Modular Buildings & Restroom Rental with Ancillary Services: requirements and submission rules
25 requirements and 15 submission rules found in the solicitation documents for 69056727Q000005. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- (End of provision) FAR 52.212-1 – Instructions to Offerors – Commercial Products and Commercial Services (DEVIATION Aug 2025) ADDENDUM All questions concerning this RFQ shall be submitted electronically to WFL.Purchasing@dot.gov, no later than the due date and time on page B-1 of this RFQ.
- E-9 WFLHD Modular Buildings & Restroom Rental with Ancillary Services (End of provision) 52.204-7 -- System for Award Management (DEVIATION Nov 2025) The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award.
- Solicitation Release Date: 28-OCT-2026 Technical Questions Due Date: Day, 19-MOV-2026, at 4:00pm PT Response Due Date: Day, 24-NOV-2026, at 2:00 pm PT NOTICE: This solicitation and the resulting contract incorporate the latest updates from the Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO).
- To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
- (d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, proposed for debarment, or voluntarily excluded (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions).
- The Offeror shall obtain and provide the following identifying information: (1) Unique entity identifier (UEI).
- (c) Late submissions, modifications, revisions, and withdrawals of offers.
- (2) Any offer, modification, or revision received after the time specified for receipt of offers is “late” and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition.
- To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party.
- Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.
- (1)The Contractor shall not change the legal business name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR part 32).
- Assignees shall be separately registered in SAM.
- The Contractor shall ensure that its UEI is maintained throughout the life of the contract.
- To update a CAGE code, the Contractor shall initiate the change by updating its SAM registration.
- The Contractor shall communicate any change to its UEI or CAGE code to the Contracting Officer within 30 days after the change, so a modification can be issued to update the UEI or CAGE code on this contract.
Requirements
| ID | Requirement |
|---|---|
| R1 | The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer. The Offeror shall also enter its EFT indicator, if applicable.Section E |
| R2 | The Offeror shall provide its TIN or related information to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d); reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M; and implementing regulations issued by the IRS. The Offeror shall consent for TIN validation;Section E |
| R3 | The Offeror shall provide a CAGE code and legal business name (Do not use a “doing business as” name) for— (A)Itself; (B)Its immediate owner(s), if any; (C)Its highest-level owner, if any; and (D)Any predecessor(s), or predecessor of an Offeror’s predecessor, that held a Federal contract or grant within the last three years.Section E |
| R4 | The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.Section E |
| R5 | Offerors are responsible for submitting offers and any modifications or revisions to the Government office designated in the solicitation by the time specified in the solicitation.Section E |
| R6 | All documents are to be submitted in Portable Document Format (pdf), or an approved fixed-layout electronic format, via the GSA eBuy Portal.Section E |
| R7 | File(s) shall not contain any security restrictions (e.g., password protection) that prevent the Government from distributing and printing the document(s) and shall not include marketing materials or letters of support/recommendation.Section E |
| R8 | In responding to this RFQ, the Contractor shall address an understanding of logistics, schedule, and any other miscellaneous issues of which the Government should be aware. The Contractor shall indicate if any technical assumptions have been made, conditions have been stipulated, or exceptions have been taken with the Government Description of Requirement as written.Section E |
| R9 | Completed Standard Form 18. Attention should be paid to ensure that blocks 8, 12, 13, 14, 15, and 16 are properly and correctly filled.Section E |
| R10 | Completed Price Schedule (Section B).Section E |
| R11 | Narrative discussion addressing the quoter’s technical approach and technical merit factors with a description of how the Statement of Work requirements will be completed.Section E |
| R12 | Cut sheets, technical specification sheets, drawings, and any other documentation which are necessary for the government to evaluate and determine that all quoted equipment and/or components meet all minimum requirements.Section E |
| R13 | Relevant experience information (within the last 7 years), limited to a total of 5 pages, to facilitate the Government’s consideration of the vendor’s experience as a company providing the same or similar services of equal scope.Section E |
| R14 | Relevant performance information (within the last 3 years), limited to a total of ten (10) pages, which shall include a short description of the work, the dates of work performance, the name of the client and a contact phone number and email address, so a reference check can be conducted.Section E |
| R15 | Completed Representations and Certifications (see Section E paragraph 1). |
| R16 | “Reps and Certs FAR Report" from the offerors SAM.gov account.Section E |
| R17 | Acknowledgement of all solicitation amendments, if any. |
| R18 | Offeror must comply with ALL instructions, submit ALL items as stated FAR 52.212.1 and its Addendum.Section E |
| R19 | Offeror must furnish information to indicate a minimum of five (5) years of relevant experience during the last seven (7) years that involve the Offeror providing services of a similar size and scope.Section E |
| R20 | The offeror agrees to obtain a similar certification from its subcontractors and submit such certification(s) with its offer.Section E |
| R21 | The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”Section E |
| R22 | The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.Section E |
| R23 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliantSection E |
| R24 | Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.Section E |
| R25 | A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture.Section E |
Recent awards in NAICS 532490
The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-08-10 | HERC RENTALS INCFederal Aviation Administration · MANLIFTS AND LIGHT TOWERS | $27,677 |
| 2026-06-17 | HERC RENTALS INCFederal Aviation Administration · 2 MANLIFTS AND 2 LIGHT TOWERS TO BE USED FOR RADOME REPLACEMENT ACTIVITY AT UTTR TROUT CREEK | $19,161 |
| 2026-06-01 | MAGNIFATENT CORPMaritime Administration · USMMA GRADUATION COMMENCEMENT EXERCISES SETUP -TEAR DOWN | $119,853 |
| 2026-05-28 | SEA STATE WALLS LLCFederal Aviation Administration · ZSE ARTCC SLATWALL TEMPORARY WALL SYSTEM FOR DURATION OF CONSOLE REPLACEMENT PROJECT | $89,000 |
| 2026-04-01 | SUNBELT RENTALS, INCFederal Aviation Administration · TRACON AT FORT WORTH HAS NO REDUNDANCY IF CURRENT CHILLER GOES DOWN, TEMPORARY COOLING NEEDS TO BE PROVIDED TO PROCEED WITH CORRECTIVE ACTIONS. | $69,242 |
| 2025-08-18 | TRANE U.S. INC.Federal Aviation Administration · TEMPORARY CHILLER 8570 W FREELAND RD FREELAND, MI 48623 9750 | $31,590 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.