses) |
| R11 | The Offeror shall provide proof of insurance.L.3 |
| R12 | Please indicate your interest in participating in ADR by noting in your proposal whether or not you will participate in ADR.L.3 |
| R13 | The offeror must state that it agrees to all terms and conditions of this solicitation, which consists of this Solicitation’s Sections A through J, including all documents, exhibits, and all other attachments that are incorporated therein by reference and made a part thereof, or provide an explanation for any exceptions.L.3 |
| R14 | The contractor shall explicitly identify key personnel in the technical proposal and provide contact information for each.B.2 |
| R15 | All contract personnel must be able to successfully pass a background check and obtain a security clearance.B.2 |
| R16 | All contractor and subcontractor personnel working on this task order must be U.S. citizens.B.2 |
Recent awards in NAICS 541340
The newest federal contract awards in the same industry code from all federal agencies, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-10 | HENRY ADAMS, LLCNational Gallery of Art · MODERNIZATION DESIGN SERVICES | $171,329 |
| 2026-09-09 | AML-AMERICAN MADE LOGISTICSDepartment of Veterans Affairs · LIFE SAFETY DRAWING BLDG 26 | $14,790 |
| 2026-07-31 | STRATEGIC DEFENSE SOLUTIONS, LLCDepartment of the Army · THE PURPOSE OF THIS TASK ORDER IS FOR THE VENDOR TO DEVELOP STATEMENTS OF WORK FOR MULTIPLE FUTURE PROJECTS AT FORT HUNTER LIGGETT. | $81,630 |
| 2026-07-08 | Q-CAD, INC.Department of the Army · PERFORM CAD SERVICES AS DEFINED IN THIS PERFORMANCE WORK STATEMENT (PWS) FOR THE HYDROELECTRIC DESIGN CENTER (HDC) US ARMY CORPS OF ENGINEERS (USACE). | $15,355 |
| 2026-07-08 | DCMS SYSTEMS LLCDepartment of the Navy · LIDAR SERVICE FOR SCANNING | $10,675 |
| 2026-07-02 | Q-CAD, INC.Department of the Army · PERFORM CAD SERVICES AS DEFINED IN THIS PERFORMANCE WORK STATEMENT (PWS) FOR THE HYDROELECTRIC DESIGN CENTER (HDC) US ARMY CORPS OF ENGINEERS (USACE). | $5,600 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.