Y1JZ--Indefinite Delivery Indefinite Quantity (IDIQ) Design-Build & Construction Multiple Award Task Order Contract (MATOC) National VA Healthcare Construction Program: requirements and submission rules
18 requirements and 3 submission rules found in the solicitation documents for 36C10F27R0003. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Offerors shall meet all solicitation requirements, such as terms and conditions, representations and certifications, and other instructions identified within the solicitation.
- Contractors must adhere to established submittal processes with specified review periods for shop drawings, samples, and technical documentation.
- All information must match the signed Teaming Agreements submitted in Volume II.
Requirements
| ID | Requirement |
|---|---|
| R1 | The Government will only award a contract to an Offeror who is determined responsible in accordance with FAR 9.104-1 and whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by this solicitation).Section M (evaluation factors) |
| R2 | For the Unrestricted portion of the solicitation, other-than-small-business Offerors must also submit an acceptable Small Business Subcontracting Plan.Section M (evaluation factors) |
| R3 | If an individual contractor (to include teaming partners) competes more than three times under the SDVOSB Pools or more than once under the Unrestricted portion, the Government may reach out to clarify which proposal that individual contractor (to include teaming partners) wants the Government to consider. If the contractor does not respond within the designated time, they will be removed from the competition.Section M (evaluation factors) |
| R4 | To be determined responsible, an Offeror shall meet the general standards described in FAR 9.104-1.Section M (evaluation factors) |
| R5 | Additionally, the Government will reach out to the Financial Institution identified in Appendix L-01, Offeror Company Information, to request a Banking Status Inquiry. The Banking Status Inquiry will not be evaluated as part of the technical and price proposal; however, its evaluation is required to determine contractor responsibility prior to award.Section M (evaluation factors) |
| R6 | The Government will evaluate the information provided IAW Section L, paragraph 2.3.3.2., to determine whether an Offeror has the bonding capacity to perform under the SDVOSB Pools, if proposing under the SDVOSB Set Aside, or under the unrestricted, if proposing under the unrestricted. Offerors who cannot comply with the requirements set forth in Section L paragraph 2.3.4.3 will not be considered for award and will be removed from the competition.Section M (evaluation factors) |
| R7 | An Offeror’s actual or potential OCI concerns must be avoided, mitigated, or neutralized before that Offeror may receive an award of this contract.Section M (evaluation factors) |
| R8 | For purposes of this solicitation, Offerors shall complete the self-scoring requirements based on the objective criteria described in Section L, Instructions, Conditions, and Notices to Offerors or Respondents.Section M (evaluation factors) |
| R9 | The Government will evaluate past performance on a strict Pass/Fail basis to assess the contractor’s historical record of operational success, quality of work, and performance trends. Offeror proposals will be initially reviewed and verified based on the qualitative adjectival ratings (e.g., Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory) recorded in the Appendix L-05 submission.Section M (evaluation factors) |
| R10 | Only other than small business offerors shall provide a Small Business Subcontracting Plan IAW FAR 52.219-9 Alternate II, FAR 52.219-8 Utilization of Small Business Concerns, VAAR 852.219-70 Small Business Subcontracting Plan Minimum Requirements. The Small Business Subcontracting Plan will be assessed and must meet the FAR and VAAR requirements prior to award of a contract. If small business subcontract possibilities do not exist or are limited, the Offeror’s plan must state such and provide rationale supporting the assertion.Section M (evaluation factors) |
| R11 | Offerors are required to price the base and all option CLINs. Offerors shall not submit additional rates for the potential six-month extension of services period. Instead, the rates from the last one-year option period will be utilized for the FAR 52.217-8 Option.Section M (evaluation factors) |
| R12 | The Offeror shall ensure they have provided all pricing information required by the solicitation. The Government will evaluate the completeness of the Offeror’s IDIQ Labor Rate Pricing. A $0.00 bid in a labor category, an omitted rate or other missing price information may result in the Government determining the price proposal to be incomplete.Section M (evaluation factors) |
| R13 | The contractor shall provide integrated design and construction services under DB task orders. For DB projects, contractors must demonstrate design management capability through dedicated design managers with healthcare facility experience, when applicable. Design requirements include Building Information Modeling (BIM) execution at Level of Development (LOD) 300 minimum, coordination of medical equipment planning, and integration of facility requirements. The contractor must maintain in-house or consultant architectural/engineering capability throughout contract performance.Section M (evaluation factors) |
| R14 | Design reviews shall be conducted at concept (35%), design development (65%), and construction documents with government acceptance required at each stage. The contractor is responsible for design quality control including peer reviews, constructability reviews, and interdisciplinary coordination.Section M (evaluation factors) |
| R15 | For DBB task orders, the contractor shall execute construction from government-furnished 100% construction documents. The contractor must demonstrate capabilities in constructability review, value engineering when requested, and construction coordination. While design services are excluded, the contractor shall maintain technical capability to review and validate design documents, recommend improvements, and coordinate resolution of design issues during construction. The contractor is responsible for identifying conflicts or issues in furnished documents prior to construction commencement.Section M (evaluation factors) |
| R16 | For both delivery methods, the contractor shall: Maintain dedicated project management teams with relevant healthcare construction experience; Implement quality control programs specific to healthcare facilities; Provide construction scheduling demonstrating critical path and resource loading; Execute stakeholder coordination including medical center operations; Maintain safety programs meeting Occupational Safety and Health Administration OSHA) and VA standards; Implement infection control and interim life safety measures; Coordinate furniture, fixtures, and equipment (FF&E) to include medical equipment installation and utilities; Document control and management systems for all project records; Provide monthly progress reports including earned value analysis; Maintain environmental compliance programs; Execute commissioning support activitiesSection M (evaluation factors) |
| R17 | All Offerors must be able to provide all required personnel, facilities, equipment, and materials for multiple and concurrent task orders within the respective pools across the United States and its territories. Offerors shall maintain dedicated Quality Control(QC) personnel and implement comprehensive QC programs including inspection protocols, testing procedures, and documentation systems. Safety programs must be led by qualified Safety Officers with OSHA certifications, supported by site-specific safety plans, training programs, and incident reporting procedures. The awardees shall ensure that all activities performed by its personnel, subcontractors, and suppliers are executed in compliance with all applicable environmental and safety laws and regulations, including implementation of environmental protection plans addressing waste management, erosion control, and pollution prevention. Contractors must utilize specified project management and collaboration platforms, maintaining compatibility with VA systems for document control, scheduling, and reporting. Subcontractor management requirements include prequalification processes, performance monitoring, and compliance verification for all quality, safety, and environmental standards. Personnel requiring access to VA facilities must obtain and maintain appropriate security clearances in accordance with VA security protocols.Section M (evaluation factors) |
| R18 | All work under this contract shall be performed in active medical center environments requiring specialized planning and execution to maintain continuous patient care operations. The contractor shall coordinate and execute all construction activities to minimize disruption to medical center operations through the following requirements: Infection Control Risk Assessment (ICRA) and Prevention... Interim Life Safety Measures (ILSM)... Utility Systems and Service Continuity... Operational Coordination... Department-Specific Requirements... Documentation and Reporting... The contractor shall immediately notify the Contracting Officer and medical center leadership of any construction activities that could potentially impact patient care or staff safety.Section M (evaluation factors) |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Veterans Affairs, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-02-15 | MONUMENT CONSTRUCTION SERVICES, LLCDepartment of Veterans Affairs · 402-26-REPAVE SOUTHGATE ROAD AT TOGUS VAMC. | $734,500 |
| 2026-12-14 | ARMCORP CONSTRUCTION INCDepartment of Veterans Affairs · RENOVATE 6S FOR INPATIENT MENTAL HEALTH | $8.76 million |
| 2026-12-08 | LC FLUHARTY CONSTRUCTION LLCDepartment of Veterans Affairs · PROJECT 541-19-101 RENOVATE OPERATING ROOM - VAMC CLEVELAND EO 14398 | $14.85 million |
| 2026-12-01 | MONUMENT CONSTRUCTION SERVICES, LLCDepartment of Veterans Affairs · 523A4-27-003 EXTERIOR SITE IMPROVEMENTS | $318,296 |
| 2026-11-30 | KMK CONSTRUCTION, INCDepartment of Veterans Affairs · 631-26-012 TRANSFORMER REPLACEMENT. | $1.48 million |
| 2026-11-30 | HIRT ELECTRIC, LLCDepartment of Veterans Affairs · HQ GUIDANCE - COMMERCIAL CLAUSES FOR OPEN MARKET CONSTRUCTION & A/E | $244,400 |
Source: USAspending.gov, retrieved 2026-11-16. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.