CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION: requirements and submission rules
47 requirements and 0 submission rules found in the solicitation documents for 36C25626R0131. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Date Bond Executed (Must Not Be Later Than Bid Opening Date) |
| R2 | This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services. |
| R3 | Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. |
| R4 | Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. |
| R5 | When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated "Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum. |
| R6 | When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability. |
| R7 | Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals. |
| R8 | Type the name and title of each person signing this bond in the space provided. |
| R9 | TEMPORARY TOILET FACILITIES SUPPLIED AND MAINTAINED BT CONTRACTOR FOR DURATION OF CONSTRUCTION ACTIVITIES. |
| R10 | STAGING AREA, COORDINATE WITH COR FOR EXACT LOCATION. CONTRACTOR PERMITTED 20'X50' AREA (140 L.F. INCLUDING GATE). PROVIDE 6' H TEMPORARY CHAIN LINK PANEL FENCING WITH SCREEN AND ONE 8' WIDE SWINGING GATE. PANEL FENCING TO BE WEIGHTED WITH SAND BAGS. |
| R11 | CONTRACTORS TO NOT BLOCK ROADWAYS AT ANY TIME DURING CONSTRUCTION. |
| R12 | TEMPORARY PLASTIC BARRIER TO BE INSTALLED WHILE EXISTING CONCRETE SLAB REMOVED, 6 MIL. MIN. |
| R13 | WORK SHALL CONFORM TO APPLICABLE NATIONAL CODES AND VA STANDARDS. |
| R14 | INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. |
| R15 | PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED. |
| R16 | EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR. |
| R17 | PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.). |
| R18 | FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT. |
| R19 | NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK. |
| R20 | SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT. |
| R21 | PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS. |
| R22 | PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS. |
| R23 | DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING COORDINATION AT NO ADDITIONAL COST. |
| R24 | CONTRACTOR SHALL COORDINATE ANY MECHANICAL OR PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR TWO (2) WEEKS IN ADVANCE AND CONFIRM 48 HOURS PRIOR. |
| R25 | ALL DEMOLISHED EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN ACCORDANCE WITH VAPHS REQUIREMENTS AND ENVIRONMENTAL REGULATIONS. |
| R26 | CONTRACTOR SHALL COORDINATE CHILLED WATER SYSTEM SHUTDOWN WITH VA FACILITY PERSONNEL. CONTRACTOR SHALL DRAIN, REFILL, AND RESTORE THE SYSTEM AS REQUIRED TO PERFORM CHILLER, VALVE, AND ASSOCIATED PIPING REPLACEMENT. PROVIDE WATER TREATMENT IN ACCORDANCE WITH THE VA’S EXISTING PLANT WATER TREATMENT PROGRAM. |
| R27 | CHILLED WATER PLANT SHUTDOWN: REPLACEMENT OF VALVES AT THE CHILLER CONDENSER AND EVAPORATOR CONNECTIONS WILL REQUIRE A FULL CHILLED WATER PLANT SHUTDOWN. CONTRACTOR SHALL COORDINATE ALL SHUTDOWN ACTIVITIES WITH VA FACILITY PERSONNEL. WORK SHALL BE SCHEDULED DURING WINTER MONTHS AND DURING A PERIOD APPROVED BY THE VA TO MINIMIZE IMPACT TO FACILITY OPERATIONS. CONTRACTOR SHALL COMPLY WITH ALL VA-ESTABLISHED SHUTDOWN LIMITATIONS AND DURATION REQUIREMENTS. |
| R28 | TEMPORARY COOLING FOR CRITICAL AREAS SHALL BE PROVIDED IF REQUIRED BY VA. |
| R29 | FOR PIPING 6" AND BELOW, MECHANICAL COUPLINGS ARE OPTIONAL. ABOVE 6", WELDED PIPE WITH FLANGES IS ONLY APPROVED JOINING METHOD. |
| R30 | CHILLER #1 SHALL BE INTEGRATED INTO THE EXISTING BAS AND SHALL OPERATE AS PART OF THE BASE PLANT CHILLER GROUP. CONTROL SEQUENCES SHALL BE CONSISTENT WITH THOSE APPLIED TO THE REMAINING CHILLERS SERVING THE CENTRAL PLANT. |
| R31 | THE REPLACEMENT CHILLER SHALL BE PROVIDED WITH BACNET COMMUNICATION COMPATIBLE WITH THE EXISTING BAS. |
| R32 | 60 MONTHS (5 YEAR) PARTS, LABOR AND REFRIGERANT WARRANTY FROM DATE OF SHIPMENT. |
| R33 | CHILLER PERFORMANCE SHALL MEET OR EXCEED THE MINIMUM EFFICIENCY REQUIREMENTS OF ASHRAE 90.1 2022 AS TESTED IN ACCORDANCE WITH AHRI STANDARD 550/590. |
| R34 | ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS. |
| R35 | BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM. |
| R36 | ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE. |
| R37 | ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT". |
| R38 | ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY. |
| R39 | FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS. |
| R40 | COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED. |
| R41 | CONTRACTOR SHALL COORDINATE ANY ELECTRICAL SYSTEM REQUIRED SHUTDOWN WITH THE COR TWO WEEKS IN ADVANCE AND CONFIRM 48 HOURS PRIOR. |
| R42 | CONTRACTOR SHALL OBTAIN A VA HOSPITAL DIRECTOR ISSUED, HOT WORK PERMIT FROM THE COR OR APPROVED REPRESENTATIVE. CONTRACTOR SHALL OBTAIN THE PERMIT A MINIMUM OF TWO WEEKS PRIOR TO ANY WORK THAT WILL CAUSE A POWER OUTAGE OR WORK THAT IS CONSIDERED "HOT WORK". |
| R43 | PRIOR TO SUBMITTING PROPOSAL, BIDDER SHALL EXAMINE ALL GENERAL CONSTRUCTION DRAWINGS. |
| R44 | NOTIFY COR/VA NO LESS THAN 14 DAYS (TWO WEEKS) IN ADVANCE OF A SHUTDOWN OF ANY ELECTRICAL CIRCUIT FOR CHANGEOVER, AND SUCH A CHANGEOVER SHALL BE DONE DURING HOURS AS DIRECTED BY COR/VA. WORK SHALL BE SCHEDULED SO THAT AT NO TIME WILL ANY EMERGENCY FEEDER, CIRCUIT, OR FIRE ALARM ZONE BE OUT OF SERVICE. PROVIDE NECESSARY TEMPORARY FEEDERS TO ACCOMPLISH THIS REQUIREMENT. |
| R45 | ELECTRICAL CONTRACTOR SHALL FOLLOW SITE LOCK-OUT/TAG-OUT GUIDELINES TO DEENERGIZE EQUIPMENT. |
| R46 | If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.Section A |
| R47 | If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.Section A |
Recent awards in NAICS 238220
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-01 | INTELLIGENT DESIGN MECHANICAL SOLUTIONS LLCDepartment of Veterans Affairs · BOISE, ID VAMC IDIQ FOR NAICS 238220 SERVICES MEDICAL GAS TESTING | $6,060 |
| 2026-11-16 | AML-AMERICAN MADE LOGISTICSDepartment of Veterans Affairs · NTX VAMC TESTING & INSPECTING, PREVENTATIVE MAINTENANCE, CORRECTIVE REPAIR, EMERGENCY REPAIR, AND SERVICE CALLS | $3.12 million |
| 2026-11-05 | JETT'S SPECIALTY CONTRACTING, LLCDepartment of Veterans Affairs · PROJECT 658-24-102 REPLACE BUILDING 2 AIR HANDLER UNITS | $4.89 million |
| 2026-11-02 | F & C GROUP JV LLCDepartment of Veterans Affairs · REPLACE MORGUE FREEZERS AT BRONX VAMC | $2.34 million |
| 2026-11-01 | PRO-MECHANICAL LLCDepartment of Veterans Affairs · EMERGENCY HOT WATER VALVE REPLACEMENTS | $73,375 |
| 2026-11-01 | M.R. FRANCESCHINI, LLCDepartment of Veterans Affairs · REPAIRS SPIRAX SARCO PUMPS AT THE VA CARIBBEAN HEALTHCARE SYSTEM | $31,684 |
Source: USAspending.gov, retrieved 2026-10-31. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.