TenderAxiom

TenderAxiom · Opportunities

U.S. Department of Agriculture Seeks to Lease Office and Related Space in Springfield, GA: requirements and submission rules

74 requirements and 15 submission rules found in the solicitation documents for 57-13103-26-NR. Use them as the start of your compliance matrix.

Solicitation number
57-13103-26-NR
Agency
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER / FPAC BUS CNTR-MGMT SVS DIV
NAICS
531120
Set-aside
No Set aside used
Responses due
28 November 2026 (0 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • In cases where an a gent is representing multiple entities, written acknowledgement/ permission from each entity to represent multiple interest parties for the same submission must be submitted prior to the Expressions of Interest due date.
  • No later than the due date for final proposal revisions, the Offeror must submit to the LCO: 1.
  • In order to be considered for award, offers conforming to the requirements of the RLP must be received in one of the following ways: No later than 4:30 EST on the date specified below at the following email addresses: Date: 07/17/2026 Email Address: Bradley.cantrell@usda.gov 3.
  • Offeror's signed lease proposal must be saved in a generally accessible format (such as portable document format (pdf)), which displays a visible image of all original document signatures and must be transmitted as an attachment to the email.
  • To submit an offer in response to a Request for Lease Proposals (RLP), the offeror must be registered and active in the System for Award Management (SAM) at SAM.gov.
  • 57-13103-26-NR Springfield, GA Offers due by 11/28/2026 In order to be considered for award, offers conforming to the requirements of the RLP must be received no later than 4:30 PM EST on the date above.
  • The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions.
  • Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions.
  • The term “most recent year ” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions.
  • All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy; 3.
  • Offerors falling under a statutory exception must also indicate by the due date for final proposal revisions what cost effect ive energy efficiency and conservation improvements they are proposing to make.
  • The Offeror must submit plans and any other information to demonstrate that the Rentable Space yields ABOA space within the required ABOA range.
  • Initial Offer Due Date: 11/28/2026 Lease Award Date (Estimated): March 1, 2027
  • Offeror submitting a lease proposal by email must retain in its possession, and make available upon USDA's request, its original signed proposal.
  • Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below.

Requirements

IDRequirement
R1Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror must submit its offered rent and other price data, together with required information and submissions.
R2The Lease paragraph titled “Definitions and General Terms” must apply to the terms of this RLP.
R3Do not attempt to complete the lease template. Upon selection for award, USDA will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution.
R4The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).
R5Offeror may not use Federal agency name(s) and/or acronym(s), e.g., United States Department of Agriculture, USDA, in the entity name that owns and/or leases the Space to USDA.
R6The Government is seeking a minimum of 1,100 to a maximum of 1,155 of American National Standards Institute/Building Owners and Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. See Section 2 of the Lease for applicable ANSI/BOMA standards. The Government will not award a Lease that exceeds 1,486 rentable square feet (RSF).
R7The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
R8The Government requires 00 structured/inside parking spaces and 9 surface/outside parking spaces, reserved for the exclusive use of the Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror must include the cost of this parking as part of the rental consideration.
R9If antenna space is required, specifications regarding the type of antenna(s) and mounting requirements are included in the agency requirements information provided with this RLP.
R10Offeror must provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror must advise the Government if such rights exist.
R11The lease term must be 20 Years, 5 Years Firm, with Government termination rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 120 days’ prior written notice.
R12The Government requests Space in an area bounded as follows: North: City Limits South: City Limits East: City Limits West: City Limits Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.
R13Inside City Center: Space must be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks must be well maintained. Parking facilities with an adequate availability of parking spaces open to the general public to accommodate employees and visitors must be located within the immediate vicinity of the Building but generally not exceeding a walkable 2,640 feet of the employee entrance of the offered Building as determined by the LCO. These parking facilities do not substitute for the required parking under Paragraph 1.02(C).
R14Outside City Center: Space must be located 1) in an office, research, technology, or business park that is modern in design with a campus -like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking- to-square-foot ratio available on- site must at least meet current local code requirements, or, in the absence of a local code requirement, on-site parking must be available at a ratio of one (1) space for every 150 RSF of Space.
R15Offeror must examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
R16The Tenant Improvements to be delivered by the Lessor must be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor must design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.
R17Offerors are required to prepare Design Intent Drawings (DIDs) prior to Lease Award. See Paragraph TURNKEY PRICING WITH DESIGN INTENT DRAWINGS PRIOR TO AWARD for further details.
R18If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
R19The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space.
R20There must be no charge to the Government for any items that already exist in the offered Building or facility.
R21If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.
R22In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.
R23To demonstrate potential for efficient layout, USDA may request the Offeror to provide a test fit layout at the Offeror’s expense.
R24A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises . If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror must clearly demarcate the offered Property on its site plan/map submissions and must propose an adjustment to property taxes on an appropriate pro rata basis.
R25In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
R26The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards will not be considered. If none of the offers is in compliance with the Seismic Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other evaluation factors specified in this RLP.
R27An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions: 1. The offer includes a representation that the Building will have less than 10,000 ABOA SF of Space leased to the Federal Government upon commencement of the lease term (Seismic Form D), 2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A). 3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards ( Seismic Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation. 4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government. 5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit, and a schedule for the seismic retrofit. The Offeror must provide a construction schedule, concept design for the seismic upgrade, and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required. 6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).
R28The Government requires space with no asbestos -containing materials (ACM), or with undamaged, nonfriable ACM.
R29If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101) , EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763) , state, and local regulations and guidance prior to occupancy.
R30If space is offered which contains ACM, the Offeror must submit a current asbestos management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re- inspection report must conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763).
R31In order to be eligible for award, Offeror must either: A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.
R32In order to be eligible for award, Offeror must either: A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
R33If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
R34As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application.
R35All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
R36Upon request by the Government, Offeror must provide all known previous use of the Building.
R37Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or Property.
R38At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527- 21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.
R39If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903- 11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations.
R40An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance.
R41All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
R42An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance.
R43If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the GSA’s Qualification Requirements for Preservation Architects and Other Specialists .
R44For Tenant Improvements and other tenant-driven alterations within an existing historic building, the preservation architect must develop context-sensitive design options consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
R45All design costs and expenses relating to satisfying the requirements of this paragraph will be borne solely by the Offeror.
R46Offeror shall also submit with its offer the following: Proposal to Lease Space (GSA Form 1364); Lessor’s Annual Cost Statement (GSA Form 1217); Authorization to Represent Ownership (required if Offeror is not the owner); Conditional Commitment of Funds; Local Zoning Compliance; Ownership Evidence; Agreement to Acquire an Interest in Property (required if Offeror does not have vested interest in Property); Signing Authority Proof; Conflict of Interest, if required; SAM Registration; Fire Protection and Life Safety; Legal Property Description and Tax ID; Parking Plan and Narrative, if required; Architectural Plans for Building Modernization, if required; Asbestos Submittals, i.e., management plan, reinspection report, if required; Scaled Floorplan of Offered Space(s); Test Fit Layout (if requested by GSA); Tenant Improvement Cost Summary (TICS Table); Pre-Award DIDs and Finish Options (Turnkey Pricing Only); Disclosure of any Known Hazardous Conditions or Environmental Releases with/from Offered Space, Building or Property, if required; Vending Facilities Statement; Amenities Evidence; Energy Star or Other Efficiency Improvements Supporting Documentation; Evidence of Seismic Compliance; Environmental Due Diligence and NEPA Documentation, if required; NHPA Documentation, if required; Hydrology Statement, if required; Representation Regarding Certain Telecommunications and Related Services or Equipment; Foreign Ownership/Financing Representation for High-Security Leased Space; Construction Schedule; Small Business Subcontracting Plan, if required for Other Than Small Business above the threshold; Hourly Overtime HVAC Rates, if applicable.
R47If the offeror is not the owner of the Property, authorization from the ownership entity to submit an offer on the ownership entity’s behalf.
R48Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell and TI improvements. Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state: amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer.
R49Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority. If the current zoning is not in compliance, the Offeror must submit a plan and time schedule outlining how they will obtain all necessary zoning approvals prior to construction and how long the necessary zoning approvals will take.
R50Evidence of ownership or control of Building or site. If the Offeror owns the Property being offered or has a long- term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.
R51If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to closing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required.
R52As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease: 1. Corporation. Copy of Articles of Incorporation and bylaws. In addition, a copy of the resolution, signed by the necessary directors of the corporation authorizing the corporate officer who will sign the lease to bind the corporation to the Lease. 2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership and evidence of authority of signatory to bind the partnership if not expressly authorized by the Partnership Agreement. 3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement. Also, evidence of the authority of the signing manager (if company is manager owned) or member (if the company is member managed) to sign, if not expressly authorized by the Articles of Organization and/or Operating Agreement. 4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease.
R53If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package.
R54The Offeror must submit the FPLS Information in subparagraph 1, unless the Building meets either exemption in subparagraphs 2 or 3 below: a. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable). b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building). c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building). d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, provide either: I. A report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances or, II. For offers of new construction only, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.
R55The legal description of the Property and tax ID number associated with the Property, copies of prior year tax notices and prior year tax bills, as well as any other information (such as a fact sheet, 5” wide x 3” high or larger color photograph, site plan, location map, and tax parcel map) in case of multiple tax parcels for an offered Building, or multiple buildings on a tax parcel, and any other information that may affect the assessed value, in order for the Government to perform a complete and adequate analysis of the offered Property. The Offeror is to provide a detailed overview and documentation of any Tax Abatements on the Property as outlined in the “Real Estate Tax Adjustment” paragraph of the Lease.
R56A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements.
R57The architectural plans for modernization, if the offered Building is not a modern office Building.
R58Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs 1 through 5 noted below: 1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided. 2. All plans submitted for consideration shall have been generated by a Computer Aided Design (CAD) program which is compatible with the latest release of AutoCAD. The required file extension is .DWG. Plans shall include a proposed corridor pattern for typical floors and/or partial floors. The CAD file showing the offered Space should show the Poly-Line utilized to determine the square footage on a separate and unique layer. All submissions shall be accompanied with a written matrix indicating the layering standard to verify that all information is recoverable. All architectural features of the Space shall be accurately shown. 3. All architectural features of the Space shall be accurately shown. If conversion or renovation of the Building is planned, alterations to meet this RLP shall be indicated. 4. Plans shall reflect corridors in place or the proposed corridor pattern for both a typical full (single tenant) floor and/or partial (multi-tenant) floor. The corridors in place or proposed corridors shall meet local code requirements for issuance of occupancy permits.
R59A statement as to whether there are existing vending facilities in the offered Building which have exclusive rights in the Building.
R60Provide evidence demonstrating amenities do or will exist by the Government’s required occupancy date. Such evidence shall include copies of signed leases, construction contracts, or other documentation as deemed acceptable by the LCO.
R61If more than 5,000 square feet of land area is to be disturbed in order to meet the Government’s requirements, (as more fully described in the lease paragraph named ENERGY INDEPENDENCE AND SECURITY ACT, sub-paragraph, a statement from Offeror that the Offeror is aware of and will comply with the specific Lease requirements concerning maintenance and restoration of the real property’s hydrology.
R62FAR 52.240-90, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment, as applicable.
R63GSAR 552.270- 33, Foreign Ownership and Financing Representation for High-Security Leased Space.
R64A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.
R65Offeror must provide the following information: A. GSA Form 1217, Lessor’s Annual Cost Statement. Complete all sections of the 1217. B. GSA Form 1364, Proposal to Lease Space. Complete all sections of the 1364...
R66If the Offeror requests any deviations, all deviations must be documented on Form 1364 in block labeled “Additional Remarks or Conditions with Respect to this Offer.” Any deviations must be requested prior to the request for final proposal revisions.
R67Only offers that are compliant with operating lease limitations will be eligible for award. Offerors are obligated to provide supporting documentation at the request of the LCO to facilitate the Government’s determination in this regard.
R68The TIs for this requirement must consist of the following: Repainting of the leased Premises in accordance with the “Painting — TI” paragraph in Section 5 of the Lease. Re-carpeting of the leased Premises in accordance with the “Floor Coverings and Perimeters” paragraph in Section 5 of the Lease. Other—See Exhibit C, ASR’s. All buildings should be in “like new” condition both internally and externally. All TIs required by the Government for occupancy must be performed by the successful Offeror as part of the rental consideration, and all improvements must meet the quality standards and requirements of this RLP package and its attachments.
R69The Tenant Improvements must include all the Offeror’s administrative costs, general contractor fees, subcontractor’s profit and overhead costs, Offeror's Project Management fee, design costs, and other associated project fees necessary to prepare construction documents and to complete the TIs. It is the successful Offeror’s responsibility to prepare all documentation (working/construction drawings, etc.) required to receive construction permits. NO COSTS ASSOCIATED WITH THE BUILDING SHELL MUST BE INCLUDED IN THE TI PRICING.
R70Following the receipt of initial offers, Offerors must coordinate a DID workshop with their respective design and construction team and the tenant agency to develop, review, and complete final DIDs before final pricing is established and prior to award of the Lease. The Government will advise Offerors when the workshop should commence. The Offeror must base the TI portion of its overall pricing on the final approved DIDs and the specifications in this RLP and attachments. This TI price will become a fixed price which the Offeror will include in the final lease proposal as an amortized rent over the Firm Term. Offerors should not price TIs until DIDs are approved in writing by the LCO.
R71A full DID set must include the following elements: Level 1. 1. Cover Sheet; 2. Demolition Plan (if applicable); 3. Construction (Partition) Plan; 4. Power/Communication (Electrical) Plan; 5. Furniture Plan; and 6. Finish Plan.
R72At the DID workshop, the Lessor must provide a minimum of three (3) finish options to include coordinated samples of finishes for all interior elements such as paint, wall coverings, base coving, carpet, window treatments, laminates, and flooring. All samples provided must comply with specifications set forth elsewhere in the Lease. The finish options must be approved by the Government at the DID workshop. The Lessor may not make any substitutions after the finish option is selected.
R73The offer must clearly state whether the rental is firm throughout the term of the Lease or if it is subject to annual adjustment of operating costs as indicated above. If operating costs will be subject to adjustment, those costs must be specified in the proposal.
R74The Offeror must not enter into negotiations concerning the Space leased or to be leased with representatives of Federal agencies other than the LCO or their designee.

Recent awards in NAICS 531120

The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-30PARLIAMENT LLCRural Housing Service · RENTAL PAID FOR NRCS OFFICE SPACE IN TUNKHANNOCK, PA. CURRENT DATE OF AWARD FOR A BASE YEAR OF 12 MONTHS WITH FOUR POSSIBLE OPTION YEAR PERIOD OF 12 MONTHS EACH (NOT TO EXCEED 5 YEARS). THIS AD700 IS $63,000
2026-09-22CAPITOL SOURCE GROUP LLCUnder Secretary for Farm and Foreign Agricultural Services · SHORT TERM OFFICE RENTAL IN PROVO (WASATCH COUNTY), UT FOR NRCS, FSA AND RD.$104,107
2026-09-17TOP GUN LIGHTING AND INDUSTRIAL SUPPLIES, LLCForest Service · E85, HAGEN, ORUMF000324, OFFT, TRAILER, MOBILE OFFICE;$42,508
2026-09-12INTENTS EMERGENCY RESPONSE LLCForest Service · E348, *0587 SHINGLE, OR953S000587, OFFT, TRAILER, MOBILE OFFICE; E349, *0587 SHINGLE, OR953S000587, OFFT, TRAILER, MOBILE OFFICE;$43,950
2026-09-09TNB BANCSHARES, INC.Under Secretary for Farm and Foreign Agricultural Services · SHORT TERM RENTAL OFFICE SPACE HIDALGO CO, EDINBURG, TX FOR NRCS, FSA AND RD.$216,000
2026-09-04AAA RESPONSE, LLCForest Service · E1002, PLASKETT, CALPF002475, OFFT, TRAILER, MOBILE OFFICE;$80,280

Source: USAspending.gov, retrieved 2026-10-28. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.