Modernize 6N Inpatient Restrooms (Swing for 3N): requirements and submission rules

27 requirements and 15 submission rules found in the solicitation documents for 36C25626R0108. Use them as the start of your compliance matrix.

Solicitation number
36C25626R0108
Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 256-NETWORK CONTRACT OFFICE 16 (36C256)
NAICS
236220
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Responses due
20 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • VA Form 10101, Contractor Production Report, or a Contractor generated form containing the same type of information shall be signed, dated and submitted by the Contractor superintendent.
  • Requests for Information (RFIs): RFIs are due, utilizing Exhibit F, no later than (NLT) 2:00 PM CST 14 calendar days prior to the date set for receipt of proposals or as amended and will not be accepted after this date.
  • All offerors shall submit, as part of their price proposal, information pertaining to their past Safety and Environmental record using Exhibit D.
  • Proposal Due Date : Proposals and Bid Bonds are due NLT the date/time shown in Block 13a of Standard Form (SF) 1442.
  • 36C25626R0108 Page 22 of 61 (iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
  • Joint Venture Agreements must be submitted with proposal to be considered.
  • Proposals submitted by non-verified SDVOSB shall be excluded from award consideration.
  • Joint Ventures must be verified SDVOSBs and registered in SAM at the time of solicitation response and at award.
  • The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility.
  • The Offeror shall demonstrate completed recent and relevant projects at a hospital/ medical center (Federal or other than Federal) project of this same size, scope, and complexity (or greater).
  • These ratings shall have the same weight as the ratings of the offeror.
  • The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.” (2) FASCSA Orders.
  • (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
  • (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
  • (2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows: (i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at https://dibnet.dod.mil.

Requirements

IDRequirement
R1VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award
R2This procurement is a total Service Disabled Veteran Owned Small Business (SDVOSB) set-aside under Public Law 109-461. Offerors must be registered and certified as a SDVOSB in the SBA Veteran Small Business Certification site at https://veterans.certify.sba.gov. Proposals received from contractors who are not certified as a SDVOSB at the SBA site shall not be considered for evaluation and award. This includes Joint Ventures.
R3Verification showing seal shall be included with proposal (pricing volume).
R4CONTRACTORS ARE REQUIRED TO SUBMIT ALL QUESTIONS IN WRITING, USING EXHIBIT F, (EMAIL IS ACCEPTABLE) TO THE CONTRACT SPECIALIST SHOWN ABOVE NO LATER THAN 1400 CST 14 CALENDAR DAYS PRIOR TO THE DATE/TIME SET FOR RECEIPT OF PROPOSALS.
R5THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12B.) [Indicated as 10 CALENDAR DAYS]
R6For procurement awards in excess of $150,000, this report [VETS-4212] must be completed and accepted prior to any Federal contract award.
R7All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.A.5
R8Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.A.5
R9If the NCCI cannot issue an EMR because the offeror lacks insurance history, offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned offeror a Unity Rating of 1.0.A.5
R10EXHIBIT E SURETY FORM OFFEROR INSTRUCTIONS: To be completed by Surety and SUBMITTED BY OFFEROR AS A PART OF THE TECHNICAL PROPOSAL PACKAGE.
R11NOTE: Bid Bond signatures should be wet signed and there should be no white out corrections. Impressions from Notary must be clearly visible.A.5
R12Subfactor 1a. Schedule: Instructions: Contractor shall provide a Draft Project Schedule, with a 02/03/2027 Notice to Proceed fictitious, Start Date (for purposes of the Proposed Draft Schedule only). The provided schedule shall be all inclusive from the pre-construction conference, preparation of the site & mobilization, critical milestones of completing the project, punch list items, demobilization, to closeout while adhering to the period of performance.
R13Subfactor 1b. Quality Management: Instructions: Contractor shall provide a detailed explanation of proposed quality control techniques for compliance of the solicitation requirements. Contractor shall provide a narrative on how quality issues are managed and resolved for construction projects. Contractor shall provide the personnel responsible for quality management & specify the authority the individual has to ensure quality work is provided.
R14Subfactor 2a. Key Prime Contractor Staff: Instructions: Contractor shall provide projected personnel names on an Organizational Chart (structured with the proposed Subcontractors projected in subfactor 2b). Contractor shall provide Resumes of the offeror’s proposed project management personnel (i.e., Site Superintendent, Project Manager, Quality Control Manager) complete with education, qualifications, and experience. Each Resume shall include current workload and the projected workload to cover the projected period of performance.
R15Offeror shall provide a narrative description of how the proposed project management personnel will be best utilized to obtain project completion with the proposed subcontractors.A.6
R16Subfactor 2b. Subcontractors: Submission Requirement: 1.) Exhibit C – Offeror shall provide a completed Exhibit C and incorporate the below criteria into a narrative format to support the evaluation. 2.) If an Offeror intends to self-perform then the offerors proposal must clearly annotate this intent.A.6
R17Offeror shall provide the names of projected key subcontractors and the subcontractor’s associated socioeconomic status for the chosen project. Offeror shall provide subcontractor narratives for each of the projected key subcontractors. Each narrative shall include the subcontractor’s locality and experience with construction at medical centers. Each narrative shall include the subcontractor’s projected workload to cover the projected period of performance. Offeror shall provide resumes of the projected key subcontractor’s proposed project management personnel, complete with education, qualifications, and experience. Each resume shall include current workload and the projected workload to cover the projected period of performance.A.6
R18FACTOR 3 - PAST PERFORMANCE: Submission Requirement: 1.) Offeror Shall provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity, and scope to this project. 2.) Exhibit A – Offeror shall provide a completed Exhibit A to satisfy evaluation criteria below or may be used for consideration of current project examples (the form must clearly annotate what it is being used for).A.6
R19Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors. Project (s) shall have a minimum Construction value of between $ 500,000 and $1,000,000 and be 100% complete.A.6
R20For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project to demonstrate recent/relevancy.A.6
R21If the Offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared past performance, projects shall be submitted for each Joint Venture partner.A.6
R22Past Performance Questionnaire (PPQ-Exhibit B): – Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by Offeror and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY.A.6
R23Factor 4 Submission Requirement: 1.) Signed 1442 and Amendments 2.) Completed Schedule of Offer Items 3.) Completed Continuation of 1442 (Divisional Price Distribution Sheet) 4.) Completed Exhibit D (EMR) & Exhibit E (Surety) 5.) Legible Bid Bond (impressions from notary must be clearly visible) 6.) Completed VAAR Clause 852.219-75 7.) 52.219-1 Small Business Representation 8.) 52.209-7 Information Regarding Responsibility Matters (if applicable) 9.) 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (if applicable) 10.) 52.219-28 Post-Award Small Business Program Representation 11.) 52.225-9 Buy American – Construction Materials (Oct 2022)A.6
R24(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation. (2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.A.6
R25Do not submit an offer unless— (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has— (i) Waived application under U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).A.6
R26The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.A.6
R27Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.A.6

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-12-08LC FLUHARTY CONSTRUCTION LLCDepartment of Veterans Affairs · PROJECT 541-19-101 RENOVATE OPERATING ROOM - VAMC CLEVELAND EO 14398$14.85 million
2026-11-30HIRT ELECTRIC, LLCDepartment of Veterans Affairs · HQ GUIDANCE - COMMERCIAL CLAUSES FOR OPEN MARKET CONSTRUCTION & A/E$244,400
2026-11-23U.S. VET GENERAL CONTRACTING, LLCDepartment of Veterans Affairs · TASK ORDER #13 FOR 3YR PMI UNDER THE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR THE WM S. MIDDLETON VA HOSPITAL, MADISON WISCONSIN.$2.15 million
2026-11-16BRICAN, INC.Department of Veterans Affairs · 631-26-010 ABATE AND UPGRADE BUILDING 1 COMMON AREA.$2.55 million
2026-11-13PARAMOUNT CONSTRUCTION GROUP, LLCDepartment of Veterans Affairs · 586-25-101 | DB SITE PREP IR$4.88 million
2026-11-04KMK CONSTRUCTION, INCDepartment of Veterans Affairs · 631-18-002 UPGRADE ELECTRICAL PHASE 2 PART 3:$10.34 million

Source: USAspending.gov, retrieved 2026-10-25. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.