Y1PZ--Project 629-25-104 ED Suicide Risk Mitigation Fence: requirements and submission rules
49 requirements and 6 submission rules found in the solicitation documents for 36C25626R0117. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- HOUR & DATE for Receipt of Offers is EXTENDED to: 12-11-2026 4:00PM CST 629-3670162-8563-854200-2543 23NRNRA63 X 1 The purpose of this amendment is to extend the Request for Proposal (RFP) submission deadline to December 11, 2026, at 4PM Central Time to allow the Government additional time to respond to Requests for Information (RFI's).
- Any request for information relating to this project, presented to the Contractor, shall be submitted to the CO for response.
- CONTRACT ID CODE FACILITY CODECODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14.
- For every site visit conducted under the construction period services, a report shall be submitted to the VA including date, time, observations, log of those present, signature of the employee completing the report.
- Government and shall be submitted to the CO at the conclusion of the project.
- Requirements: All contract drawings shall be provided by the Southeast Louisiana Veterans Health Care System in AutoCAD (.dwg) format (release 2015 or higher), Revit, PDF, and CALS (.cal) format for all drawing submissions and for final construction documents.
Requirements
| ID | Requirement |
|---|---|
| R1 | Please acknowledge this amendment with your proposal submission. |
| R2 | The Contractor shall provide all labor, supervision and resources required to achieve the following construction services: Contractor shall perform construction services including, at a minimum, installation of fencing per drawings and specifications provided (ref. TMM 2515_Architecture_BID DOCUMENTS & 2515 VA New Orleans ED Fence - SPECIFICATIONS – BD) as well as the completion of tasks listed in Sections 1.2.1 thru 1.2.7. |
| R3 | The Contractor shall complete construction for the installation of a new coated non-climb fencing and stainless-steel cable mesh infill screening along both outboard sides of the emergency ramp driveway as well as the entire perimeter of the second level emergency department parking deck which will also include the oval-shaped opening in the middle. |
| R4 | The Contractor shall provide all necessary investigations, verification of as-built conditions, and construction administration for the execution of the project. The contractor shall review all product submittals for construction plan compliance, conduct site visits, review requests for information (RFI), maintain and produce accurate post construction documents for submission to the VA. |
| R5 | The Contractor shall complete all construction services required under this SOW in 145 calendar days of issuance of the Notice-To-Proceed. Work shall begin no more than ten (10) calendar days after notice of award. Work on federal holidays and weekends is prohibited unless written approval is granted in advance by the COR or CO. |
| R6 | The Contractor shall also complete preconstruction, construction, and post construction period services. |
| R7 | The Contractor shall commence work only when the Contracting Officer (CO) has conducted a “kick-off” meeting and a Notice to Proceed has been issued. |
| R8 | For every task, the Contractor shall identify in writing all necessary subtasks (if any), associated costs by task, and associated sub-milestone dates. The Contractor's subtask structure shall be reflected in the technical proposal and detailed work plan. |
| R9 | All written deliverables shall be phrased in layman’s language. Statistical and other technical terminology shall not be used without providing a glossary of terms. |
| R10 | All construction performed under this contract shall adhere to the current editions of the following: NFPA, NEC, ASHRAE, TJC, ASME, ANSI, OSHA, ASTM, ASSE or as otherwise noted the Master VA Specifications and VA Directives. |
| R11 | At a minimum, the following line items shall be fully performed: 4.5.1. Install suicide risk mitigation fencing for the entire perimeter of the ED ramp, the second level deck, and oval opening in the middle of the deck. |
| R12 | The challenge of construction is to ensure the fencing meets all suicide risk and security requirements without compromising aesthetics. |
| R13 | Modify existing construction to meet the design intent. |
| R14 | Provide a construction solution which can be structurally supported by existing structures, that will not compromise the functionality of the structures. |
| R15 | Provide a construction solution which allows for the safe, continuous operation of the entire SLVHCS Medical Center during all phases of construction. |
| R16 | The Contractor shall include the services of required disciplines as appropriate for the project. |
| R17 | The contractor shall conduct site visits, at no cost to the Government, should issues arise with implementation of the construction. If the existing design should prove to be unfeasible or incapable of being implemented, the contractor shall address the issue with the COR by means of an RFI for resolution. |
| R18 | The construction contractor shall maintain accurate redline drawing and the A/E will incorporate changes into final as-built documents. A note for the requirement of accurate As-Built drawings is to be clearly shown on each sheet of the construction drawings. The complete set of "as-built" 30 in. by 42 in. drawings (one (1) set) and writeable AutoCAD CD disks will be delivered to the Chief, Facilities Management Service. The reproducible as-built drawings will be delivered in good condition, inside of a protective-drawings mailing tube, and with an appropriate cover letter. |
| R19 | Prior to beginning construction, the contractor shall review each reference listed below [Section 4.11.3]. |
| R20 | Contractor is responsible for verifying existing conditions. Deviations impacting cost or schedule must be reported for CO determination before proceeding. |
| R21 | The cost of all communications, mailings, copying and reproductions initiated by the Contractor in providing services shall be included in the cost proposal without additional reimbursement. |
| R22 | The construction contractor shall correspond via MSTeams, Procore, BIM360 and/or as a method approved by the COR in a format capable of large file storage and distribution. |
| R23 | The Contractor shall provide access to the site to all stakeholders associated with the project. |
| R24 | Scheduled submittals (SD, DD & CD) shall be delivered by courier or overnight mail service. |
| R25 | The Contractor shall conduct site visits to verify existing conditions. |
| R26 | Contractor Furnished Deliverables: Site investigation of existing systems detailing current conditions including, but not limited to: 5.3.1.1. Existing plumbing/piping 5.3.1.2. Architectural and Structural |
| R27 | The contractor shall keep meeting minutes and written responses to review comments within one week of the meeting conclusion or receipt of comments for all formal meetings between the contractor and the VA. File Format: Electronic (PDF) |
| R28 | The contractor shall conduct site visits as part of the construction period services. All costs associated with travel for the noted site visits shall be borne by the Contractor and not the Government. |
| R29 | The Contractor shall also conduct as many site visits with the VA as necessary to completely assess the property and develop the bid documents as requested. |
| R30 | The contractor shall provide a schedule of values and a timeline schedule for the construction services. |
| R31 | The Contractor shall adhere to all reporting requirement as outlined in this statement of work. Any items that are not covered explicitly in this Statement of Work shall be reported to the Contracting Officer immediately unless indicated otherwise after contract commencement. |
| R32 | The Contractor is responsible for providing transportation/travel for all materials, supplies, personnel, and all items needed for the duration of this contract unless stated otherwise elsewhere. Site visits and overall travel to the job sites in all instances covered under this contract shall be wholly provided by the Contractor including but not limited to transportation, parking fees, tolls, gas mileage, etc. |
| R33 | The Contractor shall conduct additional site visits as determined necessary by the COR. |
| R34 | All Contractor personnel must check-in with their designated VA point of contact or other identified staff prior to beginning any work. |
| R35 | The Contractor and their personnel / subs shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA property. |
| R36 | The Contractor and their personnel / subs shall always wear visible identification while they are on the premises. The Contractor shall sign in with the VA Police services prior to beginning work each workday. |
| R37 | VA does not provide parking spaces at the work site; the Contractor must obtain off-site parking. It is the responsibility of the Contractor to park in the appropriate off-site parking areas. |
| R38 | Smoking is prohibited inside/outside any building other than the designated smoking areas. |
| R39 | Possession of weapons is prohibited. |
| R40 | The Contractor shall obtain all necessary licenses and/or permits required to perform the work. The Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. |
| R41 | Contractor personnel approved for unescorted access shall sign in daily but are not required to be accompanied by VA staff. |
| R42 | A Contractor / Subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or project. |
| R43 | All Contractors, Subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. |
| R44 | The Contractor expressly undertakes, both directly and through its subcontractors, to always take every precaution for the protection of persons and property, including Medical Center employees and property and its own. |
| R45 | The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work. |
| R46 | The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the Medical Center property from injury of loss arising in connection with this contract. The Contractor shall make good on any loss, except as may be by agents or employees of the Medical Center. |
| R47 | The contractor shall notify the COR as soon as practicable following emergency actions and provide written justification within 24 hours. |
| R48 | The Contractor shall ensure that services provided to the Government under this agreement comply with all applicable laws, statutes, regulations, and guidelines that govern the operation of systems by the Government. The Contractor shall also ensure that all services provided to the Government under this agreement comply with all Government mandated procedures, standards, and requirements. |
| R49 | Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-02-15 | MONUMENT CONSTRUCTION SERVICES, LLCDepartment of Veterans Affairs · 402-26-REPAVE SOUTHGATE ROAD AT TOGUS VAMC. | $734,500 |
| 2027-02-05 | KOALA ROOFING LLCDepartment of Veterans Affairs · REPLACE ROOF POLICE BUILDING MARTINEZ CA VAMC | $124,659 |
| 2026-12-14 | ARMCORP CONSTRUCTION INCDepartment of Veterans Affairs · RENOVATE 6S FOR INPATIENT MENTAL HEALTH | $8.76 million |
| 2026-12-11 | AMERICAN VET INDUSTRIES, LLCDepartment of Veterans Affairs · SITE PREP OR FISHER HOUSE | $2.30 million |
| 2026-12-08 | LC FLUHARTY CONSTRUCTION LLCDepartment of Veterans Affairs · PROJECT 541-19-101 RENOVATE OPERATING ROOM - VAMC CLEVELAND EO 14398 | $14.85 million |
| 2026-12-03 | VETERANS DEVELOPMENT CORPORATION, INC.Department of Veterans Affairs · 523-09-156 SUPPLY PROCESS DISTRIBUTION HVAC CORRECTIONS AT VAMC JAMAICA PLAIN, MA. THIS WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE RECONFIGURATION AND UPGRADE OF HVAC SYSTEMS IN BUILDING 1 FLOOR 2 | $3.62 million |
Source: USAspending.gov, retrieved 2026-11-22. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.