White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years (offers are now due on 11/13/2026): requirements and submission rules
20 requirements and 8 submission rules found in the solicitation documents for 36C26026Q0977. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submit up to three (3) recent and relevant references (recent is defined in this RFQ as within the last 5 years) for which your COMPANY has provided similar services of the same scope and magnitude as this acquisition.
- Solicitation 36C26026Q0977 due date has been extended to 11/13/2026.
- (c) Late submissions, modifications, revisions, and withdrawals of offers.
- (2) Any offer, modification, or revision received after the time specified for receipt of offers is “late” and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition.
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.
- Questions: Questions to this RFQ shall be submitted via electronic mail to the Contracting Officer, Jeremiah Middleton (Jeremiah.Middleton2@va.gov).
- The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal.
Requirements
| ID | Requirement |
|---|---|
| R1 | DO NOT SUBMIT ANY BIDS/PROPOSALS UNTIL THE PWS/SOLICITATION PROVISION AND CLAUSES HAVE BEEN CORRECTED. |
| R2 | OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| R3 | This is a total SDVOSB Set-aside, contractors must submit SDVOSB certification with their quote to be considered for award. |
| R4 | See Section E.7 VAAR 852.219-75 VA notice of limitations on subcontracting. All offerors are required to fill out the certification portion and return with their offer in order to be responsive to this solicitation. |
| R5 | The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.C.8 |
| R6 | The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.Section E |
| R7 | Offerors are responsible for submitting offers and any modifications or revisions to the Government office designated in the solicitation by the time specified in the solicitation.Section E |
| R8 | All Quotes shall be legible and prepared in the following general format to be properly evaluated. Quotes shall be complete, self-sufficient, and respond directly to the requirements of this solicitation. |
| R9 | ** ALL VENDORS ARE REQUIRED TO SUBMIT PARTS 1 THROUGH 4 BELOW TO BE CONSIDERED RESPONSIVE ON THIS SOLICITATION. ** Part I: Executed Quote (Signed SF1449) Part II: Price Proposal Part III: Technical Part IV: Past PerformanceE.2 |
| R10 | Part I - Executed Quote: a. Complete SF1449 which includes filling out 17a, 30a-c. b. Complete section B.1 information and Amendment Acknowledgement. c. Complete VAAR clause 852.219-75. d. Complete SDVOSB certification.Section I (contract clauses) |
| R11 | Part II – Price Proposal: a. The price/cost schedule shall be submitted fully and completed error free. Provide unit price and total amount for each contract period and the proposed total contract amount for the base and all option years.Section I (contract clauses) |
| R12 | Represent all final monetary extensions in two decimal positions only. Example: $0.27, not $0.27458.Section I (contract clauses) |
| R13 | Unit price and total amount cannot be left blank; indicate your intent not to charge a specific unit price/total amount by writing the unit price as $0.00 and the total/amount price as $0.00.Section I (contract clauses) |
| R14 | Part III –Technical: a. The offeror shall provide a synopsis demonstrating an understanding of the requirements detailed in the statement of work.Section I (contract clauses) |
| R15 | b. The vendor shall provide documents/proof that its employees have all required professional certifications and licenses (current and valid).Section I (contract clauses) |
| R16 | Personnel Qualifications – provide a short resume detailing experience specific to boiler inspections.Section I (contract clauses) |
| R17 | Provide 3 or more references for contracts that have current (within the last five years) reports in Contract Performance Assessment Reporting System (CPARS). If you do not have any current CPARS, please provide at least three professional references to include e-mail and phone number.Section I (contract clauses) |
| R18 | The offeror represents as part of its offer that— (i) It [ ] is, [ ] is not a small business concern; or (ii) It [ ] is, [ ] is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [The offeror shall enter the name and unique entity identifier of each party to the joint venture: _________________.]Section I (contract clauses) |
| R19 | In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128.E.6 |
| R20 | The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer.E.8 |
Recent awards in NAICS 561210
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-12-25 | VETERAN ELEVATED SOLUTIONS, LLCDepartment of Veterans Affairs · ELEVATOR MAINTENANCE AND REPAIR SERVICES | $120,320 |
| 2026-12-01 | HGS ENGINEERING INCDepartment of Veterans Affairs · LEGIONELLA AND DENTAL WATER LINE TESTING | $16,268 |
| 2026-11-30 | B2 CONSTRUCTORS, LLCDepartment of Veterans Affairs · BOILER INSPECTION, TESTING, AND MAINTENANCE SERVICES | $384,678 |
| 2026-11-02 | VETERAN ELEVATED SOLUTIONS, LLCDepartment of Veterans Affairs · ELEVATOR MAINTENANCE CONTRACT | $31,440 |
| 2026-11-01 | CENTRIC ELEVATOR CORPORATION OF OREGON, INC.Department of Veterans Affairs · ELEVATOR MAINTENANCE BRIDGE CONTRACT | $135,000 |
| 2026-11-01 | UNIQUE CLEANING SERVICE, INC.Department of Veterans Affairs · BLANKET PURCHASE AGREEMENT FOR VISN 5 JANITORIAL SERVICES | $4.55 million |
Source: USAspending.gov, retrieved 2026-11-02. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.