J041--RFQ-SDVOSB-Metasys Building Automation System Johnson Controls Services: requirements and submission rules
26 requirements and 15 submission rules found in the solicitation documents for 36C25627Q0010. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 36C25627Q0010 Page 45 of 54 Submit questions in writing to Shasta.Britt@va.gov no later than the date and time stated in this notice and solicitation.
- Submission instructions, due date, and points of contact.
- Submission Deadline, Method, and File Naming Submit the complete quotation by email to Shasta.Britt@va.gov no later than the date and time stated in this notice and solicitation.
- 36C25627Q0010 Page 41 of 54 Government will not apply both this proration and a separate percentage-based staffing deduction to the same staffing deficiency. iii) Deductions shall be applied only once for the same performance deficiency and shall not duplicate remedies for the same occurrence.
- The Government is not obligated to infer compliance, locate omitted information, or permit correction after the submission deadline.
- Option Year 4: 03/01/2031 - 02/29/2032 Response Date and Time: Quotations shall be submitted electronically no later than the date and time stated in this notice and solicitation.
- Questions regarding this solicitation shall be submitted electronically no later than the date and time stated in this notice and solicitation in writing to: Shasta M.
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Offerors shall be actively registered in the System for Award Management (SAM) and, at the time of offer submission and award, be verified as an SDVOSB through SBA VetCert.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows:
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.” (2) FASCSA Orders.
- (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
Requirements
| ID | Requirement |
|---|---|
| R1 | The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.C.2 |
| R2 | In a joint venture that complies with paragraph (d) of this clause, the SDVOSB party or parties to the joint venture shall perform at least 40 percent of the work performed by the joint venture. Work performed by the SDVOSB party or parties to the joint venture must be more than administrative functions.C.2 |
| R3 | The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.C.7 |
| R4 | The Contractor shall provide and maintain the following minimum onsite staffing throughout contract performance: a. Day shift: Three (3) qualified Metasys BAS Controls Technicians. b. Evening shift: One (1) qualified Metasys BAS Controls Technician capable of independently supporting mission-critical healthcare facility operations. c. Emergency coverage: Qualified personnel sufficient to meet the emergency-response requirements in the Performance Requirements Summary (PRS).D.1 |
| R5 | At least two of the four required technicians shall be accepted for the advanced duties in Section 9.2.3. The remaining technicians shall not independently perform advanced duties unless separately accepted for those duties.D.1 |
| R6 | Experience: At least one (1) year of direct experience supporting Johnson Controls Metasys BAS operations, service, maintenance, or troubleshooting. The evening-shift technician shall possess a minimum of two (2) years of BAS controls experience, including demonstrated advanced competency in troubleshooting, controller programming, system optimization, and independent support of mission-critical BAS operations in a healthcare, laboratory, pharmaceutical, data-center, or comparably complex facility.D.1 |
| R7 | Training: At least eighty (80) hours of Metasys-focused training completed through a Johnson Controls training program or an officially recognized successor training program made available by Johnson Controls following a product transition.D.1 |
| R8 | The Contractor shall submit official OEM training transcripts, OEM learning records, or equivalent records demonstrating completion of the required Metasys-focused training. The Contractor shall also provide a competency matrix, signed by an authorized Contractor representative, identifying the duties each proposed technician is qualified to perform and the evidence supporting that determination.D.1 |
| R9 | All personnel requiring VA system access must complete NACI (Moderate Risk) and receive favorable adjudication.D.1 |
| R10 | Remote access is only permitted through VA-approved, VA-managed secure methods per VA Directive 6500/VA Handbook 6500; Contractor-owned or unmanaged remote lines are prohibited.D.1 |
| R11 | Within 10 business days of award, Contractor shall submit a QCP covering organization/responsibilities; inspection/testing; deficiency detection/correction; QC logs and monthly summaries; training/competency assurance (OEM certifications & acceptance workflow); continuous improvement.D.1 |
| R12 | The Contractor shall demonstrate the ability, directly or through documented subcontracting, supplier, distributor, licensing, or OEM-authorized relationships, to obtain the technical support, software and engineering-tool access, training verification, and compatible replacement parts necessary to perform the PWS.D.1 |
| R13 | Submit two separate files: (1) Volume I—Technical/Eligibility, and (2) Volume II—Price. Files shall be searchable PDF or Microsoft Office format and shall not contain executable code, macros, password protection, or links that require the Government to create an account.E.1 |
| R14 | Volume I shall contain no price information and shall be organized in the order below.E.1 |
| R15 | Solicitation administration: signed quotation or completed SF 1449, legal business name, physical address, UEI, CAGE code, point of contact, telephone number, email address, solicitation number, quotation validity period of at least 90 calendar days, and acknowledgment of every amendment.E.1 |
| R16 | SDVOSB eligibility: evidence sufficient to identify the prime offeror and permit verification that it is certified and listed in the SBA Veteran Small Business Certification database at the time required by the solicitation. A joint venture shall identify the managing venturer and submit the joint-venture information required by 13 CFR 128.402.E.1 |
| R17 | Limitations on subcontracting: the completed and signed certification required by the solicitation, together with a concise workshare narrative identifying work to be performed by the prime, similarly situated entities, and other subcontractors. The narrative shall address the applicable limitation for the acquisition classification stated in the solicitation.E.1 |
| R18 | Technical approach: Provide a narrative organized in the same order as the Technical Compliance Matrix. The narrative shall identify the applicable PWS paragraph and explain how the offeror will satisfy each requirement assigned to Factor 1, including preventive maintenance, troubleshooting, programming, backups, reporting, inventory readiness, training, emergency response, security compliance, and quality control. The narrative shall identify proposed subcontracted OEM support and explain how the prime contractor will manage and remain responsible for that work.E.1 |
| R19 | Staffing and qualifications: identify the four proposed technicians by name and shift; identify at least two personnel proposed for advanced duties; and provide a resume or experience record, official OEM training transcript, OEM learning record, or equivalent record demonstrating completion of the required Metasys-focused training, and signed competency matrix for each individual.E.1 |
| R20 | Transition and continuity plan: describe mobilization by the first day of performance, maintenance of three day-shift and one evening-shift technicians, interim coverage within the PWS timeframes, the 30-day familiarization restriction for replacement evening/emergency personnel, and the method for preserving uninterrupted mission-critical coverage.E.1 |
| R21 | Quality control: provide a draft QCP addressing organization and responsibility, inspection and testing, deficiency detection and correction, records, technician qualification controls, reporting, and continuous improvement.E.1 |
| R22 | OEM access and supply support: provide documentation or a detailed, verifiable explanation showing the ability, directly or through documented relationships, to obtain legitimate OEM technical support, software/tool access, training verification, and OEM replacement parts required by the PWS.E.1 |
| R23 | Responsibility information, not technically rated: Identify up to three recent and relevant contracts for similar BAS controls services, including the customer, contract number, period of performance, scope, and point of contact.E.1 |
| R24 | Volume II shall include a fully completed price schedule for the base period and every option period. Enter a unit price and extended amount for each priced CLIN and provide the total for each period and the evaluated grand total.E.1 |
| R25 | The offeror shall not alter quantities, units, CLIN descriptions, Government-established NTE amounts, or periods of performance.E.1 |
| R26 | Identify every exception, deviation, assumption, or proposed alternate approach in a separate section of Volume I and cross-reference the affected solicitation requirement.E.1 |
Recent awards in NAICS 238220
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-01 | INTELLIGENT DESIGN MECHANICAL SOLUTIONS LLCDepartment of Veterans Affairs · BOISE, ID VAMC IDIQ FOR NAICS 238220 SERVICES MEDICAL GAS TESTING | $6,060 |
| 2026-12-09 | J&B HARTIGAN, INC.Department of Veterans Affairs · TEST AND BALANCE HVAC SERVICES AT THE SALISBURY VAMC OY 1 | $168,220 |
| 2026-11-16 | AML-AMERICAN MADE LOGISTICSDepartment of Veterans Affairs · NTX VAMC TESTING & INSPECTING, PREVENTATIVE MAINTENANCE, CORRECTIVE REPAIR, EMERGENCY REPAIR, AND SERVICE CALLS | $3.12 million |
| 2026-11-09 | FLOWSENSE, LLCDepartment of Veterans Affairs · INSTALL CHILL WATER SYSTEM FILTRATION & STEAM CONDENSATE POLISHER | $1.55 million |
| 2026-11-05 | JETT'S SPECIALTY CONTRACTING, LLCDepartment of Veterans Affairs · PROJECT 658-24-102 REPLACE BUILDING 2 AIR HANDLER UNITS | $4.89 million |
| 2026-11-04 | DUNBAR MECHANICAL CONTRACTORS, LLCDepartment of Veterans Affairs · SPECIAL AHU COIL REPLACEMENT | $54,404 |
Source: USAspending.gov, retrieved 2026-11-11. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.