Y1DZ--598-22-115 Site Utility Infrastructure-NLR: requirements and submission rules
72 requirements and 15 submission rules found in the solicitation documents for 36C25626R0084_1. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.
- Submit results of air monitoring samples, signed by CIH, within 24 hours after taking air samples.
- Response to Specification: The Contractor shall submit a point-by- point statement of compliance with each paragraph of the security specification.
- Submit the APP to the Contracting Officer Representative Government Designated Authority for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction safety conference for acceptance.
- All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements.
- After approval of submittal and prior to installation, Contractor shall furnish sample in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
- Submit water samples in sterile bottles to authorities having jurisdiction.
- Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
- The Contractor shall submit formal monthly updates to the submittal register in electronic format.
- Provide submittals in electronic format, with the exception of material samples.
- Submit sufficient information to demonstrate compliance with drawings and specifications. b.
- Submit a SIOR Letter of Acceptance to the Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the SIOR. c.
- Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.
- Include a safety margin of 50 percent for reserve capacity. a.
- All power-dissipating components shall incorporate safety margins of not less than 25 percent with respect to dissipation ratings, maximum voltages, and current-carrying capacity.
Requirements
| ID | Requirement |
|---|---|
| R1 | If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. |
| R2 | If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. |
| R3 | Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project #598-22-115, Potable Water, Eugene J. Towbin Memorial VHC, Arkansas as required by drawings and specifications. |
| R4 | Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer. |
| R5 | Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. |
| R6 | All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. |
| R7 | The Contractor shall be solely responsible for verifying that all work complies with and meets or exceeds all applicable VA standards, specifications, codes, and requirements. This obligation applies regardless of the completeness, accuracy, or content of the contract documents, drawings, or design. |
| R8 | Before starting work the General Contractor shall give one week's notice to the Contracting Officer so that security arrangements can be provided for the employees. |
| R9 | No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time. |
| R10 | The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. |
| R11 | Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. |
| R12 | The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. |
| R13 | Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. |
| R14 | Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. |
| R15 | Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR. |
| R16 | Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. |
| R17 | Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report |
| R18 | The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. |
| R19 | A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract. |
| R20 | The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications. |
| R21 | Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR. |
| R22 | Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. |
| R23 | The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. |
| R24 | Provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. |
| R25 | During the construction period through completion, provide photographic documentation of construction progress and at selected milestones including electronic indexing, navigation, storage and remote access to the documentation, as per these specifications. |
| R26 | Designate a qualified 3rd-party scheduling consultant who will develop and maintain the project schedule. The scheduling consultant must have five (5) years of experience as a lead project scheduler or previous scheduling experience on at least three (3) projects of similar size and scope. |
| R27 | Submit an initial schedule within 7 calendar days after Notice to Proceed (NTP). Include full schedule details for the first 60 calendar days of work starting on the NTP date and show the schedule ending on or before the Contract Completion Date (CCD). |
| R28 | No more than 30 calendar days after receipt of the Notice to Proceed, prepare and submit a schedule of costs to the Government for review, in accordance with the technical and schedule submittal requirements listed in this is specification. |
| R29 | No more than 30 calendar days after approval of the initial schedule, prepare and submit a baseline schedule to the Government for review, in accordance with the technical and schedule submittal requirements listed in this specification. |
| R30 | Submit the schedule update by the first Monday of the following month. Each monthly schedule update must be submitted with the associated schedule log. |
| R31 | Prepare and maintain the schedule using one of the following software options: a. Oracle Primavera P6 Professional (Version 22 or higher unless pre-approved); b. Microsoft Project Professional (Version 2021 or Higher). |
| R32 | The Contractor is responsible for reviewing and certifying that all submittals are in compliance with contract requirements before submitting for VA review. Proposed deviations from the contract requirements are to be clearly identified. All deviations submitted must include a side by side comparison of item being proposed against item specified. |
| R33 | Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site. |
| R34 | The Prime Contractor shall provide a Safety oversight team that includes a minimum of one (1) person at each project site, for each shift, to function as the Site Safety and Health Officer (SSHO). The Prime Contractor shall provide a minimum of one 'Full-Time' SSHO at each project site, for each shift (with no other duties) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience. |
| R35 | OSHA 10-hour Construction Outreach training within the past five years is required for all workers on site and the OSHA 30-hour Construction Outreach training within the past five years is required for Trade Competent Persons (CPs) |
| R36 | A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety and Health Technician (CSHT) shall randomly conduct a monthly site safety inspection. The CSP or CSHT shall be one that is not a part of the immediate site project team. |
| R37 | Notify and provide an initial report to the Contracting Officer Representative or Government Designated Authority as soon as practical, but no more than two hours after any Moderate or Major Mishap, High Visibility Incidents, or any weight handling and hoisting equipment mishap. No Impact/Near-Miss and Minor Mishaps shall be reported within 24 hours or as soon as practical. |
| R38 | Contractor shall provide written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and been found have negative TB screening reactions. |
| R39 | All excavations and trenches 24 inches in depth or greater shall require a written trenching and excavation permit |
| R40 | A detailed lift plan for all lifts shall be submitted to the Resident Engineer, COR and/or other Government Designated Authority 14 days prior to the scheduled lift complete with route for truck carrying load, crane load analysis, siting of crane and path of swing and all other elements of a critical lift plan where the lift meets the definition of a critical lift. |
| R41 | Construction materials testing laboratories must be accredited by a laboratory accreditation authority and will be required to submit a copy of the Certificate of Accreditation and Scope of Accreditation. |
| R42 | Perform Special Inspections in accordance with the Statement of Special Inspections, Schedule of Special Inspections and Chapter 17 of ICC IBC... Special Inspections are to be performed by an independent third party and are intended to ensure that the work of the prime contractor is in accordance with the Contract Documents and applicable building codes. |
| R43 | Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer for approval, a written and/or graphic Environmental Protection Plan |
| R44 | Contractor shall develop and implement procedures to recycle construction and demolition waste to a minimum of 50 percent. |
| R45 | Prepare and submit to the COR a written demolition debris management plan. |
| R46 | Within 30 days of contract award, the Contractor shall designate a specific individual as the Commissioning Manager (CxM) to manage and lead the commissioning effort on behalf of the Contractor. |
| R47 | The Contractor performing the lead paint removal work shall have performed a minimum of 3 previous lead paint removal projects similar in scope of this project. |
| R48 | Submit detailed, site-specific plan describing lead-based paint removal procedures. |
| R49 | The Contractor shall retain a registered Professional Engineer to design the formwork, shores, and reshores. |
| R50 | Manufacturer shall warranty their pedestrian traffic coating for a minimum of five (5) years from the date of installation and final acceptance by the Government. |
| R51 | Air-Barrier Assembly Air Leakage: Maximum 0.2 L/s/square meter (0.04 cfm/square feet) of surface area at 75 Pa (1.57 psf) differential pressure when tested according to ASTM E2357. |
| R52 | Manufacturer shall warranty their sealant for a minimum of five (5) years from the date of installation and final acceptance by the Government. Submit manufacturer warranty. |
| R53 | Submit calculations for review and approval prepared by qualified blast consultant, with a minimum of 5 years of experience in design of blast resistant window systems, verifying door assembly including anchors comply with specified blast resistance performance. |
| R54 | AHC certified hardware consultant to prepare and submit hardware schedule |
| R55 | Provide finish coats which are compatible with the prime paints used. Review other Sections of these specifications in which prime paints are to be provided to ensure compatibility of the total coatings system for the various substrates. |
| R56 | Submit complete consolidated and coordinated shop drawings for all new systems, and for existing systems that are in the same areas. |
| R57 | Material or equipment containing a weighted average of greater than 0.25 percent lead will not be used in any potable water system intended for human consumption and will be certified in accordance with NSF 61. |
| R58 | All permanently wired polyphase motors of 746 W (1 HP) or greater shall meet the minimum full-load efficiencies as indicated in the following table, and as specified in this specification. |
| R59 | All new building controllers shall be native BACnet. All new BACnet workstations, controllers, devices and components shall be listed by BACnet Testing Laboratories. All new BACnet workstations, controllers, devices and components shall be accessible using a HTML5 Web browser interface. |
| R60 | All electrical work shall be accomplished de-energized and in the Electrically Safe Work Condition (refer to NFPA 70E for Work Involving Electrical Hazards, including Exemptions to Work Permit). |
| R61 | Qualified workers who install cables and terminations shall have a minimum of five years of experience terminating cables, including experience with the materials in the approved terminations. Qualified workers who perform cable testing shall have a minimum of five year of experience performing electrical testing of medium-voltage cables, including the ability to understand, interpret test results and develop test report. |
| R62 | Grounding system resistance to ground shall not exceed 5 ohms. Make any modifications or additions to the grounding electrode system necessary for compliance without additional cost to the Government. |
| R63 | The study shall be prepared by the equipment manufacturer and performed by the equipment manufacturer’s licensed electrical engineer. |
| R64 | Prior to fabrication of the engine generator, submit... A certification in writing that an engine generator of the same model and configuration, with the same bore, stroke, number of cylinders, and equal or higher kW/kVA ratings as the proposed engine generator, has been operating satisfactorily with connected loads of not less than 75% of the specified kW/kVA rating, for not fewer than 2,000 hours without any failure of a crankshaft, camshaft, piston, valve, injector, or governor system. |
| R65 | Assign a single communications project manager to serve as point of contact for Government, contractor, and design professional. |
| R66 | The Contractor or security sub-contractor shall be a licensed security Contractor with a minimum of five (5) years experience installing and servicing systems of similar scope and complexity. The Contractor shall be an authorized regional representative of the Security Management System’s (PACS) manufacturer. The Contractor shall provide four (4) current references from clients with systems of similar scope and complexity which became operational in the past three (3) years. |
| R67 | The design, system layout, document submittal preparation, and supervision of installation and testing shall be provided by a technician that is certified NICET level III or a registered fire protection engineer. The NICET certified technician shall be on site for the supervision and testing of the system. |
| R68 | The Contractor shall submit a Shoring and Sheeting plan for approval 15 days prior to starting work. Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations. |
| R69 | Submit drawings and data showing the method to be employed in dewatering excavated areas 30 days before commencement of excavation. |
| R70 | Bollards shall be crash tested and certified in accordance with ASTM F3016 / F3016M and shall meet the following minimum performance criteria: 1. Impact speed: 30 mph (S30); 2. Vehicle: 5,000-lb surrogate passenger vehicle; 3. Dynamic penetration: Not greater than 305 mm (12 inches) (P1) |
| R71 | The tank contractor shall have the following qualifications: 1. A minimum of ten years of experience in composite tank design and construction. 2. The design, construction, and commissioning of a minimum ten composite elevated tanks of equal or greater capacity. 3. Composite elevated tank design, concrete support structure construction, and steel tank construction shall not be subcontracted. These items shall be self-performed by the contractor. |
| R72 | The contractor shall furnish and install a complete factory built above ground constant pressure booster pump station... In order for alternate equipment to be considered as pre-approved equal they must submit 15-days prior to bid-opening the following: A. A list of fifteen (15) installations where equipment manufactured is currently in similar service... B. Pump performance selections including certified curves and material design. C. Exceptions & Clarifications list noting difference between this specification and proposed equipment. |
Recent awards in NAICS 237110
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-30 | DIAMOND WEST CONSTRUCTION LLCDepartment of Veterans Affairs · 644-26-001 - PLUMBING INFRASTRUCTURE REPAIRS - PHOENIX, AZ | $7.80 million |
| 2026-11-13 | BRISTON CONSTRUCTION, LLCDepartment of Veterans Affairs · 564-19-101 CONSTRUCT NEW WATER STORAGE FACILITY-DEI EO 14398 | $14.24 million |
| 2026-10-30 | THE SEVERSON GROUP LLCDepartment of Veterans Affairs · MAINLINE REPAIR | $8,562 |
| 2026-10-28 | DIAMOND WEST CONSTRUCTION LLCDepartment of Veterans Affairs · PLUMBING INFRASTRUCTURE REPAIRS BUILDING 1,8 AND EXTERIOR IN AZ | $3.13 million |
| 2026-10-23 | FE MORAN INC INDUSTRIALDepartment of Veterans Affairs · EMERGENCY REPAIRS TO BUILDING 66 STEAM AND CONDENSATE PIPE REPLACEMENT AT FHCC IN NORTH CHICAGO, ILLINOIS. | $59,426 |
| 2026-10-09 | POWER MECHANICAL INCDepartment of Veterans Affairs · EMERGENT STEAM LEAK REPAIR | $25,000 |
Source: USAspending.gov, retrieved 2026-11-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.