NTX VAMC Utility Tunnel Pump Room: requirements and submission rules

46 requirements and 11 submission rules found in the solicitation documents for 36C25727Q0097. Use them as the start of your compliance matrix.

Solicitation number
36C25727Q0097
Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 257-NETWORK CONTRACT OFFICE 17 (36C257)
NAICS
238220
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Responses due
16 December 2026 (18 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Does not include resumes, sample forms and appendices NOTE: Pages that exceed the required page limitations will not be evaluated.
  • Page Formatting: All proposals shall be formatted using 8.5” x 11” paper size; 1” margins; 11-point font.
  • All proposals shall be valid for 90 days from closing date of solicitation.
  • DATE / TIME: 0900, 24 November 2026 POC: DeMarcus Stokes, demarcus.stokes@va.gov Submission of Questions, Proposals and Amendments: Questions: All questions shall be submitted by Thursday, December 3 2026, at 10:00 am CDT.
  • All questions submitted for this solicitation shall be electronically sent to the following email addresses: shawn.reinhart@va.gov.
  • VOLUME I SHALL ONLY CONTAIN THE BELOW: Solicitation, Offer and Award Documents, Representations and Certifications.
  • The Government will not accept Clauses and Provisions from SAM.gov, as SAM.gov does not contain VA Acquisition and Representation Clauses and Provisions.
  • All proposals shall be in a PDF format with the Solicitation Number, the Offerors’ name and Volume number.
  • The proposal shall be organized as follows: VOLUME I: Shall be one (1) entire PDF document and contain only the following documentation in the order listed below.
  • Offerors shall submit a redacted version of Technical provided in Volume I only that removes all information that could identify the offeror or reveal proprietary data.
  • The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal.

Requirements

IDRequirement
R1OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
R2This is accomplished through the Tungsten Network located at: http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
R3All SLIN pricing shall include consumables.B.2
R4The Contractor shall complete all engineering, procurement, installation, testing, startup, training, commissioning, and closeout activities within: 270 Calendar Days After Receipt of Order (ARO)B.4
R5The Contractor shall provide a detailed project schedule within ten (10) calendar days after award.B.4
R6The Contractor shall comply with the latest editions of all applicable Federal codes, standards, and VA requirements including but not limited to: 5.1 Federal Regulations. Occupational Safety and Health Administration (OSHA)... 5.2 National Fire Protection Association (NFPA)... 5.3 American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)... 5.4 International Codes... 5.5 Underwriters Laboratories (UL).B.4
R7All electrical equipment shall be UL listed and labeled for intended application. VFDs shall be minimum: NEMA 3R rated, UL listed, Suitable for the installation environmentB.4
R8All equipment and methods shall comply with applicable VA Division 23 Mechanical Specifications, Division 25 BAS Specifications, and Division 26 Electrical Specifications.B.4
R9A Texas Licensed Professional Engineer shall prepare: Pump replacement design documents, Control system modifications, Sequence of operations, Hydraulic calculations, Equipment schedules, Installation drawings
R10Within thirty (30) calendar days after award the Contractor shall submit: Shop drawings, Pump schedules, VFD schedules, Valve schedules, Control diagrams, Sequence of operation, Wiring diagrams, Installation details, Project scheduleB.4
R11Government approval shall be obtained prior to procurement.B.4
R12The Contractor shall: Perform lockout/tagout. Isolate chilled water systems. Pipe freeze or hot-tap, if necessary. Drain affected piping. Disconnect electrical systems. Disconnect controls. Disconnect instrumentation. Remove seven (7) pumps.
R13Existing motors shall be relocated to a location designated by the COR for future use.B.4
R14Install: Seven (7) new chilled water pumps. New pump bases. Anti-vibration assemblies. Anchoring systems. Alignment systems. New gauges. Differential pressure lines. Strainers. Check valves. Flow meters. Flanges. Gaskets. Piping modifications. Equipment shall meet or exceed existing hydraulic requirements.
R15The Contractor shall: Provide five (5) new VFDs. Provide input circuit breakers. Provide E-Clipse bypass packages. Program VFDs. Configure motor protection. Configure acceleration and deceleration curves. Integrate with BAS. The Contractor shall verify: Grounding compatibility. Harmonic impacts. Electrical distribution compatibility.
R16The Contractor shall: Remove pneumatic control systems. Remove pneumatic valves. Install Siemens electronic control valves and actuators. Install new control panels as required. Repair or replace control wiring as required.
R17The Contractor shall: Integrate new equipment into the Apogee/Desigo BAS. Provide Siemens-certified BAS programming. Provide all graphics modifications. Provide alarm integration. Verify communication functionality.
R18The Contractor shall perform: Mechanical Testing... Electrical Testing... Controls Testing... Functional Performance Testing...
R19The Contractor shall maintain a written Quality Control Program. At a minimum: Weekly QA/QC meetings with COR, Weekly inspections, Deficiency tracking, Corrective action reportsB.4
R20The Contractor shall provide operational and maintenance training covering: Pumps, VFDs, Valves, BAS integration, Alarm systems, Preventive maintenance. Training materials shall be provided electronically and in hard copy.B.4
R21The Contractor shall submit an Accident Prevention Plan. The Contractor shall comply with: OSHA requirements, NFPA requirements, VA safety policies, Dallas VA Medical Center requirements.B.4
R22The Contractor shall provide: Minimum Warranty One (1) year on: Labor, Installation, Controls, Programming, Contractor-furnished equipment. Manufacturer warranties shall be passed through to the Government.
R23The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.C.3
R24The Contractor will not engage in any racially discriminatory DEI activitiesC.6
R25The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.C.6
R26Offers are solicited only from VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed SDVOSBs at the time of offer shall not be considered.C.9
R27In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not VIP-listed SDVOSBsC.9
R28The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer.C.11
R29Although site visits are not mandatory, Contractors are highly encouraged to attend the scheduled visit.E.1
R30All proposals are due NLT Wednesday, December 16, 2026, at 10:00 AM CDT via e-mail only to shawn.reinhart@va.gov.E.1
R31VOLUME I SHALL NOT CONTAIN THE PWS OR ANY CLAUSES AND PROVISIONS NOT REQUIRED TO BE FILLED OUT, SIGNED AND RETURNED. DO NOT ADD ANY CLAUSES OR PROVISIONS TO YOUR OFFER THAT ARE NOT IN THIS SOLICITATION.E.1
R32OFFEROR’S ARE RESPONSIBLE FOR ENSURING THE DOCUMENTATION IN VOLUME I TECHNICAL AND VOLUME II REDACTED TECHNICAL ARE THE SAME.E.1
R33VOLUME I SHALL BE ONE (1) ENTIRE PDF AND SHALL ONLY CONTAIN PAGE 1, SECTION B.1, SECTION B.2, CLAUSES AND PROVISIONS THAT REQUIRE FILL-IN SIGNATURE AND RETURNED, OFFEROR’S TECHNICAL APPROACH, PRICE AND PAST PERFORMANCE INFORMATION. ALL PROPOSAL’S SHALL BE SUBMITTED IN TIMES NEW ROMAN 11.E.1
R34All Offeror’s are required to complete Blocks 12, 17a, 30a, 30b, 30c, and Section B.1.a.Section B
R35All Offeror’s are required to fill out and return all Clauses and Provisions that have fill-ins.Section B
R36Price using B.2 Schedule of Services continuation section. The price proposal shall be specific, complete in every detail, and separate from the technical proposal.Section B
R37Prices shall be listed as an all-inclusive Firm Fixed Unit Price that covers in full those services under each CLIN. Pricing shall not include an alternative price for a CLIN.Section B
R38DO NOT PROVIDE A CAPABILITY STATEMENT WITH YOUR TECHNICAL PROPOSAL. DO NOT RENAME OR ADD THE PHRASE CAPABILITY STATEMENT TO THE TECHNICAL APPROACH.Section B
R39The Technical Proposal shall address each factor and subfactor in the order presented below. Factor 1: Technical Approach (Subfactor 1: Engineering and Equipment Selection; Subfactor 2: Installation, and Utility-Continuity Approach; Subfactor 3: Controls and BAS Integration; Subfactor 4: Startup, Testing, and Commissioning; Subfactor 5: Project Management, Schedule, and Project Management Approach; Subfactor 6: Safety and Quality Control).Section B
R40The offeror shall provide a preliminary phasing plan identifying proposed shutdown durations and the work to be completed during each shutdown.Section B
R41The offeror shall submit a preliminary schedule showing, at a minimum: Post-award site verification; Engineering and design; Texas Professional Engineer review and sealing; Product-data and shop-drawing submissions; Government review periods; Equipment procurement; Long-lead-item delivery; Mobilization plan; Shutdown requests; Equipment replacement phases; Controls integration; Startup and commissioning; Training; Punch-list correction; Record drawings; Operations and maintenance manuals; and Final closeout.Section B
R42The offeror shall identify and provide resumes for: Project Manager; Superintendent; Mechanical foreman; Electrical foreman; Texas-licensed Professional Engineer; Controls/BAS lead; Siemens-certified programmer or authorized integrator; Startup and commissioning lead; Quality Control Manager; and Site Safety and Health Officer or competent person.
R43Offerors can provide two (2) to three (3) examples of similar work within the past three (3) years where Offeror was the prime contractor. Submission shall include: Project name and contract number and not the solicitation number; Customer Name and point of contact (name, phone, email); Period of Performance and dollar value; What you did and why it is relevant; Results and outcomesSection B
R44Redactions must be complete and permanent. Use solid black boxes or equivalent redaction tools - do not use white text, white highlighting, or methods that allow underlying text to be recovered. Do not alter the structure, pagination, or substantive content of the proposal beyond the required redactions. Label the file clearly: [SOLICITATION NUMBER – OFFEROR NAME – REDACTED” Label the document clearly on the cover page: 'REDACTED - FOR EVALUATION PURPOSES ONLY.'Section B
R45The Government will not accept more than one (1) proposal per Offeror.Section B
R46DO NOT SUBMIT SBA LETTERS VERIFYING SDVOSB STATUS.Section B

Recent awards in NAICS 238220

The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-03-01INTELLIGENT DESIGN MECHANICAL SOLUTIONS LLCDepartment of Veterans Affairs · BOISE, ID VAMC IDIQ FOR NAICS 238220 SERVICES MEDICAL GAS TESTING$6,060
2026-12-09J&B HARTIGAN, INC.Department of Veterans Affairs · TEST AND BALANCE HVAC SERVICES AT THE SALISBURY VAMC OY 1$168,220
2026-11-16AML-AMERICAN MADE LOGISTICSDepartment of Veterans Affairs · NTX VAMC TESTING & INSPECTING, PREVENTATIVE MAINTENANCE, CORRECTIVE REPAIR, EMERGENCY REPAIR, AND SERVICE CALLS$3.12 million
2026-11-15AVALON CONTRACTING INCDepartment of Veterans Affairs · ALVA HVAC REPAIR$44,747
2026-11-10ALL AMERICAN AA LLCDepartment of Veterans Affairs · EO 14398 EL PASO LIFT STATION PIPING REPAIR$19,980
2026-11-09CLARK SEMPER TEK JV LLCDepartment of Veterans Affairs · COOLING TOWERS$10.52 million

Source: USAspending.gov, retrieved 2026-11-14. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.