Increase Emergency Power: requirements and submission rules

48 requirements and 2 submission rules found in the solicitation documents for 36C24126Q0707. Use them as the start of your compliance matrix.

Solicitation number
36C24126Q0707
Agency
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 241-NETWORK CONTRACT OFFICE 01 (36C241)
NAICS
236220
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Responses due
18 December 2026 (20 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Contractor shall submit all required product samples, manufacturer’s literature, data, and material/shop-drawing submittals to the Contracting Officer within 10 calendar days of the Notice to Proceed (NTP) being issued, or as agreed to by the Contracting Officer for approval.
  • Material submittals and shop drawings shall be checked and signed by the Contractor’s Quality Control Manager prior to submission to the Government.

Requirements

IDRequirement
R1The engine generator system shall be in accordance with ASTM, ISO, NEMA, NFPA, UL, as shown on the drawings, as described in contract specifications, and shall conform to NFPA 99 and NFPA 110 requirements for Level 1 systems.
R2Parameter schedule – Power Rating: Emergency Standby; Voltage: 277/480V; Rated Power: 600 kW 750 kVA continuous); Power Factor: 0.8 lagging; Engine Generator Application: parallel with other engine generators and a utility source; Fuel: diesel; Voltage Regulation: + 2% (maximum) (No Load to Full Load) (standalone applications); Phases: 3 Phase, Wye
R3Each component of the engine generator system shall be capable of operating at 30.48 meters (100 feet) above sea level in a ventilated room which will have average ambient air temperatures ranging from a minimum of 32 °F in winter to maximum of 80 °F in summer.
R4Factory-mounted on a common, rigid, welded, structural steel base.
R5Engine generator shall be statically and dynamically balanced so that the maximum vibration in the horizontal, vertical, and axial directions shall be limited to 0.15 mm (0.0059 inch), with an overall velocity limit of 24 mm/sec (0.866 inch per second) RMS, for all speeds.
R6The isolators shall be constrained with restraints capable of withstanding static forces in any direction equal to twice the weight of the supported equipment.
R7Shall be capable of operating satisfactorily as specified for not fewer than 10,000 hours between major overhauls.
R8Each engine generator specified for parallel operation shall be configured for automatic parallel operation.
R9The engine shall be coupled directly to a generator.
R10Minimum four cylinders.
R11The engine shall be able to start in a 4.5 ˚C (40 ˚F) ambient temperature while using No. 2 diesel fuel oil without the use of starting aids such as glow plugs and ether injections.
R12The engine shall be equipped with electric heater for maintaining the coolant temperature between 32-38 °C (90-100 °F), or as recommended by the manufacturer.
R13Install thermostatic controls, contactors, and circuit breaker protected circuits for the heaters.
R14The heaters shall operate continuously except while the engine is operating, or the water temperature is at the predetermined level.
R15Contractor shall furnish all labor, equipment, certifications, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the Contract plans and Specifications, and all other supporting documents for this contract to include, but not limited to the following documents: Refer to Section D for list of attachments.B.3
R16Add two (2) diesel generators with paralleling capability and the associated distribution equipment with the adequate capacity to accommodate future additions and renovations to the hospital. The new generators are to be located in the vicinity of parking lot 8, with the distribution and control equipment located in the mechanical room in the basement of Building 1.B.4
R17Two (2) electrical duct banks, combined in a single trench, will be required from the new Control Building. The dual duct bank in the single trench will turn toward Building 1 A-Wing just south of the existing utility boxes concrete pad and then turn north. The duct banks will then split in order for the normal power to the electrical room to enter the southeastern side of E-Wing Building 1 and the new power to serve the new panels will enter the basement of A-Wing Building 1. An electrical conduit will be required from the new Emergency Generator Control Building to Building T18.B.4
R18The construction shall conform to Department of Veterans Affairs design manuals and technical specifications, as well as all applicable codes.B.4
R19All design and construction accomplished pursuant to this contract shall comply with the latest editions of established standards. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.B.5
R20Contractor/vendor shall obtain all data necessary to prepare construction documents required. The Contractor shall confirm all existing conditions and field verify any document provided by the VA. The Contractor is wholly responsible for both the accuracy and the level of completeness of the final product. Failure to verify information is not acceptable.B.5
R21Where different specifications require different considerations for the same item of work, the more restrictive specification will have precedence and will be followed regardless of the specification publisher.B.5
R22All materials and workmanship shall comply with the codes and standards adopted by the VA. All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the COR and CO.B.5
R23All work is expected to be performed generally during normal hours of coverage unless approved by the COR or his/her designee.B.6
R24Work that disrupts hospital operations shall be coordinated and performed off hours. This includes utility shut down, work with excessive noise/vibrations, odors, dust, etc. Coordinate with the COR for approval. Off-hours work will be at no additional costs to the Government.B.6
R25Before commencement of work, the Contractor shall confer with the COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.B.6
R26Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.B.6
R27It is the responsibility of the Contractor to park in the appropriate designated parking areas. Parking of privately-owned vehicles by contractor personnel is prohibited on the hospital campus and is only allowed at the Davis Park location off Chalkstone Avenue. Parking in designated patient parking areas is strictly prohibited. Parking on grass is also prohibited. Parking for equipment necessary to perform the work will be authorized in advance of starting the project. Parking passes will be issued by the VA Police. Parking by contractors will be regulated in accordance with Providence VAMC Policy Memorandum 07B-3 entitled Registration of Privately Owned Vehicles.B.7
R28All contractor personnel shall obtain a short-term identification badge issued by the Project Manager. Such badge shall be worn by the individual and prominently displayed at all times while on VA property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. In order to obtain a short-term identification badge, contractor personnel shall present to the Project Manager a valid (non-expired) photo identification issued by a US federal, state or local government agency. All contractor personnel are subject to inspection of personal effects when entering or leaving the project site.B.7
R29Smoking is strictly prohibited anywhere on the VAHC facilities. To include the main facility and any other buildings within the premises.B.7
R30Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to searches in accordance with the law.B.7
R31Commencement of work shall begin within 10 calendar days after receipt of a written Notice to Proceed (NTP) and should last no longer than a duration of 630 calendar days after the issuance of the Notice to Proceed (NTP).B.9
R32Contractors will utilize the ‘Material Approval Submittal’ form for use as a cover sheet when submitting to Government for approval.B.10
R33Contractor shall pay specific attention to ensure timely submission of all submittals covering the materials listed here that will be installed in this project: Project Schedule, Construction Materials, Electrical Construction Materials, Telephone & Data Materials, Paint, Control Booth Partition, Infection Control Plan (including dust/infection control barrier drawings), Safety and Interim Life Safety Plan, Waste Management PlanB.10
R34All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated on them.B.10
R35Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes. The submittals will come with certification from the contractor/installer that the system specified meets all identified code and insurance requirements as required by the Government. Submittals will also come with all Material Safety Data Sheets (MSDS) for all materials to be used in the construction portion of this project.B.10
R36Upon completion of construction work, and before submitting invoice for final payment, contractor will provide the COR with the following: Operation and Maintenance Manuals for new equipment, As-built drawingsB.10
R37The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises.B.11
R38Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.B.6
R39The contractor shall attend no less than monthly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes will be forwarded to the Contracting Officer. In the event of any discrepancies the Contracting Officer will be notified immediately for clarification. Contractor will use the Meeting Minutes form provided for use at the post-award, pre-construction conference.B.11
R40Modifications for this project must be submitted to the assigned COR who will then submit a formal request to the Contracting Officer (CO) or acting Contract Specialist (CS). New work is not allowed to commence prior to Contracting Officer’s signed and written approval via a fully executed Standard Form (SF) 30 modification.B.12
R41Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.B.13
R42Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.B.13
R43Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.B.13
R44Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.B.13
R45Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.B.13
R46Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].B.13
R47No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.B.13
R48Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.B.13

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-12-08LC FLUHARTY CONSTRUCTION LLCDepartment of Veterans Affairs · PROJECT 541-19-101 RENOVATE OPERATING ROOM - VAMC CLEVELAND EO 14398$14.85 million
2026-11-30KMK CONSTRUCTION, INCDepartment of Veterans Affairs · 631-26-012 TRANSFORMER REPLACEMENT.$1.48 million
2026-11-30HIRT ELECTRIC, LLCDepartment of Veterans Affairs · HQ GUIDANCE - COMMERCIAL CLAUSES FOR OPEN MARKET CONSTRUCTION & A/E$244,400
2026-11-24U.S. VET GENERAL CONTRACTING, LLCDepartment of Veterans Affairs · TASK ORDER FOR FACILITY CONDITION IMPROVEMENTS UNDER THE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR THE WM S. MIDDLETON VA HOSPITAL, MADISON WISCONSIN.$2.58 million
2026-11-23TBI PAYNE JV, LLCDepartment of Veterans Affairs · UPGRADE HEINZ FIRE ALARMS$242,600
2026-11-23U.S. VET GENERAL CONTRACTING, LLCDepartment of Veterans Affairs · TASK ORDER #13 FOR 3YR PMI UNDER THE CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR THE WM S. MIDDLETON VA HOSPITAL, MADISON WISCONSIN.$2.15 million

Source: USAspending.gov, retrieved 2026-11-05. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.