Z2DA--666-27-102 Lightning Protection Update B71N: requirements and submission rules
41 requirements and 15 submission rules found in the solicitation documents for 36C25926Q0880_1. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- (g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
- (c) Late submissions, modifications, revisions, and withdrawals of offers.
- (2) Any offer, modification, or revision received after the time specified for receipt of offers is “late” and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition.
- Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
- (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
- (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
- (2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows:
- (i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at https://dibnet.dod.mil.
- (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.
- (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.
- (d) (1) A claim by the Contractor must be made in writing and, unless otherwise stated in this contract, submitted within 6 years after accrual of the claim to the Contracting Officer for a written decision.
- (ii) When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with shipping charges prepaid.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
Requirements
| ID | Requirement |
|---|---|
| R1 | The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.A.5 |
| R2 | Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.A.5 |
| R3 | Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0. If an offeror’s EMR is above 1.0, the offeror must submit a written explanation of the EMR from its insurance carrier on the insurance carrier’s letterhead, describing the reasons for the EMR and the anticipated date the EMR may be reduced to 1.0 or below.A.5 |
| R4 | Offerors must provide documentation demonstrating compliance with clause 852.219-75A.5 |
| R5 | The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.A.5 |
| R6 | Offerors shall provide past performance information on minimum two (2) federal, state, local government or private contract of similar type, scope, size, and complexity. For purposes of this evaluation, a relevant past performance is defined as present/past performance effort involved in electrical and general construction work in a hospital environment and with similar scope and magnitude of effort and complexities of this solicitation requirements Project shall have a minimum amount of $25,000.00 or more and completed within the past five years from the date of issuance of this RFQ. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the quote.A.5 |
| R7 | IF THE OFFEROR CANNOT PROVIDE A CPARS FOR PROJECTS LISTED IN FACTOR 1, then the offeror shall submit Past Performance Questionnaires (PPQ). Completed PPQs should be submitted directly from your client via email to Elia Laritza Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. If the offeror is unable to contact a client for a project(s) before closing date, the offeror should complete and submit with the quote the first page of the PPQ, which will provide contract and client information for the respective project(s).A.5 |
| R8 | Offerors shall provide pricing as requested in the Schedule of Service identified within the SF 1442A.5 |
| R9 | In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128. Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered.A.5 |
| R10 | The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.A.5 |
| R11 | If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.A.5 |
| R12 | If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.A.5 |
| R13 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliantA.5 |
| R14 | Do not submit an offer unless— (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has— (i) Waived application under U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).A.5 |
| R15 | The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.A.5 |
| R16 | Install Transient Voltage Surge Suppression (TVSS) devices at the building’s main service panel.A.5 |
| R17 | Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground.A.5 |
| R18 | Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface.A.5 |
| R19 | Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork.A.5 |
| R20 | Install an air terminal at each corner of the new HVAC equipment.A.5 |
| R21 | Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors.A.5 |
| R22 | After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system.A.5 |
| R23 | Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP).A.5 |
| R24 | Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards.A.5 |
| R25 | Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project.A.5 |
| R26 | The building tenants not in the construction areas will remain at work in the buildings during this construction. Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants.A.5 |
| R27 | All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor. All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor.A.5 |
| R28 | No wiring or cabling shall be abandoned in place.A.5 |
| R29 | All piping, cabling, and wiring shall be labeled. All cabling and patch cabling shall match the VAMC’s station-standard colors.A.5 |
| R30 | The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.).A.5 |
| R31 | Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards.A.5 |
| R32 | Contractor shall utilize the VAMC’s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal—fire caulk product is SpecSeal SSS Intumescent Firestop Sealant; and, if needed, the SpecSeal Composite Sheet may be used in areas approved by the COR.A.5 |
| R33 | The new components installed shall be tested and commissioned, re-certified, and/or tested before VA acceptance. All testing parameters shall be provided by the Contractor with source references to the COR and 3rd-party reviewer before testing begins. Copies of all test reports must be provided to the COR.A.5 |
| R34 | At the conclusion of the project, the Contractor shall provide the VA and AE with a red-lined set of construction drawings, showing any as-built variations from the plans, as called for in the specifications.A.5 |
| R35 | The Contractor must repair any damage caused by the Contractor or their subcontractors during this project. Repairs shall be done timely and will be coordinated with the COR. Repairs shall be of equal or better quality and finish than the existing that was damaged.A.5 |
| R36 | Contractor’s work hours shall be between 7:30am-4:00pm Monday-Friday, unless otherwise coordinated with, and approved in advance by, the COR. Noisy work shall not begin prior to 7:30am.A.5 |
| R37 | Contractors shall not work on weekends, or federal holidays as specified by U.S. Office of Personnel Management (OPM), unless approved in advance by the COR or CO. For approved weekend or holiday work, Contractor must adjust their workers’ pay accordingly at no additional cost to the VA.A.5 |
| R38 | The Contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other Contractors and subcontractors working on-site shall have at least OSHA-10 certifications.A.5 |
| R39 | The Contractor will, with the participation of the COR, complete an Infection Control Risk Assessment (ICRA), using the VA forms and process, and Contractor shall implement all protection measures called for in the risk assessment.A.5 |
| R40 | All Contractors and subcontractors must obtain a temporary contractor badge from the Engineering Office (Building 5, Room 208) when they first arrive on-site. A valid (i.e., not expired), Government-issued photo ID (such as a Driver’s License) is required to be issued a badge.A.5 |
| R41 | Contractor shall field verify all quantities, sizes, and dimensions and receive approved submittals before ordering products and supplies for this project.A.5 |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-12-08 | LC FLUHARTY CONSTRUCTION LLCDepartment of Veterans Affairs · PROJECT 541-19-101 RENOVATE OPERATING ROOM - VAMC CLEVELAND EO 14398 | $14.85 million |
| 2026-11-30 | HIRT ELECTRIC, LLCDepartment of Veterans Affairs · HQ GUIDANCE - COMMERCIAL CLAUSES FOR OPEN MARKET CONSTRUCTION & A/E | $244,400 |
| 2026-11-23 | U.S. VET GENERAL CONTRACTING, LLCDepartment of Veterans Affairs · TASK ORDER #13 FOR 3YR PMI UNDER THE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR THE WM S. MIDDLETON VA HOSPITAL, MADISON WISCONSIN. | $2.15 million |
| 2026-11-16 | BRICAN, INC.Department of Veterans Affairs · 631-26-010 ABATE AND UPGRADE BUILDING 1 COMMON AREA. | $2.55 million |
| 2026-11-13 | PARAMOUNT CONSTRUCTION GROUP, LLCDepartment of Veterans Affairs · 586-25-101 | DB SITE PREP IR | $4.88 million |
| 2026-11-04 | KMK CONSTRUCTION, INCDepartment of Veterans Affairs · 631-18-002 UPGRADE ELECTRICAL PHASE 2 PART 3: | $10.34 million |
Source: USAspending.gov, retrieved 2026-10-27. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.