Z1DA--Upgrade Fire Alarm System Construction 676-22-110: requirements and submission rules
6 requirements and 1 submission rules found in the solicitation documents for 36C25226B0014-1. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- All potential bidders are responsible for monitoring and downloading all amendments from Contract Opportunities at: https://sam.gov/contracting Joint Ventures (JVs) submitting a bid shall also submit printed proof of their SBA SBS and / or with their offer.
Requirements
| ID | Requirement |
|---|---|
| R1 | Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project # 676‐22‐110: Upgrade Fire Alarm System at Tomah VA Medical Center, Tomah, WI. |
| R2 | All work, starting with preconstruction phase through construction, ending in post-substantial completion is to be accomplished within four hundred and sixty days (460) calendar days after receipt of the notice to proceed. |
| R3 | If submitting a joint-venture (JV), bidders must include a copy of the joint-venture agreement within the bid package. |
| R4 | An approved cost-loaded, Critical Path Method (CPM) construction schedule is required prior to commencement of construction. See specifications for details. CPM schedule shall be approved by the Contracting Officer or the Contracting Officer’s Representative. |
| R5 | The contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with federal, state, and local authorities, project specifications, and drawings necessary to complete the construction of this project at the VA Medical Center, Tomah, Wisconsin. |
| R6 | All work shall be completed within 460 calendar days after receiving the notice to Proceed (NTP). |
Recent awards in NAICS 238210
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-30 | LI CRAFTSMANSHIP INCDepartment of Veterans Affairs · CONDUIT DUCT BANK SURVEY | $147,999 |
| 2026-10-26 | CRITICAL POWER CONSULTANTS INC.Department of Veterans Affairs · MAINTENANCE, INSPECTION, AND TESTING PSG CONTROLS AND ATS | $191,000 |
| 2026-10-26 | F & C GROUP JV LLCDepartment of Veterans Affairs · REPLACE BOILER PLANT MAIN ELECTRICAL SWITCHGEAR CONSTRUCTION PROJECT AT THE VA NEW YORK HARBOR HEALTHCARE SYSTEM- ST ALBANS CAMPUS. THIS WORK SHALL INCLUDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, A | $2.17 million |
| 2026-10-22 | VENERGY GROUP LLCDepartment of Veterans Affairs · ELECTRICAL BPA | $4,150 |
| 2026-10-21 | SAVAGE TECHNICAL SERVICES LLCDepartment of Veterans Affairs · ELECTRICAL BPA | $90,000 |
| 2026-10-19 | FRONTLINE GROUP LLCDepartment of Veterans Affairs · MANHATTAN VA MEDICAL CENTER - HIGH VOLTAGE POWER DISTRIBUTION CABLE REPLACEMENT - URGENT AND COMPELLING | $242,552 |
Source: USAspending.gov, retrieved 2026-10-31. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.