El Paso Community Based Outreach Clinic (CBOC): requirements and submission rules
73 requirements and 15 submission rules found in the solicitation documents for 36C24W27R0004. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- No later than the due date for final proposal revisions, the Offeror must submit to the LCO: 1.
- Offeror's signed lease proposal must be saved in a generally accessible format (such as portable document format (pdf)), which displays a visible image of all original document signatures and must be transmitted as an attachment to the email.
- Offers due by 12/18/2026 In order to be considered for award, offers conforming to the requirements of the RLP must be received no later than 3pm CST on the date above.
- The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions.
- Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions.
- The term “most recent year” means that the date of awar d of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions.
- All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy; 3.
- Offerors falling under a statutory exception must also indicate by the due date for final proposal revisions what cost effective energy efficiency and conservation improvements they are proposing to make.
- The Offeror must submit plans and any other information to demonstrate that the Rentable Space yields ABOA space within the required ABOA range.
- note: paragraph must be added back in VIA RLP AMENDMENT if, AT ANY POINT PRIOR TO FPR, THE GOVERNMENT ONLY HAS OFFERS FOR New construction.
- Offeror submitting a lease proposal by email must retain in its possession, and make available upon VA's request, its original signed proposal.
- Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below.
- If the Offeror owns the Property being offered or has a long- term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.
- The Offeror must have an active registration in the System for Award Management (SAM), via the Internet at HTTPS://WWW.SAM.GOV/SAM/ prior to the Lease Award Date.
- Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM.
Requirements
| ID | Requirement |
|---|---|
| R1 | The certified SDVOSB partner must own at least 51% of the joint venture and act as the managing venturer. The service-disabled veteran must hold unconditional control over long-term and day-to-day operations without mentor or non-SDVOSB veto power over normal business choices. |
| R2 | The SDVOSB partner must perform at least 40% of the non-administrative work done by the joint venture. |
| R3 | The joint venture should be established as a separate legal entity—most commonly LLC. It must be actively registered in SAM.gov under the JV's own name and DUNS/UEI before submitting any lease proposals. |
| R4 | The joint venture agreement must explicitly detail the project purpose, profit and loss allocations, labor sources, equipment, and specific task divisions tied directly to the solicitation (avoiding generic template language). |
| R5 | The JV and its SDVOSB partner must be fully certified and eligible (via SBA/VetCert) not only at the time of the initial offer/bid, but also at the time of contract/lease award. |
| R6 | As part of the FPLS Submittal Information, for offers of new construction, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease. |
| R7 | For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Leadership in Energy and Environmental Design® for New Construction (LEED-NC) credits for Silver level certification. For LEED, this documentation is the LEED-NC scorecard. Along with the proposed scorecard or checklist, the Offeror must submit a brief statement outlining how each of the proposed credits will be achieved. If pursuing LEED-NC, the Offeror must identify the U.S. Green Building Council LEED Accredited Professionals as team members, including their roles throughout the project. |
| R8 | For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Green Globes for New Construction (GG-NC) credits for Two Green Globes level certification. If pursuing Green Globes-NC, the Offeror may add GBI Green GlobesProfessionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project. |
| R9 | Construction Schedule for New Construction. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease. |
| R10 | The Offeror must specify which utilities, if any, are excluded from the rental consideration. If any such utilities are excluded, the Offeror must obtain a statement from a registered professional engineer stating that all HVAC, plumbing, and other energy intensive Building systems can operate under the control conditions stated in the Lease. The statement must also identify all Building systems that do not conform to the system performance values, including the 'recommended' or 'suggested' values of ANSI/ASHRAE Standard 90.1, 'Energy Efficient Design of New Buildings Except Low Rise Residential Buildings,' or more restrictive state and local codes. |
| R11 | The Offeror must submit a building operating plan with the offer. Such plan must include a schedule of startup and shutdown times for operation of each building system, such as lighting, HVAC, and plumbing. Such plan must be in effect on the Lease Term Commencement Date. |
| R12 | Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a VA Proposal to Lease Space (VA Form 1364) on which Offeror must submit its offered rent and other price data, together with required information and submissions. |
| R13 | Do not attempt to complete the lease template. |
| R14 | The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO). |
| R15 | Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration, VA, in the entity name that owns and/or leases the Space to VA. |
| R16 | The Government is seeking a minimum of 21,000 to a maximum of 23,000 of American National Standards Institute/Building Owners and Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. |
| R17 | The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences. |
| R18 | The Government requires 100 surface/outside parking spaces, reserved for the exclusive use of the Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror must include the cost of this parking as part of the rental consideration. |
| R19 | The lease term must be 20 Years, 20 Years Firm, with Government termination rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 90 days’ prior written notice. |
| R20 | The Government requests Space in an area bounded as follows: North: US 54 (NE to SW); South: Intersection of Railroad Dr and US 54; East: Railroad Dr.; West: US 54 (North, South). Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration. |
| R21 | The offered Building and/or Property is preferred to have the following features as a minimum requirement: A. Direct lease, no subleases |
| R22 | Outside City Center: Space must be located 1) in an office, research, technology, or business park that is modern in design with a campus -like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking- to-square-foot ratio available on- site must at least meet current local code requirements, or, in the absence of a local code requirement, on-site parking must be available at a ratio of one (1) space for every 200 RSF of Space. |
| R23 | Employee and visitor entrances of the Building must be connected to public sidewalks by continuous, accessible sidewalks. |
| R24 | A variety of employee services, such as restaurants, retail shops, cleaners, and banks, must be located within the immediate vicinity of the Building. To be considered, amenities must be accessible from the Building by continuous sidewalks, walkways, or pedestr ian crosswalks. Amenities must be existing or the Offeror must demonstrate to the Government’s reasonable satisfaction that such amenities will exist by the Government’s required occupancy date. |
| R25 | A subway, light rail, or bus rapid transit stop should be located within the immediate vicinity of the Building, but generally not exceeding a safely accessible, walkable 2,640 feet from the principal functional entrance of the building, as determined by the LCO. |
| R26 | Offeror must examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease. |
| R27 | Although the T I requirements will not be developed fully until after award, Offerors must provide the allowance stated in the Tenant Improvement Allowance paragraph of the Lease. |
| R28 | Unless the Government prepares Design Intent Drawings (DIDs), after award the Lessor must prepare DIDs for the leased Space c onforming to the lease requirements and other Government- supplied information related to the client agency’s interior build- out requirements. |
| R29 | The Offeror must use the Security Unit Price List to provide the Government with itemized costs of these security countermeasures , and he or she must amortize the cost of any Building Specific Amortized Capital (BSAC) into the rent. |
| R30 | There must be no charge to the Government for any items that already exist in the offered Building or facility. |
| R31 | In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. |
| R32 | To demonstrate potential for efficient layout, VA may request the Offeror to provide a test fit layout at the Offeror’s expense. |
| R33 | If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror must clearly demarcate the offered Property on its site plan/map submissions and must propose an adjustment to property taxes on an appropriate pro rata basis. |
| R34 | An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions: 1. The offer includes a representation that the Building will have less than 10,000 ABOA SF of Space leased to the Federal Government upon commencement of the lease term (Seismic Form D), 2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A). 3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic Form B)... 4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic Standards (Seismic Form B)... 5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic Form C, Part 1)... 6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2). |
| R35 | The Government requires space with no asbestos -containing materials (ACM), or with undamaged, nonfriable ACM. |
| R36 | If space is offered which contains ACM, the Offeror must submit a current asbestos management plan or operations and maintenance plan, along with a current asbestos re- inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re -inspection report must conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763). |
| R37 | In order to be eligible for award, Offeror must either: A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibili ty requirements, or B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serv ing the offered Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space. |
| R38 | In order to be eligible for award, Offeror must either: A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space. |
| R39 | If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected. |
| R40 | As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. |
| R41 | All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government. |
| R42 | Upon request by the Government, Offeror must provide all known previous use of the Building. |
| R43 | Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or Property. |
| R44 | At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527- 21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration. |
| R45 | If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903- 11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. |
| R46 | An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. |
| R47 | An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance. |
| R48 | If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the VA’s Qualification Requirements for Preservation Architects and Other Specialists. |
| R49 | If the offeror is not the owner of the Property, authorization from the ownership entity to submit an offer on the ownership entity’s behalf. |
| R50 | Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell, TI, and BSAC improvements. Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state: amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer. |
| R51 | Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority. If the current zoning is not in compliance, the Offeror must submit a plan and time schedule outli ning how they will obtain all necessary zoning approvals prior to construction and how long the necessary zoning approvals will take. |
| R52 | If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to c losing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required. |
| R53 | As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease: 1. Corporation. Copy of Articles of Incorporation and bylaws... 2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership... 3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement... 4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease. |
| R54 | If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package. |
| R55 | The Offeror must submit the FPLS Information in subparagraph 1, unless the Building meets either exemption in subparagraphs 2 or 3 below. 1. FPLS Submittal Information. a. Completed VA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable). b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building). c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building). d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, provide either: I. A report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances or, II. For offers of new construction only, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease. |
| R56 | The legal description of the Property and tax ID number associated with the Property, copies of prior year tax notices and prior year tax bills, as well as any other information (such as a fact sheet, 5” wide x 3” high or larger color photograph, site plan, location map, and tax parcel map) in case of multiple tax parcels for an offered Building, or multiple buildings on a tax parcel, and any other information that may affect the assessed value, in order for the Government to perform a complete and adequate analysis of the offered Property. The Offeror is to provide a detailed overview and documentation of any Tax Abatements on the Property as outlined in the “Real Estate Tax Adjustment” paragraph of the Lease. |
| R57 | A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements. |
| R58 | The architectural plans for modernization, if the offered Building is not a modern office Building. |
| R59 | Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs 1 through 5 noted below: 1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge... 2. All plans submitted for consideration shall have been generated by a Computer Aided Design (CAD) program which is compatible with the latest release of AutoCAD. The required file extension is .DWG. Plans shall include a proposed corridor pattern for typi cal floors and/or partial floors. The CAD file showing the offered Space should show the Poly -Line utilized to determine the square footage on a separate and unique layer. All submissions shall be accompanied with a written matrix indicating the layering standard to verify that all information is recoverable. All architectural features of the Space shall be accurately shown. 3. All architectural features of the Space shall be accurately shown. If conversion or renovation of the Building is planned, alterations to meet this RLP shall be indicated. 4. Plans shall reflect corridors in place or the proposed corridor pattern for both a typical full (single tenant) floor and/or partial (multi-tenant) floor. The corridors in place or proposed corridors shall meet local code requirements for issuance of occupancy permits. |
| R60 | A statement as to whether there are existing vending facilities in the offered Building which have exclusive rights in the Building. |
| R61 | Provide evidence demonstrating amenities do or will exist by the Government’s required occupancy date. Such evidence shall include copies of signed leases, construction contracts, or other documentation as deemed acceptable by the LCO. |
| R62 | If more than 5,000 square feet of land area is to be disturbed in order to meet the Government’s requirements, (as more fully described in the lease paragraph named ENERGY INDEPENDENCE AND SECURITY ACT, sub-paragraph, a statement from Offeror that the Offeror is aware of and will comply with the specific Lease requirements concerning maintenance and restoration of the real property’s hydrology. |
| R63 | FAR 52.240-90, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment, as applicable. |
| R64 | Complete all sections of the 1217 [VA Form 1217, Lessor’s Annual Cost Statement]. |
| R65 | Complete all sections of the 1364 [VA Form 1364, Proposal to Lease Space], including, but not limited to: 1. A fully serviced Lease rate (gross rate)... 2. Improvements... 3. The annual cost per ABOA and rentable square foot (RSF) for the cost of services and utilities... 4. The annual rent to amortize the Tenant Improvements... 5. The annual rent to amortize the Building Specific Amortized Capital (BSAC) costs, if any... 6. A shell rate per ABOA and RSF for that portion of the lease term extending beyond the Firm Term... 7. Hourly overtime rate... 8. Adjustment for Vacant Leased Premises... 9. Lessors fees... 10. Rent concessions being offered... 11. Owner’s broker representative... 12. Deviations. If the Offeror requests any deviations, all deviations must be documented on Form 1364 in block labeled “Additional Remarks or Conditions with Respect to this Offer.” |
| R66 | Only offers that are compliant with operating lease limitations will be eligible for award. Offerors are obligated to provide supporting documentation at the request of the LCO to facilitate the Government’s determination in this regard. |
| R67 | The TI Allowance is 425.00 per ABOA SF... All TIs required by the Government for occupancy must be performed by the successful Offeror as part of the rental consideration, and all improvements must meet the quality standards and requirements of this RLP package and its attachments. |
| R68 | The Building Specific Amortized Capital (BSAC) amount is $12.00 per ABOA SF. The BSAC must be used for the build-out of security-related improvements in the Building in accordance with the Government-approved design intent drawings, if applicable. All security countermeasures required by the Government for occupancy must be performed by the successful Offeror as part of the rental consideration, and all improvements must meet the quality standards and requirements of this RLP package and its attachments. |
| R69 | The offer must clearly state whether the rental is firm throughout the term of the Lease or if it is subject to annual adjustment of operating costs as indicated above. If operating costs will be subject to adjustment, those costs must be specified in the proposal. |
| R70 | The Offeror must not enter into negotiations concerning the Space leased or to be leased with representatives of Federal agencies other than the LCO or their designee. |
| R71 | Factor 1 Submittal requirement: Past Performance Questionnaire(s) – See Exhibit I |
| R72 | Factor 2 Documentation requirement: Site Map (i.e. Google or equivalent) showing planned area surrounding proposed site, drawing/overlay of plan. |
| R73 | Factor 3 Submittal requirements as follows: I. Experience Qualifications: The Offeror must provide the following: Experience Narrative that lists examples of experience in successfully building, renovating, and maintaining facilities. The Offeror is limited to describing five (5) relevant projects that have been completed during the past three (3) years... II. Design Team Qualifications: The Offeror must provide a completed SF 330, 'Architect- Engineer Qualifications' for each individual or firm on the Lessor’s design team, omitting Part II Sections 10(c), 11 and 12... The Offeror must provide a copy of the license or certification of the future A/E of Record individual(s) and/or firm(s), providing architectural and engineering design services, proving their ability to practice in the State of Texas where the facility is located. Low- voltage designers shall be BICSI- certified for structural cabling. III. Construction Team Qualifications: The Offeror shall provide a completed VA Form 527 (10/15), 'Contractor’s Qualifications and Financial Information' for the Offeror, the General Contractor, Mechanical Contractor, Plumbing Contractor and Electrical Contractor, omitting sections III, IV, V, and VI. In Section VII of Form 527, the Offeror must provide a description of outstanding commitments, names, and qualifications of key personnel, and any other information related to experience, competency, and performance capabilities with construction projects similar in scope to a 21,000 to 23,000 ABOA SF medical clinical project. When applicable, the Offeror shall provide a copy of the license in the State of Oklahoma where the facility is located for the individual(s) and/or firm(s) proposed as contractors. Installers shall have OEM credentials for the Special Systems and Agency Special Requirements of this RLP. |
Recent awards in NAICS 531120
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-01 | FRONTIER BUILDING SYSTEMS INCDepartment of Veterans Affairs · RENTAL OF OFFICE SPACE TRAILERS BRIDGE | $15,000 |
| 2026-06-25 | CITY OF TAMPADepartment of Veterans Affairs · NVGAG TAMPA FL CONVENTION CENTER MAIN VENUE | $196,569 |
| 2026-04-30 | ROSE BUD PLAZA LLCDepartment of Veterans Affairs · APPROVED RATIFICATION OF AN UNAUTHORIZED COMMITMENT FOR WAREHOUSE SPACE RENTAL. | $26,000 |
| 2026-01-03 | WILLIAMS SCOTSMAN INCDepartment of Veterans Affairs · OFFICE TRAILER RENTAL | $124,460 |
| 2025-10-01 | FRONTIER BUILDING SYSTEMS INCDepartment of Veterans Affairs · MODULAR BUILDING RENTAL | $30,000 |
| 2025-09-01 | JULIET CONSTRUCTION, LLCDepartment of Veterans Affairs · EMPLOYEE TRAILER RENTAL SERVICES | $117,948 |
Source: USAspending.gov, retrieved 2026-11-13. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.