Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2): requirements and submission rules
23 requirements and 15 submission rules found in the solicitation documents for 693C73-27-B-000004. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 52.204-7 System for Award Management—Registration (DEVIATION NOV 2025) The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award.
- Contractors must input and maintain (update as necessary) their EFT information in the SAM database.
- Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from the Contract Opportunities website located at http://SAM.gov.
- To maintain an active registration in SAM, contractors shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
- The Offeror shall obtain and provide the following identifying information: (1) Unique entity identifier (UEI).
- (End of clause) 52.209-9 – Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management via https://www.sam.gov/.
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
- HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA: As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Bidder must submit prior to award a Material Safety Data Sheet (MSDSs) for all hazardous materials that the Bidder identifies in paragraph (b) of this clause in Section G of this booklet.
- INTERNET BASED DATABASES - REQUIRED INPUT: Per FAR Provision 52.204-7, bidders are required to be registered in the System for Award Management (SAM) at the time a bid is submitted and at the time of award.
- Bids submitted via external, cloud-based, file storage services such as OneDrive, etc. shall not be accepted.
- If the contractor elects to not have its active SAM registration viewable by the public, then the contractor must submit a copy with the bid.
- Federal contractors and subcontractors who are required to file a form VETS- 4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail.
- (i) The Offeror shall obtain a UEI to register in SAM.
- (ii) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer.
Requirements
| ID | Requirement |
|---|---|
| R1 | This project is RESTRICTED - Bids will be accepted from all eligible Small Business concerns.Section K (representations) |
| R2 | The Bidder is responsible for submitting all required forms and documents with the bid.Section K (representations) |
| R3 | According to FAR 22.1302-1(b) federal contractors and sub-contractors MUST complete the required annual Vets-4212 Form in order to be eligible for a contract award.Section K (representations) |
| R4 | Please note you must include a scanned copy of your official bid bond along with your bid documents if you submit your bid electronically.Section K (representations) |
| R5 | Electronic bids must contain the required signatures (electronic or by hand).Section K (representations) |
| R6 | Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . |
| R7 | A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid.Section K (representations) |
| R8 | BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.Section K (representations) |
| R9 | Power of Attorney: a. Dated on or before execution date of bond b. Power has original signature of surety, or is embossed with surety’s seal in the certification section. BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED. |
| R10 | Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule.Section K (representations) |
| R11 | If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item.Section K (representations) |
| R12 | To be eligible for award, bidders must submit prices for each pay item.Section K (representations) |
| R13 | Bidder’s Qualifications form (provided separately as part of the Bid Documents Package). Form completed, signed and submitted with bidSection K (representations) |
| R14 | The Contractor affirms that it does not operate any diversity, equity, and inclusion (DEI) initiatives that are inconsistent with the Equal Protection principles of the Constitution and the non-discrimination requirements of Federal law, as interpreted by the Supreme Court in Students for Fair Admissions v. Harvard, 600 U.S. 181 (2023). |
| R15 | The Offeror shall provide its TIN or related information to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d); reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M; and implementing regulations issued by the IRS. The Offeror shall consent for TIN validationSection K (representations) |
| R16 | The Offeror shall provide a CAGE code and legal business name (Do not use a “doing business as” name) for— (A) Itself; (B) Its immediate owner(s), if any; (C) Its highest-level owner, if any; and (D) Any predecessor(s), or predecessor of an Offeror’s predecessor, that held a Federal contract or grant within the last three years.Section K (representations) |
| R17 | If any registrants under the Lobbying Disclosure Act of 1995 have made a lobbying contact on behalf of the offeror with respect to this contract, the offeror shall complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to provide the name of the registrants.Section K (representations) |
| R18 | An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.Section K (representations) |
| R19 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliantSection K (representations) |
| R20 | Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.Section K (representations) |
| R21 | Construction activities at the project site cannot begin any earlier than March 22, 2027.Section K (representations) |
| R22 | The performance period to complete the contract work for all schedules will be 152 calendar days after the issuance of the Notice to Proceed |
| R23 | Coastal Zone Management ACT (CZMA) Federal Consistency compliance is necessary for Fort McHenry National Monument in Maryland and Historic Shrine and Thomas Edison National Historical Park in New Jersey. This and any additional permits will be acquired by the contractor.Section I (contract clauses) |
Recent awards in NAICS 237310
The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-15 | GCS LLCFederal Highway Administration · CO NP BLCA 10(1) SOUTH RIM DRIVE IMPROVEMENT GUARDRAIL REPLACEMENT INSTALLATION | $956,200 |
| 2026-11-01 | WAM INDUSTRIES, INCORPORATEDFederal Aviation Administration · ATL ARSR GRAVEL INSTALLATION & BLDG. IMPROVEMENTS | $353,800 |
| 2026-09-22 | FRANK GURNEY INCFederal Aviation Administration · QMI GUARDRAIL REPLACEMENT | $345,000 |
| 2026-09-11 | HERBACK GENERAL ENGINEERING LLCFederal Highway Administration · CA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA | $1.57 million |
| 2026-09-01 | DANHILL CONSTRUCTION COMPANYFederal Highway Administration · PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL | $5.35 million |
| 2026-09-01 | ADAMS CONTRACTING COFederal Highway Administration · TN ERFO FS CHRKE804 2020-2(2): THE PROJECT CONSISTS OF REPAIRING VARIOUS DAMAGED SITES ON MCFARLAND ROAD (FS 23). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMEN | $5.63 million |
Source: USAspending.gov, retrieved 2026-11-07. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.