Y1DZ--598-22-115 Site Utility Infrastructure-NLR: requirements and submission rules

53 requirements and 15 submission rules found in the solicitation documents for 36C25626R0084_1. Use them as the start of your compliance matrix.

Solicitation number
36C25626R0084_1
Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 256-NETWORK CONTRACT OFFICE 16 (36C256)
NAICS
237110
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Responses due
15 January 2027 (48 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.
  • Submit results of air monitoring samples, signed by CIH, within 24 hours after taking air samples.
  • Response to Specification: The Contractor shall submit a point-by- point statement of compliance with each paragraph of the security specification.
  • Submit the APP to the Contracting Officer Representative Government Designated Authority for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction safety conference for acceptance.
  • All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements.
  • After approval of submittal and prior to installation, Contractor shall furnish sample in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
  • Submit water samples in sterile bottles to authorities having jurisdiction.
  • Proposal due date: extended to 01/15/2027 at 4PM Central Time.
  • Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
  • The Contractor shall submit formal monthly updates to the submittal register in electronic format.
  • Provide submittals in electronic format, with the exception of material samples.
  • Submit sufficient information to demonstrate compliance with drawings and specifications. b.
  • CONTRACT ID CODE FACILITY CODECODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14.
  • Submit a SIOR Letter of Acceptance to the Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the SIOR. c.
  • Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.

Requirements

IDRequirement
R1Please acknowledge this amendment with your proposal submission.
R2If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
R3If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.
R4Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project #598-22-115, Potable Water, Eugene J. Towbin Memorial VHC, Arkansas as required by drawings and specifications.
R5Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
R6All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
R7The Contractor shall be solely responsible for verifying that all work complies with and meets or exceeds all applicable VA standards, specifications, codes, and requirements. This obligation applies regardless of the completeness, accuracy, or content of the contract documents, drawings, or design.
R8Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
R9The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
R10A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
R11The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
R12Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan.
R13The commercial photographer or the subcontractor used for this work shall meet the following qualifications: 1. Demonstrable minimum experience of three (3) years in operation providing documentation and advanced indexing/navigation systems including a representative portfolio of construction projects of similar type, size, duration and complexity as the Project. 2. Demonstrable ability to service projects throughout North America, which shall be demonstrated by a representative portfolio of active projects of similar type, size, duration and complexity as the Project.
R14Designate a qualified 3rd-party scheduling consultant who will develop and maintain the project schedule. The scheduling consultant must have five (5) years of experience as a lead project scheduler or previous scheduling experience on at least three (3) projects of similar size and scope.
R15Submit an initial schedule within 7 calendar days after Notice to Proceed (NTP).
R16No more than 30 calendar days after receipt of the Notice to Proceed, prepare and submit a schedule of costs to the Government for review, in accordance with the technical and schedule submittal requirements listed in this is specification.
R17No more than 30 calendar days after approval of the initial schedule, prepare and submit a baseline schedule to the Government for review, in accordance with the technical and schedule submittal requirements listed in this specification.
R18Prepare and maintain the schedule using one of the following software options: a. Oracle Primavera P6 Professional (Version 22 or higher unless pre-approved) b. Microsoft Project Professional (Version 2021 or Higher)
R19The Contractor is responsible for reviewing and certifying that all submittals are in compliance with contract requirements before submitting for VA review.
R20The Prime Contractor shall provide a minimum of one 'Full-Time' SSHO at each project site, for each shift (with no other duties) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience.
R21As a minimum the SSHO must have completed the OSHA 30-hour Construction Safety Outreach class within the past five (5) years and: 1. Seven (7) years of construction industry safety related experience. 2. OR have a safety and health degree from an accredited university or college and five (5) years of construction industry safety related experience 3. OR hold as current, a Certified Safety Professional (CSP) or a Construction Health and Safety Technician (CHST) certification and five (3) years of construction industry safety related experience.
R22OSHA 10-hour Construction Outreach training within the past five years is required for all workers on site and the OSHA 30-hour Construction Outreach training within the past five years is required for Trade Competent Persons (CPs)
R23Contractor shall provide written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and been found have negative TB screening reactions.
R24Construction materials testing laboratories must be accredited by a laboratory accreditation authority and will be required to submit a copy of the Certificate of Accreditation and Scope of Accreditation.
R25The SI must be an independent third party hired directly by the Prime Contractor.
R26SIOR must be an independent third party hired directly by the Prime Contractor and is required for the following project conditions: 1. Seismic Design Category D, E, or F; and assigned to Risk Category III, IV, or V. 2. Seismic Design Category D, E, or F; and with a height greater than 22860mm 75 ft. 3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two (2) stories above grade plane. 4. Nominal design wind speed in excess o f49 m/sec 100 mph; and assigned to Risk Category III, IV, or V. 5. Nominal design wind speed in excess of 49 m/sec 100mph; and with a height greater than 23m 75ft.
R27Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer for approval, a written and/or graphic Environmental Protection Plan
R28Contractor shall develop and implement procedures to recycle construction and demolition waste to a minimum of 50 percent.
R29Prepare and submit to the COR a written demolition debris management plan.
R30Within 30 days of contract award, the Contractor shall designate a specific individual as the Commissioning Manager (CxM) to manage and lead the commissioning effort on behalf of the Contractor.
R31The Contractor performing the lead paint removal work shall have performed a minimum of 3 previous lead paint removal projects similar in scope of this project.
R32The Contractor performing the lead paint removal work in this Section shall be familiar with the regulatory requirements associated with the work and shall have corporate lead worker protection, confined space, and respirator programs.
R33Submit detailed, site-specific plan describing lead-based paint removal procedures.
R34Before exposure to lead-contaminated dust, provide workers with comprehensive medical examination required by 29 CFR Part 1926.62 (j) Medical Surveillance.
R35Testing agency maintaining active participation in Program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology. Testing agency shall furnish equipment and qualified technicians to establish proportions of ingredients for concrete mixes.
R36Fabricator: A firm with a minimum of three (3) years' experience in type of work required by this section. Submit fabricator qualifications. Installer: A firm with a minimum of three (3) years' experience in type of work required by this section. Submit installer qualifications.
R37Provide professionally prepared calculations and certification of performance of this work, signed and sealed by a Professional Engineer registered in the state where the work is located. Perform structural design of the stair including supports for the metal stair frame.
R38Work to be performed by installer having three (3) years' experience for work relating to this section and approved in writing by traffic coating manufacturer.
R39Manufacturer shall warranty their pedestrian traffic coating for a minimum of five (5) years from the date of installation and final acceptance by the Government. Submit manufacturer warranty.
R40Submit calculations for review and approval prepared by qualified blast consultant, with a minimum of 5 years of experience in design of blast resistant window systems, verifying door assembly including anchors comply with specified blast resistance performance.
R41AHC certified hardware consultant to prepare and submit hardware schedule
R42Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years.
R43Coating inspection shall be performed by a NACE Certified Coatings Inspector (CIP Level 2 minimum) or SSPC Certified Protective Coatings Specialist independent of the coating applicator.
R44Testing and adjusting of balancing valves shall be performed by an independent NEBB Accredited Test and Balance Contractor. A final settings and flow report shall be submitted to the VA Contracting Officer's Representative (COR).
R45The study shall be prepared by the equipment manufacturer and performed by the equipment manufacturer's licensed electrical engineer.
R46The Contractor shall provide proof project superintendent with BICSI Certified Commercial Installer Level 1, Level 2, or Technician to provide oversight of the project.
R47Cable installer must have on staff a Registered Communication Distribution Designer (RCDD) certified by Building Industry Consulting Service International. The staff member shall provide consistent oversight of the project cabling throughout design, layout, installation, termination and testing.
R48The design, system layout, document submittal preparation, and supervision of installation and testing shall be provided by a technician that is certified NICET level III or a registered fire protection engineer. The NICET certified technician shall be on site for the supervision and testing of the system.
R49Bollards shall be crash tested and certified in accordance with ASTM F3016 / F3016M and shall meet the following minimum performance criteria: 1. Impact speed: 30 mph (S30) 2. Vehicle: 5,000-lb surrogate passenger vehicle 3. Dynamic penetration: Not greater than 305 mm (12 inches) (P1)
R50The work described in this section shall be performed by a company that specializes in the design and construction of composite elevated tanks. The tank contractor shall have the following qualifications: 1. A minimum of ten years of experience in composite tank design and construction. 2. The design, construction, and commissioning of a minimum ten composite elevated tanks of equal or greater capacity. 3. Composite elevated tank design, concrete support structure construction, and steel tank construction shall not be subcontracted. These items shall be self-performed by the contractor. 4. The contractor shall directly employ a full time professional engineer with a minimum five years cumulative experience in the design and construction of composite elevated tanks. The engineer shall be registered in the State of Arkansas and shall be in responsible engineering charge of the work.
R51Package system shall be Model VI as manufactured by CLAY-GREENE PACAKGE SYSTEMS or pre-approved equal. In order for alternate equipment to be considered as pre-approved equal they must submit 15-days prior to bid-opening the following: A. A list of fifteen (15) installations where equipment manufactured is currently in similar service. Shall include contact name, telephone numbers of owner/consulting engineer/contractor as well as general arrangement drawings for each installation. B. Pump performance selections including certified curves and material design. C. Exceptions & Clarifications list noting difference between this specification and proposed equipment.
R52VFDs shall be ABB ACQ-580 no equal.
R53Building shall be manufactured by AES Pre-Cast Manufacturing no equal. Tilt-up style buildings shall not be approved or considered equal. The entire frame mounted pump station shall be covered by a pre-stressed concrete enclosure. To ensure unit responsibility the pre-cast building must be supplied be the pump station manufacturer no exceptions.

Recent awards in NAICS 237110

The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-30DIAMOND WEST CONSTRUCTION LLCDepartment of Veterans Affairs · 644-26-001 - PLUMBING INFRASTRUCTURE REPAIRS - PHOENIX, AZ$7.80 million
2026-11-13BRISTON CONSTRUCTION, LLCDepartment of Veterans Affairs · 564-19-101 CONSTRUCT NEW WATER STORAGE FACILITY-DEI EO 14398$14.24 million
2026-10-30THE SEVERSON GROUP LLCDepartment of Veterans Affairs · MAINLINE REPAIR$8,562
2026-10-28DIAMOND WEST CONSTRUCTION LLCDepartment of Veterans Affairs · PLUMBING INFRASTRUCTURE REPAIRS BUILDING 1,8 AND EXTERIOR IN AZ$3.13 million
2026-10-23FE MORAN INC INDUSTRIALDepartment of Veterans Affairs · EMERGENCY REPAIRS TO BUILDING 66 STEAM AND CONDENSATE PIPE REPLACEMENT AT FHCC IN NORTH CHICAGO, ILLINOIS.$59,426
2026-10-09POWER MECHANICAL INCDepartment of Veterans Affairs · EMERGENT STEAM LEAK REPAIR$25,000

Source: USAspending.gov, retrieved 2026-11-20. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.