J066--GRECC Preventive Maintenance Contract, Durham VAMC: requirements and submission rules
86 requirements and 15 submission rules found in the solicitation documents for 36C24627Q0092. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- As a minimum, quotes shall include the— (1) Completed, signed and dated Standard Form (SF) 1449 with the name, address, telephone number of the Quoter, and their Unique Entity Identifier (UEI); Point of Contact and their telephone number and email address; (2) Include all information necessary to evaluate the factors contained in the Basis for Award as described in the solicitation as follows: i.
- Submit the Quote to Monique Cordero at Monique.Cordero@va.gov no later than Friday, January 8, 2027, by 10:30am EST or before the exact time specified in this solicitation.
- All quotes should be submitted via email to Monique.Cordero@va.gov no later than 10:30am EST.
- 36C24627Q0092 Page 50 of 60 (2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows: (i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at https://dibnet.dod.mil.
- This solicitation quote submission date has been amended to extend the deadline for submission to January 8,2027.
- Technical proposal shall not exceed twenty-five (25) pages in length (minimum 12-point font and no less than ½ inch margins).
- CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.” (2) FASCSA Orders.
- (i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
- (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
- (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- In accordance with FAR 52.204-7, System for Award Management, prospective quoters must be registered in the System for Award Management (SAM) database under the applicable NAICS Code.
Requirements
| ID | Requirement |
|---|---|
| R1 | OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| R2 | CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______ COPIES TO ISSUING OFFICE. |
| R3 | This solicitation is for a small business set-aside under NAICS code 811210-Electronic and Precision Equipment Repair and Maintenance. |
| R4 | Contractor shall have experience performing preventative maintenance on Beckman Model J2-21M Superspeed Centrifuge, Model L8-80 Ultra centrifuge, GPR centrifuge, Eppendorf refrigerated centrifuge, Nuair Incubator, Eppendorf Refrigerated micocentrifuge, Lab-Line/ Shaker. |
| R5 | Contractor shall also provide repairs and emergency services in accordance with the Statement of Work, terms and conditions, clauses and provisions of this solicitation. |
| R6 | Invoices shall be submitted in arrears: ... Bi-Annually in arrears |
| R7 | All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests. Submit Invoices to: https://www.tungsten-network.com/customer-campaigns/veteransaffairs Payment Office: https://www.fsc.va.gov/einvoices.aspB.1 |
| R8 | Contractor shall provide bi-annual preventative maintenance services for centrifuges and included instruments to include: trained and certified personnel, transportation, labor, all tools and equipment, materials, parts, manuals and schematics necessary to perform bi-annual preventative maintenance, repairs, and emergency repairsB.3 |
| R9 | Contractor shall provide qualified trained and certified personnel who have the experience to perform preventative maintenance on the centrifuges and included instruments to include; inspection of centrifuge and included instruments, calibration of equipment, performing test runs, repairs, and preventative maintenance in accordance with the original equipment manufacturer (OEM) maintenance schedule manuals.B.3 |
| R10 | Contractor shall provide all labor, transportation, personnel, equipment, manuals, tools, materials, parts, and schematics necessary to perform maintenance service for the centrifuges and included instruments.B.3 |
| R11 | Contractor shall provide a preventative maintenance plan outlining all services for each type of equipment and identifying the personnel who will perform the services.B.3 |
| R12 | Contractor shall provide bi-annual preventative maintenance to centrifuges and included instruments in accordance with the original equipment manufacturer (OEM) recommended maintenance manual schedule. Once preventative maintenance services are completed equipment should be calibrated and fully functional.B.3 |
| R13 | Contractor shall notify the Contracting Officer Technical Representative (COTR) of any necessary repairs and recommendations during preventative maintenance so that corrective action(s) and/or repairs can be performed or scheduled.B.3 |
| R14 | Upon completion of bi-annual preventative maintenance, service, repair, or emergency services during regular working hours, the contractor shall obtain the signature of the Contracting Officer's Technical Representative (COTR) or other designated authorized Durham VAMC GREECC representative acknowledging receipt of services. A copy of the singed service or repair ticket shall be provided to the GRECCC representative.B.3 |
| R15 | The contractor shall notify the Contracting Officer Technical Representative (COTR) or authorized Durham VAMC GRECC lab personnel of any necessary repairs and recommendations during the bi-annual preventative maintenance service so that corrective action(s) and/or repairs can be performed at that time or scheduled for a later time if all necessary parts are not available at that time and do not exceed the Government Not-to-Exceed amount of $3,000.00.B.3 |
| R16 | The contractor shall give one (1) calendar's weeks' notice prior to arriving on-site to perform scheduled bi-annual preventative maintenance. Upon arrival at the station to perform maintenance services or on response to a telephone request for maintenance by an authorized GRECC employee of the Durham VAMC, the contractor shall check in with Engineering Service prior to performing preventative maintenance or emergency services during normal working hours, 8:00am, to 4:30pm, Monday through Friday. |
| R17 | Contractor shall maintain on-site records of all preventative maintenance conducted and any corrective actions taken.B.3 |
| R18 | Contractor shall perform repairs at the time of scheduled bi-annual preventative maintenance. Contractor shall notify the Contracting Officer Technical Representative (COTR) of the repairs needed and if contractor has necessary parts and equipment available then repairs shall be done as long as they do not go over the Government NTE amount of $3,000.00. If repairs will exceed the Government NTE amount of $3,000.00 then contract will need the approval of the Contracting Officer (CO) before any repairs can be done.B.3 |
| R19 | If repairs cannot be done during the scheduled bi-annual preventative maintenance contractor shall coordinate and schedule date and time to repair equipment with an authorized Durham VAMC GRECC lab personnel.B.3 |
| R20 | Contractor shall preform repairs during normal working hours, 8:00am, to 4:30pm, Monday through Friday. In the event that equipment needs repair outside of normal business hours contractor shall be available to provide repairs on the weekend and on Federal Holidays as necessary.B.3 |
| R21 | Contractor shall also provide repairs centrifuge and included instruments to correct malfunctions on an as needed basis to restore equipment to fully operational. In the event that equipment malfunctions or is in need of repair outside of the scheduled bi-annual preventative maintenance services contractor shall coordinate with the COTR to schedule an inspect of the equipment and perform repairs to restore equipment to fully operational status.B.3 |
| R22 | Contractor personnel shall perform repairs to centrifuge and included instruments at the time of discovery if all parts, tools, materials, and equipment are available and it does not exceed the Government Not-to-Exceed amount of $3,000.00.B.3 |
| R23 | Centrifuge and included instruments may need repair in the event of malfunctions outside of the scheduled bi-annual preventative maintenance schedule and contractor shall be available to coordinate with authorized GREEC staff to repair equipment.B.3 |
| R24 | Repairs performed to centrifuge and included instruments shall include the cost of any parts and labor needed to complete the service and shall not exceed the bi-annual Government Not-to-Exceed amount of $3,000.00. If the repair cost will exceed the Government NTE amount of $3,000.00 the contractor must obtain approval from the CO before any repair work or corrective action(s) and/or repairs can be performed.B.3 |
| R25 | Contractor shall provide and maintain on-site records of all repairs, emergency repairs, and preventative maintenance conducted and any corrective action(s) (if any) taken.B.3 |
| R26 | Contractor shall respond to telephone calls for emergency repairs within two hours.B.3 |
| R27 | Contractor shall send a trained and certified Field Service Engineer (FSE). The FSE must be on-site within 24 hours of an emergency service call initiated during normal business hours of 8:00am-4:30pm, Monday through Friday, to include weekends and federal holidays.B.3 |
| R28 | For emergency calls outside normal business hours, the contractor shall check in with Operations at the Boiler Plant, building 7, and coordinate with the appropriate Engineering representative.B.3 |
| R29 | Contractor shall provide emergency on-site repair services and perform repairs if they do not to exceed the Government Not-to-Exceed amount or $3,000.00 for service, parts, and labor. If the Government Not-to-Exceed amount has been used for year and the repair cost goes above the $3,000.00 limit, the contractor will need the Contracting Officer's approval before any work is to be performed to provide emergency repair to equipment.B.3 |
| R30 | All work to be performed by contractor shall be performed by competent personnel experienced and qualified to work on the specific equipment listed on the schedule in accordance with the manufacturers practices.B.3 |
| R31 | All maintenance shall be performed in accordance with the standard manufacturing practices and original equipment manufacturer (OEM) standards.B.3 |
| R32 | The contractor shall submit emergency repair proposals that specially identify all cost and cost components involved for the specific repair, The proposal shall reflect in detail any discounts offered by the contractor.B.3 |
| R33 | The contractor shall provide all transportation, lodging, labor, tools, and materials required to complete the work defined in this SOW. No additional charges outside those specified in the contract shall be billed to the VA.B.3 |
| R34 | Contractor shall wear a uniforms that clearly identify the company and employee in a professional manner to all staff, patients, and visitors of the GRECC.B.3 |
| R35 | all contract employees must present photo identification and provide advanced notice from the requiring service to obtain a VA badge.B.3 |
| R36 | If a contractor employee is identified as a provider in a tort claim, the employee must notify the contractor's legal counsel and/or insurance carrier.B.3 |
| R37 | The Contractor shall communicate with the CO on all matters pertaining to contract administration.B.3 |
| R38 | Contractor shall comply and any documentation generated by maintenance, purchases, or purchase of equipment must be kept accordingly per RCS10-1 Maintenance, Item 5020.7 Facility, space, and equipment inspection, maintenance, and service records.B.3 |
| R39 | Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a).B.3 |
| R40 | In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.B.3 |
| R41 | Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity.B.3 |
| R42 | In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency].B.3 |
| R43 | The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment.B.3 |
| R44 | The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected.B.3 |
| R45 | The Contractor shall not remove material form Government facilities or systems, or facilities or systems operated or maintained on the Government's behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle].B.3 |
| R46 | The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contract) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified and controlled unclassified information.B.3 |
| R47 | The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.B.3 |
| R48 | The Contractor shall not create or maintain any records containing any non-public [Agency] information that are not specifically tied to or authorized by the contract.B.3 |
| R49 | The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption of the Freedom of Information Act.B.3 |
| R50 | Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.B.3 |
| R51 | All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take The Durham VA Medical Center-provided records management training. The Contractor is responsible for confirming training has been completed according to the agency policies, including initial training and any annual or refresher training.B.3 |
| R52 | Contractor shall submit all invoices electronically and must contain the obligation number.B.4 |
| R53 | The contractor shall submit invoices upon completion of work in arrears covering the services performed under this contract. The invoices shall include at a minimum the following information: • Date of invoice • Contract Number • Purchase Order Number • Vendor Name • Invoice Number • CLIN or Line Items • Date of ServiceB.4 |
| R54 | Mandatory written disclosures required by FAR clause 52.203- 13 to the Department of Veterans Affairs, Office of Inspector General (OIG) must be made electronically through the VA OIG Hotline at http://www.va.gov/oig/contacts/hotline.asp and clicking on "FA R clause 52.203 -13 Reporting."B.4 |
| R55 | Contractor is required to wear I.D. badge during the entire time he/she is on VAMC grounds. I.D. badges MUST have an identification picture and shall be issued by VAMC.B.4 |
| R56 | The contractor should contact the GRECC at (919)286-6932 to confirm the date and time of arrival for servicing the centrifuges. Upon arrival, please call (919)286-6932, and the COR or GRECC staff will escort the contractor to the laboratory in room N3003.B.4 |
| R57 | All VHA health care facilities (including CBOCs and HCCs) are smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019. The policy applies to cigarettes, cigars, pipes, or any other combustion of tobacco, including but not limited to electronic or e-cigarettes, vape pens or e-cigars.B.4 |
| R58 | The Contractor will not engage in any racially discriminatory DEI activities;Section C (statement of work) |
| R59 | The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;Section C (statement of work) |
| R60 | The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer;Section C (statement of work) |
| R61 | The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.Section C (statement of work) |
| R62 | The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.Section C (statement of work) |
| R63 | Quoters shall submit a written Technical proposal that demonstrates the ability to fully perform the requirements as outlined in the performance work statement. The technical proposal must be submitted as a single, combined document, titled “Technical Capability”, in a searchable PDF format with sequentially numbered pages.E.1 |
| R64 | The Technical Proposal must address, at a minimum, the following areas: a. Technical Capabilities-the quote should be detailed as necessary to fully explain the proposed methods and rationale; it should reflect clear understanding of the nature of the ork being undertaken. • The technical quote shall include information on how the work is to be organized, staffed, and managed. • Identify all material and supplies used to perform services. • Provide qualified and certified technicians to accomplish the work. b. Management Approach • Provide an experienced site manager/supervisor to oversee work. • Establish and implement Quality Inspection plan. • Management approach to problem resolution.E.1 |
| R65 | Quoters shall submit a narrative describing their specific past performance providing preventative maintenance on Beckman Models (J2-21M Superspeed centrifuge, L8-80 Ultra centrifuge, GPR centrifuge), Eppendorf Models (Refrigerated centrifuge, Refrigerated Microcentrifuge, and Lab-Line Incubator/Shaker Model equipment or similar to the services required in this solicitation. The Past Performance proposal must be submitted as a separate, single document, titled “Past Performance”, in a searchable PDF format with sequentially numbered pages.E.1 |
| R66 | Provide up to three (3) relevant contracts performed withing the last five (5) years that demonstrate your company's ability to perform these services successfully. For each reference, include the following information: a. Contract number b. Description of specific tasks performed c. Geographic location of contract performance d. Dates of contract performance e. Indicate if the referenced contract was performed by the Quoter or a proposed subcontractor f. State if the Quoter or subcontractor was the prime contractor or a subcontractor g. Name, phone number, and email address of a point of contact who verify contract performanceE.1 |
| R67 | Pricing shall be submitted as requested in section B.2 Price/Cost schedule of this solicitation document.E.1 |
| R68 | Responses to provisions that require Quoter completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)), Quoters are required to have an active Federal Government contracts registration in SAM when they submit a quote and at the time of award;E.1 |
| R69 | Failure to comply with these instructions and provide all requested documents will result in quotes being rejected without further evaluation.E.1 |
| R70 | Questions pertaining to this solicitation shall be emailed to Monique Cordero at Monique.Cordero@va.gov by 11/05/2026 at 10:00am EST.E.1 |
| R71 | The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.E.2 |
| R72 | The offeror represents as part of its offer that— (i) It [ ] is, [ ] is not a small business concern; or (ii) It [ ] is, [ ] is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b).E.2 |
| R73 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant:E.2 |
| R74 | Unless a waiver or exception applies, the Contractor is prohibited from providing any products or services to the Government or using in the performance of the contract any of the following: (1) A covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract... (2) A Kaspersky Lab-covered article... (3) Covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any systemE.2 |
| R75 | The Contractor is prohibited from— (i) Delivering any FASC-prohibited unmanned aircraft system... (ii) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract... and (iii) On or after December 22, 2025, using Federal funds to procure or operate a FASC-prohibited unmanned aircraft systemE.2 |
| R76 | Unless an applicable waiver has been issued by the Government, the Contractor cannot use any equipment, systems, or services that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any systemE.2 |
| R77 | Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC's implementing regulations at 31 CFR chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States.E.2 |
| R78 | The Contractor is prohibited from conducting any restricted business operations in Sudan in accordance with Accountability and Divestment Act of 2007 (Pub. L. 110-174).E.2 |
| R79 | Unless an exception applies or the Government grants a waiver, contractors are prohibited from knowingly engaging in any significant transaction (i.e., over $15,000) with Iran's Revolutionary Guard Corps or any of its officials, agents, or affiliatesE.2 |
| R80 | Unless the Government has issued an applicable waiver, contractors shall not provide or use as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA orderE.2 |
| R81 | The contractor shall conduct a reasonable inquiry to determine if there are any prohibited products or services.E.2 |
| R82 | If the Contractor identifies or is notified by any source, (including a subcontractor at any tier), that any product or service provided or used (or to be provided or used) during contract performance does not comply with any prohibition in this clause, then the Contractor shall report the following information, or as much information is known, in writing to the contracting office as identified in paragraph (h)(2) within 72 hours:E.2 |
| R83 | During contract performance, the Contractor shall review SAM at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (e) of this clause.E.2 |
| R84 | The Contractor shall insert the substance of this clause, including this paragraph (j) but excluding subparagraphs (d)(1) and (i)(1), in all subcontracts and other contractual instruments, including subcontracts for acquiring commercial products or commercial services.E.2 |
| R85 | For Emergency Services CLINs 0011, 1011, 2011, 3011, and 4011, vendors shall enter an hourly labor rate that includes the cost of parts.E.2 |
| R86 | For Repair Services CLINs 0010, 1010, 2010, 3010, and 4010, vendors shall enter an hourly labor rate that includes the cost of parts. The Government has established an annual Not-to-Exceed (NTE) amount of $3,000.00 for these CLINs. The total amount invoiced under each Repair Services CLIN shall not exceed the annual NTE amount of $3,000.00.E.2 |
Recent awards in NAICS 811210
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-18 | SPECTRUM MEDICAL INCDepartment of Veterans Affairs · QUANTUM HEATER COOLER SERVICE | $22,372 |
| 2027-03-15 | IRIDEX CORPDepartment of Veterans Affairs · IRIDEX LASER MAINT-BASE YEAR-HAMPTON,VA | $11,790 |
| 2027-02-01 | STRYKER SALES, LLCDepartment of Veterans Affairs · ORDERING PERIOD 4 NEPTUNE ROVER AND DOCKING STATION MAINTENANCE FOR IRON MT VAMC | $7,182 |
| 2027-02-01 | STRYKER SALES, LLCDepartment of Veterans Affairs · ORDERING PERIOD 4 NEPTUNE ROVER AND DOCKING STATION MAINTENANCE AT MILWAUKEE VAMC | $74,215 |
| 2027-02-01 | STRYKER SALES, LLCDepartment of Veterans Affairs · ORDERING PERIOD 4 NEPTUNE ROVER AND DOCKING STATION MAINTENANCE FOR DANVILLE VA HOSPITAL | $14,364 |
| 2027-02-01 | STRYKER SALES, LLCDepartment of Veterans Affairs · TASK ORDER 4 NEPTUNE ROVER AND DOCKING STATION MAINTENANCE FOR JBVAMC | $50,275 |
Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.