Modular Buildings & Restroom Rental with Ancillary Services: requirements and submission rules

60 requirements and 8 submission rules found in the solicitation documents for 69056727Q000005. Use them as the start of your compliance matrix.

Solicitation number
69056727Q000005
Agency
TRANSPORTATION, DEPARTMENT OF / FEDERAL HIGHWAY ADMINISTRATION / 690567 WESTERN FEDERAL LANDS DIV
NAICS
532490
Set-aside
No Set aside used
Responses due
08 December 2026 (10 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • (End of provision) FAR 52.212-1 – Instructions to Offerors – Commercial Products and Commercial Services (DEVIATION Aug 2025) ADDENDUM All questions concerning this RFQ shall be submitted electronically to WFL.Purchasing@dot.gov, no later than the due date and time on page B-1 of this RFQ.
  • (A) QUANTITY (C) NSN 7540-01-152-8067 69056727Q000005/0002 Amendment 0002 adds site visit information in Section D and extends the due date for quote submission.
  • Will the Government accept quotations by email to WFL.Purchasing@dot.gov from responsible vendors registered in SAM.gov who do not hold a GSA Schedule (MAS) contract?
  • Additionally, the cover page and page A-1 are updated accordingly to extend the due date for submission of quotes to Tuesday, 08-DEC-2026, at 2:00pm PT.
  • Solicitation Release Date: 28-OCT-2026 Technical Questions Due Date: DayTuesday, 19-NOV01-DEC-2026, at 4:00pm PT Response Due Date: DayTuesday, 24-NOV08-DEC-2026, at 2:00 pm PT NOTICE: This solicitation and the resulting contract incorporate the latest updates from the Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO).
  • To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party.
  • Please confirm the questions due date/time and the correct PPQ subject line This is a typo in both instances and will be corrected in Amendment 0001 2-Nov-2026 6 X Is this requirement limited to GSA Multiple Award Schedule (MAS) holders?
  • Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers.

Requirements

IDRequirement
R1If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
R2All interested vendors shall refer to Section E for full-text FAR Provision 52.212-1, Instructions to Offerors, and its Addendum.Section D
R3The Contractor must coordinate the delivery schedule, truck access, and exact site placements with the Technical Point of Contact (TPOC) at least 10 business days prior to on-site delivery.Section D
R4The Contractor is responsible for preparing the sites, offloading, setup, and placing/setting all units.Section D
R5If interested in attending [Organized Site Visit], please provide Company name, attendee's name(s), and contact information to WFL.Purchasing@dot.gov.
R6Please arrive at least 10 minutes prior to the scheduled start time to accommodate the visitor access process.
R7Additionally, access to a federal facility requires compliance with the 'REAL ID' Act requirements.Section D
R8All interested Contractors shall satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
R9Procure and supply one pre-engineered prefabricated modular office building of approximately 24' x 60' (1,440 SQFT) containing a minimum of three offices, one small secure meeting room, and two conference rooms, fully compliant with local commercial building codes.Section D
R10Procure and supply two 8' x 40' Office Containers or Modular units (fully finished, with active HVAC systems and full office finishes).
R11Procure and supply one modern, climate-controlled executive restroom trailer (3-station minimum).
R12Manage and execute the transport of all modular units on a commercial carrier, F.O.B. Destination, to the Vancouver, Washington compound.Section D
R13Provide complete site preparation services, including minor grading and leveling of all designated site areas to support solid, level footing for the modular units.Section D
R14Perform professional installation, including block & level setup for the 24' wide multi-plex, 8' wide single-wide unit, and restroom trailer.Section D
R15Construct, wire, and certify full utility service connections from the modular buildings' distribution panels to the closest WFLHD building electrical distribution panels.Section D
R16Perform post-installation inspection and leveling adjustments between 30 and 60 days following initial occupancy to ensure long-term stability and code compliance.Section D
R17Provide weekly septic sanitation pumping services, freshwater holding tank refills, winterization assistance, technical troubleshooting, and general routine maintenance of all integrated trailer systems.Section D
R18The contractor shall lease to WFLHD the following pre-engineered modular units for a firm-fixed lease term of twenty-two (22) months. All units shall be delivered fully operational and turnkey ready for immediate use and occupancy no later than 01-MAR-2027.Section D
R19Task 1.1: Double-wide modular office trailer (24' x 60'). Provide 1 pre-engineered double-wide modular office building of approximately 24 feet by 60 feet (1,440 SQFT interior area). The modular office building shall feature an integrated interior floor plan configured containing a minimum of 3 offices, 1 small secure meeting room, and 2 conference rooms and be fully ADA compliant.Section D
R20Task 1.2: Single-wide container/modular office (8' x 40'). Provide 2 pre-engineered, single-wide 8' x 40' containers or modular office units (320 SQFT interior area). The units shall feature full HVAC capability (minimum 1.5-ton capacity), commercial-grade finishes, insulated walls, high-durability VCT or commercial carpet flooring, a minimum of one exterior door with locksets, and high-efficiency LED or fluorescent ceiling fixtures.Section D
R21Task 1.3: Restroom trailer (3-station minimum). Provide 1 fully self-contained, temporary restroom trailer with a minimum three (3) station configuration. The unit delivered must be no older than seven (7) years.Section D
R22Site leveling and preparation: The contractor shall be responsible for any minor leveling and site preparation of the existing gravel/asphalt base at all designated compound sites to guarantee solid, level, and stable footings for the modular units.Section D
R23Block and level set: The contractor shall block, level, and structural-couple the 24' wide multiplex sections, and independently block, level, and secure the 8' wide single-wide container office and the restroom trailer in accordance with local guidelines, manufacturer specifications, and standard tie-down anchoring protocols.Section D
R24Noise mitigation: The contractor shall install sound-dampening interior walls (minimum STC 40+ rating) to divide the 24' x 60' interior space into three offices, one small secure meeting room, and two conference rooms. The 8' x 40' unit shall remain a wide-open configured administrative workspace with no interior partitions.Section D
R25Skirting and site aesthetics: The contractor shall supply and install matching high-durability hardboard or vinyl skirting around the complete exterior perimeter of both office foundations (representing approximately 168 linear feet for the 24' x 60' unit and approximately 96 linear feet for the 8' x 40' unit) to protect the sub-floor area and maintain visual compound standards.Section D
R26OSHA steps and ADA ramps: The contractor shall supply, install, and lease three complete access packages: DOUBLE-WIDE OFFICE (24' X 60'): 1 OSHA-compliant aluminum step system with a 40" x 60" landing and handrails, and 1 ADA/IBC-compliant 30-foot aluminum ramp system with a 60" x 60" switchback landing and continuous handrails. SINGLE-WIDE OFFICE (8' X 40'): As needed, 2 additional OSHA-compliant aluminum step systems with landing or an ADA-compliant ramp system. RESTROOM TRAILER: 1 OSHA-compliant aluminum step system with landing or ADA-compliant ramp system as designated by the TPOC.Section D
R27Utility connections: The contractor shall complete and certify electrical service connections for all units. This includes laying properly sized, weather-insulated commercial-grade wiring and circuit breakers from the 24' x 60' unit's 125-amp panel and the 8' x 40' unit's 100-amp or 125-amp panel to the nearest designated WFLHD compound distribution panel in compliance with NEC and local standards. The contractor shall connect initial municipal water (via standard hose) and electrical lines (standard 120V) for the restroom trailer.Section D
R28Post-installation re-leveling: The contractor shall return to the project site to re-verify leveling and adjust stability jacks for all units no earlier than 30 days and no later than 60 days following initial setup to correct standard structural settling.Section D
R29Throughout the active lease, the contractor shall maintain full commercial warranty coverage and provide technical support for all structural, electrical, and mechanical systems across all leased units... The contractor shall coordinate and perform quarterly preventative maintenance checks on the commercial HVAC units and utility connections for both office facilities.Section D
R30The contractor shall perform scheduled septic pumping, greywater/waste tank management, freshwater replenishment, and standard technical repairs to ensure continuous, reliable, and sanitary trailer operations throughout the entire lease period.Section D
R31SEPTIC PUMPING SERVICE: Execute scheduled waste extraction and septic pumping services at least once per week (minimum 1x weekly) utilizing a certified sanitation pumper truck, maintaining odor-free operation and adequate holding tank capacity.
R32FRESHWATER REFILLS: Coordinate and perform freshwater tank replenishment (minimum 150-gallon capacity on trailer) to ensure reliable supply for handwashing sinks and toilet flushing systems.Section D
R33INITIAL STOCKING OF SUPPLIES: Deliver the restroom trailer fully stocked with starting hygiene supplies, including dissolve-ready toilet paper installed on wall mounts, paper towels in dispenser units, and liquid hand soap in dispenser units.Section D
R34REGULAR TECHNICAL MAINTENANCE & REPAIRS: Deliver prompt technical support, repair labor, and replacement parts for standard plumbing, HVAC climate control, electrical, and structural systems at no additional cost to the Government.Section D
R35WINTERIZATION AND COLD WEATHER SUPPORT: Provide heated water connection recommendations, tank winterization assistance, and heated garden hose accessories to ensure freezing protection during cold winter operational periods.Section D
R36ACCOUNT MANAGEMENT: Assign an Account Manager to oversee scheduled septic pumpers, answer technical questions, and resolve administrative or operational concerns during the rental term.Section D
R37Task 4: Teardown, demobilization, and site restoration. At the conclusion of the lease, the contractor shall perform complete demobilization services within 30 calendar days. The contractor shall dismantle step and ramp systems, strip exterior skirting from all units, decouple the 24' x 60' multi-plex sections, perform final septic pumping and deep sanitization on the restroom trailer, disconnect all temporary utility hookups, and transport all leased assets off the WFLHD compound. The contractor is responsible for all return freight charges and shall restore all compound sites to their original clean, vacant, and level condition.Section D
R38All temporary facilities leased to WFLHD must meet or exceed the following Technical and Materials Quality Criteria: Structural code compliance. The entire structure of all units, including materials, insulation, emergency egress, and load ratings, must comply with International Building Code (IBC) standards for commercial occupancy. Standard residential units meeting only residential codes (IRC) are strictly prohibited.Section D
R39Accessibility ramps and landings: Leased aluminum ramp systems with continuous, non-slip surfaces must be provided at entry doorways in compliance with ADA and IBC accessibility guidelines.Section D
R40Exterior doors & lighting: All exterior entry doors must include commercial cylinder locksets, weatherstripping, and exterior wall-mounted LED security fixtures. 24' X 60' UNIT: Minimum of two exterior doors. Two 8' X 40' UNITS: Minimum of one exterior door. RESTROOM TRAILER: Dedicated exterior entry doors for separate men's and women's suites.Section D
R4124' x 60' Unit: INTEGRATED HVAC SYSTEM with a minimum 2.0-ton cooling capacity and professionally balanced ductwork serving all offices, meeting and conference rooms simultaneously.
R42ACOUSTICS AND PARTITIONS: Interior office partitions must have upgraded sound-dampening qualities (minimum STC rating of 40+) to allow confidential business meetings and focused work. Partition walls must consist of a minimum of painted sheetrock or foam-core panels with metal 'H' track systems, rising securely from floor to ceiling.Section D
R43DATA AND TELECOMMUNICATIONS PRE-WIRING: The 24' x 60' building must include a dedicated utility closet to house a pre-wired, rack-mounted 48-port RJ-45 Category 6 (Cat6) data patch panel. Every office must contain a minimum of two (2) dual Cat6 data drops, and conference rooms must contain a minimum of four (4) dual Cat6 data drops. Electrical pre-wiring must provide 110V commercial outlets supporting a minimum of twelve (12) active devices in the utility closet.Section D
R448' x 40' Units: Integrated commercial HVAC system with a minimum 1.5-ton cooling capacity to serve the open-plan work area.Section D
R45Lighting & electrical controls: High-efficiency LED or fluorescent troffer ceiling fixtures with individual wall switches for all offices, meeting and conference rooms, and open work areas.Section D
R46Interior flooring & trim: Commercial-grade, low-VOC carpet tile or high-durability vinyl composition tile (VCT) with commercial vinyl base molding on all interior walls.Section D
R47Restroom trailer: Layout & station capacity: 3-station configuration minimum. Each suite must include a vanity and private toilet stall, with one of the suites including a waterless urinal with privacy screen.
R48Integrated climate control / HVAC: High-efficiency AC units and integrated heat strips (with a 3–4 season cold-weather arctic package) to sustain interior temperatures between 68°F and 74°F year-round.Section D
R49Water & waste tank capacities: Minimum 150-gallon integrated freshwater holding tank and minimum 560-gallon integrated waste septic holding tank.Section D
R50Utility power & water connections: Powered via standard 120V electrical connections (requiring no more than 3–4 standard 30 AMP power cords). Water supply connects to municipal pressurized water via heavy-duty commercial hose (heated garden hose required during winter months).Section D
R51High-end interior materials & finishes: Executive-level environment featuring fiberglass walls, vinyl trim, poly base cabinets, high-durability VCT or jet-tile rolled flooring, drop-in white porcelain sinks, solid surface countertops, vanity mirrors, and integrated warm lighting.Section D
R52The Contractor shall have five calendar days from receipt of comments to make revisions, address any defects, or replace non-conforming units.
R53The Contractor shall furnish all required documents in support of the closeout of this contract.Section D
R54Each prospective Quoter should attempt to state each question in such a way that the Quoter would have no objection to the Government publishing that precise question (and its answer) in a formal amendment to the RFQ. Additionally, each prospective Quoter should attempt to word each question in such a way that the publication of that question (and its answer) would not divulge any information that the prospective Quoter considers to be proprietary or confidential.Section E
R55All documents are to be submitted in Portable Document Format (pdf), or an approved fixed-layout electronic format, via email to WFL.Purchasing@dot.gov with reference to the RFQ number in the subject line.Section E
R56Completed Representations and Certifications (see Section E paragraph 1).
R57'Reps and Certs FAR Report' from the offerors SAM.gov account.
R58Acknowledgement of all solicitation amendments, if any.
R59Submission of subcontractor relevant experience would be required for evaluation [if an offeror meets experience requirements using proposed subcontractor(s) or major supplier(s)].Section E
R60Past performance information for the prime AND the subcontractor would be required [if relying on proposed subcontractor past performance].Section E

Recent awards in NAICS 532490

The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-10HERC RENTALS INCFederal Aviation Administration · MANLIFTS AND LIGHT TOWERS$27,677
2026-06-17HERC RENTALS INCFederal Aviation Administration · 2 MANLIFTS AND 2 LIGHT TOWERS TO BE USED FOR RADOME REPLACEMENT ACTIVITY AT UTTR TROUT CREEK$19,161
2026-06-01MAGNIFATENT CORPMaritime Administration · USMMA GRADUATION COMMENCEMENT EXERCISES SETUP -TEAR DOWN$119,853
2026-05-28SEA STATE WALLS LLCFederal Aviation Administration · ZSE ARTCC SLATWALL TEMPORARY WALL SYSTEM FOR DURATION OF CONSOLE REPLACEMENT PROJECT$99,000
2026-04-01SUNBELT RENTALS, INCFederal Aviation Administration · TRACON AT FORT WORTH HAS NO REDUNDANCY IF CURRENT CHILLER GOES DOWN, TEMPORARY COOLING NEEDS TO BE PROVIDED TO PROCEED WITH CORRECTIVE ACTIONS.$69,242
2025-08-18TRANE U.S. INC.Federal Aviation Administration · TEMPORARY CHILLER 8570 W FREELAND RD FREELAND, MI 48623 9750$31,590

Source: USAspending.gov, retrieved 2026-11-07. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.