DHS HSI Schwartz 2nd Floor Carpet Replacement: requirements and submission rules
11 requirements and 2 submission rules found in the solicitation documents for 47PD5527Q0010. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Offers must be submitted by this date and time.
- SUBMISSION OF QUESTIONS/ Pre-Bid RIFs: ● Any and all questions must be submitted by November 9, 2026 at 4:00 p.m.
Requirements
| ID | Requirement |
|---|---|
| R1 | The person who will be using the GACA account (the government agency customer or the business partner) must create a Gmail account at http://mail.google.com/mail/signup and follow the process below: enter their first name and last name, enter their username: must start with “GSA.” then first name, last name - example: GSA.johnsmith@gmail.com (mandatory), complete all required fields, accept the Terms of Service and submit the request, and set up 2-Step Verification (also known as two-factor authentication) using a smart phone that can receive simple messages (mandatory). |
| R2 | GACA accounts must NOT be used by GSA employees and contractors in lieu of a gsa.gov account. |
| R3 | Contractor to provide all labor, materials and support necessary to replace approximately 6000 square feet of carpet and adjacent base boards in the HSI space on the 2nd floor of the Schwartz Federal Building, located at 880 Front Street, San Diego, CA 92101, in accordance with the statement of work. |
| R4 | All furniture located in the space shall be relocated and moved back after carpet has been installed by the Contractor. |
| R5 | The Contractor shall also be responsible for relocating any electrical and/or mechanical building system components necessary to perform this work. |
| R6 | SITE WALK IS MANDATORY FOR THIS SOLICITATION: Scheduled for November 4, 2026 at 9:00 a.m. (PT). The site walk is mandatory in order to submit a proposal for this project. |
| R7 | Contractors must RSVP/register by November 3, 2026 at 10:00 a.m. (PT) at https://forms.gle/RNhxtoc4HPn78VS59 |
| R8 | Site walk is limited to four (4) personnel per firm. |
| R9 | At least one individual must be a representative of the prime contractor. Any other attendees may be a representative of the prime firm or of potential subcontractors. |
| R10 | Quotes are due by December 4, 2026 at 4:00 p.m. (PT) at: https://forms.gle/8qgeXFf69CsXjM869 |
| R11 | See Solicitation section II.A. for Quote Contents. |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from General Services Administration, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-30 | HOF CONSTRUCTION INCPublic Buildings Service · DEPARTMENT OF DEFENSE, OFFICE OF INSPECTOR GENERAL ATTORNEY'S SPACE BUILD OUT EAGLETON COURTHOUSE, SAINT LOUIS, MO | $80,000 |
| 2026-10-30 | HEARD CONSTRUCTION, INC.Public Buildings Service · CHILLER PLANT REPLACEMENT TN0006ZZ JOEL SOLOMON FEDERAL COURTHOUSE 900 GEORGIA AVENUE CHATTANOOGA TN 37402 | $590,926 |
| 2026-10-26 | MATOS-GRUNLEY JOINT VENTUREPublic Buildings Service · NUCLEAR REGULATORY COMMISSION 2ND & 3RD FLOOR RENOVATIONS ONE WHITE FLINT NORTH, 11555 ROCKVILLE PIKE, ROCKVILLE, MD 20852 | $21.29 million |
| 2026-10-23 | NATIONAL CONTRACTING SERVICES, LLCPublic Buildings Service · INSTALLATION OF BALLISTIC WINDOWS AT KY1673ZZ COMMUNITY TRUST BUILDING 100 VINE STREET SUITE 200, LEXINGTON, KY 40507 | $122,309 |
| 2026-10-22 | MC DODD CONSTRUCTION LLCPublic Buildings Service · 4TH FLOOR PROBATION OFFICE RESTROOM UPGRADES-ROANOKE UNITED STATES PROBATION OFFICE ROANOKE VIRGINIA PRIVATE RESTROOM UPGRADES | $25,958 |
| 2026-10-21 | ABSHER CONSTRUCTION COPublic Buildings Service · THIS AWARD IS A STIPEND IN SUPPORT OF THE PORTHILL LPOE DB CAPITAL CONSTRUCTION PROJECT. | $159,000 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.