AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements: requirements and submission rules
37 requirements and 15 submission rules found in the solicitation documents for 69056726B000012. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Sept 2025) (a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB.
- Include at a minimum columns for submittal number; section or item number; submittal description; date submitted; due by date; approval date; and comments.
- A mandatory 10 percent withholding of the entire progress payment will be applied if the latest schedule submittal has not been received by the due date or the previous schedule submittal has not been approved.
- (b)(1) Bidders shall acknowledge receipt of any amendment to this solicitation- (i) By signing and returning the amendment; (ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid; (iii) By letter; (iv) By email, if email bids are authorized in the solicitation.
- To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party.
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- The Offeror shall obtain and provide the following identifying information: (1) Unique entity identifier (UEI).
- To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
- The Contractor shall submit the information required in paragraph (c) of this clause in the System for Award Management (SAM) at https://www.sam.gov (see SAM User Guide).
- (d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, proposed for debarment, or voluntarily excluded (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions).
- 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (APR 2026) (a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management via https://www.sam.gov.
- The Government shall make payment to the Contractor using the EFT information contained in the System for Award Management (SAM).
- In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to SAM.
- If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address contained in SAM.
- (c) The Contractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 120-day period.
Requirements
| ID | Requirement |
|---|---|
| R1 | Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. |
| R2 | Does the lower left corner of the proposal envelope state “Bid Enclosed”? |
| R3 | Does the lower left corner include the Solicitation Number and the project number/name? |
| R4 | Complete the Base schedule and all Options according to Subsection 102.02. |
| R5 | Submit or update Representations and Certifications online at https://sam.gov/ before bid submittal. |
| R6 | Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B -1. Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected. |
| R7 | Facsimile and email bids are not authorized for this solicitation. Bids may be modified or withdrawn by email, if such notice is received by the time specified for receipt of bids. |
| R8 | Submit a bid guarantee of 20 percent of the total bid amount for all schedules or $3 million, whichever is less. |
| R9 | Bids received without a valid bid bond will be rejected. |
| R10 | When the offeror/principal is a corporation, include this certification with your offer/bid. |
| R11 | When the offeror/principal is a limited liability company, include this certification with your offer/bid. |
| R12 | When the offeror/principal is a joint venture, include this certification with your offer/bid. |
| R13 | An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid. |
| R14 | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| R15 | This invitation for bids requires a low bidder who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. Do not submit this form with your bid. |
| R16 | Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). |
| R17 | When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. |
| R18 | Total all of the amounts bid for each pay item and show the total bid amount. |
| R19 | Do not submit an offer unless— (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has (i) Waived application under 22 U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b). |
| R20 | If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer. |
| R21 | If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies. |
| R22 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant |
| R23 | The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award. |
| R24 | The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer. The Offeror shall also enter its EFT indicator, if applicable. |
| R25 | The Offeror shall provide its TIN or related information to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d); reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M; and implementing regulations issued by the IRS. The Offeror shall consent for TIN validation |
| R26 | The Offeror shall provide a CAGE code and legal business name (Do not use a “doing business as” name) |
| R27 | Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. |
| R28 | Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder. |
| R29 | Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a) (1) and (2) of this provision when delivered to the office specified in the solicitation. |
| R30 | Bids must be— (1) Submitted on the forms furnished by the Government or on copies of those forms, and (2) Manually signed. The person signing a bid must initial each erasure or change appearing on any bid form. |
| R31 | If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words “no bid” in the space provided for any item on which no price is submitted. |
| R32 | Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected. |
| R33 | Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S. dollars shall be rejected. |
| R34 | The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. |
| R35 | The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. |
| R36 | Acceptable bids must include pricing for Base and Option Z schedules. |
| R37 | To promote partnership, trust, and transparent communication, audio/video recording and the deployment of third -party AI note-taking bots shall not be utilized during meetings between the Government representatives and contractor staff during this construction project. |
Recent awards in NAICS 237310
The newest federal contract awards in the same industry code from Department of Transportation, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-15 | GCS LLCFederal Highway Administration · CO NP BLCA 10(1) SOUTH RIM DRIVE IMPROVEMENT GUARDRAIL REPLACEMENT INSTALLATION | $956,200 |
| 2026-11-01 | WAM INDUSTRIES, INCORPORATEDFederal Aviation Administration · ATL ARSR GRAVEL INSTALLATION & BLDG. IMPROVEMENTS | $353,800 |
| 2026-09-22 | FRANK GURNEY INCFederal Aviation Administration · QMI GUARDRAIL REPLACEMENT | $345,000 |
| 2026-09-11 | HERBACK GENERAL ENGINEERING LLCFederal Highway Administration · CA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA | $1.57 million |
| 2026-09-01 | DANHILL CONSTRUCTION COMPANYFederal Highway Administration · PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL | $5.35 million |
| 2026-09-01 | ADAMS CONTRACTING COFederal Highway Administration · TN ERFO FS CHRKE804 2020-2(2): THE PROJECT CONSISTS OF REPAIRING VARIOUS DAMAGED SITES ON MCFARLAND ROAD (FS 23). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMEN | $5.63 million |
Source: USAspending.gov, retrieved 2026-10-31. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.