Flooring Replacement Services CTXVA: requirements and submission rules
41 requirements and 11 submission rules found in the solicitation documents for 36C25727Q0066. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Page Formatting: All proposals shall be formatted using 8.5” x 11” paper size; 1” margins; 11-point font.
- All proposals shall be valid for 90 days from closing date of solicitation.
- 36C25727Q0066 Page 20 of 23 NOTE: Pages that exceed the required page limitations will not be evaluated.
- 53 Room 115 POC: Greg Williams Gregory.Williams11@va.gov Submission of Questions, Proposals and Amendments: Questions: All questions shall be submitted by Tuesday, November 17, 2026, at 9:00 am CDT.
- All questions submitted for this solicitation shall be electronically sent to the following email addresses: elizabeth.muela@va.gov.
- VOLUME I SHALL ONLY CONTAIN THE BELOW: Solicitation, Offer and Award Documents, Representations and Certifications.
- The Government will not accept Clauses and Provisions from SAM.gov, as SAM.gov does not contain VA Acquisition and Representation Clauses and Provisions.
- All proposals shall be in a PDF format with the Solicitation Number, the Offerors’ name and Volume number.
- VOLUME I: Shall be one (1) entire PDF document and contain only the following documentation in the order listed below.
- Offerors shall submit a redacted version of Technical provided in Volume I only that removes all information that could identify the offeror or reveal proprietary data.
- The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal.
Requirements
| ID | Requirement |
|---|---|
| R1 | This is accomplished through the Tungsten Network located at: http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices. |
| R2 | The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, protection, cleanup, and disposal necessary to complete the work described in this SOW.B.4 |
| R3 | The Contractor shall perform the work in accordance with this SOW, the approved manufacturer installation instructions, and applicable VA safety, infection-control, fire, security, and site-access requirements.B.4 |
| R4 | The Contractor shall verify the quantities necessary to complete the required work.B.4 |
| R5 | The Contractor shall complete all work, including final cleanup and closeout documentation, within 75 calendar days after receipt of order (ARO), unless the Contracting Officer (CO) authorizes a change in writing.B.4 |
| R6 | The Contractor shall coordinate the work schedule with the Contracting Officer’s Representative (COR). Work outside normal duty hours, on weekends, or on a Federal holiday requires advance Government approval.B.4 |
| R7 | Before beginning demolition or installation, the Contractor shall meet with the COR and appropriate facility personnel to: Review existing site and substrate conditions; • Obtain approval of the proposed LVT and cove base type and color; • Establish the sequence and phasing of work; • Identify approved staging areas, temporary closures, access routes, and egress routes; • Coordinate furniture movement and restoration; and • Review the planned duration of each phase and Government access constraints.B.4 |
| R8 | Move furniture and other movable items from each work area as necessary to perform the work. Protect items from damage and return them to their original locations after flooring and cove base installation.B.4 |
| R9 | Protect adjacent finishes, walls, doors, fixtures, equipment, and occupied areas from dust, debris, adhesives, and damage.B.4 |
| R10 | Provide and maintain signs, barriers, and other controls necessary to prevent unauthorized entry into active work areas.B.4 |
| R11 | Remove debris from the work area in covered and sealed containers using routes approved by the COR or Alternate COR (ACOR).B.4 |
| R12 | Promptly transport removed materials offsite and dispose of them in accordance with applicable Federal, state, and local requirements.B.4 |
| R13 | Follow the flooring and adhesive manufacturers’ requirements for substrate preparation, moisture conditions, curing, and installation.B.4 |
| R14 | Install Government-approved LVT in accordance with the manufacturer’s written instructions. The new flooring shall match the existing flooring in the affected area as closely as commercially available, subject to Government approval.B.4 |
| R15 | Install Government-approved cove base in accordance with the manufacturer’s written instructions.B.4 |
| R16 | Install transition strips at each required doorway or flooring transition. Transition strips shall provide visible contrast with the newly installed LVT and shall be securely installed beneath the door where applicable.B.4 |
| R17 | Clean the completed flooring in accordance with the manufacturer’s recommendations.B.4 |
| R18 | Return work areas and adjacent spaces to a clean, safe, and usable condition at the end of each workday and at project completion.B.4 |
| R19 | The Contractor shall comply with all Infection Control Risk Assessment (ICRA) requirements applicable to the work.B.4 |
| R20 | The Contractor shall furnish, install, operate, and maintain all required infection-control measures, which may include barriers, negative-air machines, floor protection, dust control, sealed debris transport, and other controls appropriate to the assigned ICRA level.B.4 |
| R21 | Comply with applicable VA safety, fire, security, access, and badging requirements.B.4 |
| R22 | Repair damage caused by Contractor personnel at no additional cost to the Government.B.4 |
| R23 | The Contractor shall provide applicable manufacturer warranties and warrant its workmanship for the period stated in the contract or accepted proposal.B.4 |
| R24 | Acknowledge warranty service requests within 24 hours and provide an action plan or service response within 48 hours, unless otherwise agreed to by the Government.B.4 |
| R25 | At project completion, the Contractor shall provide a complete installation and service report containing, as applicable: • Dates of performance; • Names of technicians or installers; • Description and location of work performed; • Materials and products used; • Model and serial numbers, if applicable; • VA equipment barcode numbers, if applicable; • List of removed or replaced materials; and • Contract obligation number (642Cxxxxx).B.4 |
| R26 | The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.C.3 |
| R27 | The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.C.3 |
| R28 | In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128.C.7 |
| R29 | Although site visits are not mandatory, Contractors are highly encouraged to attend the scheduled visit.E.1 |
| R30 | VOLUME I SHALL NOT CONTAIN THE PWS OR ANY CLAUSES AND PROVISIONS NOT REQUIRED TO BE FILLED OUT, SIGNED AND RETURNED. DO NOT ADD ANY CLAUSES OR PROVISIONS TO YOUR OFFER THAT ARE NOT IN THIS SOLICITATION.E.1 |
| R31 | All Offeror’s are required to complete Blocks 12, 17a, 30a, 30b, 30c, and Section B.1.a.Section B |
| R32 | All Offeror’s are required to fill out and return all Clauses and Provisions that have fill-ins. Failure to return all fill-in Clauses and Provisions will make Offeror ineligible for award.Section B |
| R33 | The price proposal shall be specific, complete in every detail, and separate from the technical proposal.Section B |
| R34 | Prices shall be listed as an all-inclusive Firm Fixed Unit Price that covers in full those services under each CLIN. Pricing shall not include an alternative price for a CLIN.Section B |
| R35 | DO NOT PROVIDE A CAPABILITY STATEMENT WITH YOUR TECHNICAL PROPOSAL. DO NOT RENAME OR ADD THE PHRASE CAPABILITY STATEMENT TO THE TECHNICAL APPROACH.Section B |
| R36 | Offerors can provide two (2) to three (3) examples of similar work within the past three (3) years where Offeror was the prime contractor. Submission shall include: • Project name and contract number and not the solicitation number • Customer Name and point of contact (name, phone, email) • Period of Performance and dollar value • What you did and why it is relevant • Results and outcomesSection B |
| R37 | Redactions must be complete and permanent. Use solid black boxes or equivalent redaction tools - do not use white text, white highlighting, or methods that allow underlying text to be recovered.Section B |
| R38 | Label the file clearly: [SOLICITATION NUMBER – OFFEROR NAME – REDACTED” and Label the document clearly on the cover page: "REDACTED - FOR EVALUATION PURPOSES ONLY."Section B |
| R39 | Technical Approach / Methodology... 25 Pages (PDF). Does not include resumes, sample forms and appendices |
| R40 | DO NOT SUBMIT SBA LETTERS VERIFYING SDVOSB STATUS.Section B |
| R41 | Any exception to the solicitation terms and conditions shall be clearly identified and accompanied by a complete rationale.Section B |
Recent awards in NAICS 238330
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-27 | HUOT CONSTRUCTION AND SERVICES, INC.Department of Veterans Affairs · 656-26-201, REPLACE CARPET, ST CLOUD, MN | $1.70 million |
| 2026-10-07 | LINMARKS COMMERCIAL FLOORING, INCDepartment of Veterans Affairs · 620-26-15HPT REPLACE PT FLOORING | $139,870 |
| 2026-09-29 | RALLI POINT LLCDepartment of Veterans Affairs · WELDED SHEET FLOORING | $19,850 |
| 2026-09-18 | CAROLINA GROUP PROPERTIES LLCDepartment of Veterans Affairs · REPLACEMENT OF CANTEEN FLOOR | $136,759 |
| 2026-09-18 | SENTINEL SERVICES, LLCDepartment of Veterans Affairs · FLOOR INSTALL | $99,996 |
| 2026-09-14 | MEAK SOLUTIONS LLC.Department of Veterans Affairs · INSTALL EPOXY KITCHEN FLOORING | $76,045 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.