Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park: requirements and submission rules
50 requirements and 15 submission rules found in the solicitation documents for 33330226RT0010015. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Requests for Clarification Offerors requiring technical clarifications shall submit all requests in writing, by email to chanvc@si.edu no later than September 30, 2026.
- The Contractor shall submit to the COTR daily time and material tickets, to include the identification Phase 2 - Construct Arabian Leopard 33330226RT0010015 Page 73 of 139
- Acknowledgement of SF30 Amendments of Solicitation (if any) PRICING PROPOSAL DOCUMENT SHALL BE SUBMITTED IN A SEPARATE PDF FILE.
- Upload these documents to Dropbox using the provided link: https://www.dropbox.com/request/WjDoOyI1YLjWVLZVx4SD THE PROPOSAL DUE DATE IS FRIDAY, NOVEMBER 13, 2026, AT 3:00 PM EASTERN STANDARD TIME The North American Industry Classification Code (NAICS) for this procurement is 236220 and the size standard under this code is $45 million average annual receipts over the last three years.
- Offerors should not anticipate an extension of the proposal due date.
- Completed proposals must be received at the above Dropbox link no later than 3PM Eastern Standard Time, Friday, November 13, 2026.
- Prime Contractor Firm Name: Solicitation No.: 330226RT0010015 Location: Washington, DC Project: Construct Arabian Leopard Facility (ALF) Due Date: Nov.
- ACKNOWLEDGEMENT OF AMENDMENTS OFFER (Must be fully completed by offeror) (The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) AMENDMENT NO.
- (OCT 1997) (a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed.
- Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
- Completed Representations and Certifications (Section K) All pricing forms shall be completed in their entirety and submitted as part of the Offeror’s Price Proposal.
- However, any marketing or promotional programs concerning the Smithsonian or the Project shall be submitted to the Smithsonian for review and approval prior to any implementation thereof.
- (3) The Contractor may not require the use of SAM for the purposes of representing size or socioeconomic status in connection with a subcontract.
- Use of SAM as its source list does not relieve a firm of its responsibilities (e.g., outreach, assistance, counseling, or publicizing subcontracting opportunities) in this clause.
- The records shall include at least the following (on a plant-wide or company-wide basis, unless otherwise indicated): (i) Source lists (e.g., SAM), guides, and other data that identify small business and service-disabled veteran-owned small business concerns.
Requirements
| ID | Requirement |
|---|---|
| R1 | Offers will only be accepted from these prequalified firms: Grunley 15020 Shady Grove Road, Suite 500 Rockville, MD 20850 Consigli 1825 K Street, Suite 1000 Washington, DC 20006 The Whiting-Turner Contracting Company 4600 River Road, Suite 200 College Park, MD 20737Section J |
| R2 | Offerors must confirm their participation in the site tour with Virginia Chan at ChanVC@si.edu and with the COTR, Ryan Swanier, at SwanierR@si.edu.Section J |
| R3 | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . |
| R4 | Submit proposals in PDF format as follows: one PDF for the Technical proposal, one PDF for the Cost proposal, and one PDF for the Subcontracting Plan. Upload these documents to Dropbox using the provided link: https://www.dropbox.com/request/WjDoOyI1YLjWVLZVx4SDSection J |
| R5 | Offerors are reminded that they must include in their Multi -year Funding Price proposal any termination cost in the event that subsequent year funds are not appropriated.Section B |
| R6 | Because funding for this project will be spread over two fiscal years, FY27, and FY28, the cost proposal is required to reflect the division of costs appropriately. Accordingly, each offeror is required to complete and submit the form below, which will be considered as a part of that offeror's Cost Proposal.Section B |
| R7 | Offerors shall identify all costs associated with Phase 2 of the NZP-DC: Construct Arabian Leopard Facility (ALF) project, to include Base Cost, as set forth in the Contract Documents. Offerors shall submit a Base Cost Proposal in accordance with the pricing forms provided in this solicitation.Section B |
| R8 | Contractor must submit approved Certificate of Insurance and 100% Performance/Payment Bonds within ten (10) days of contract award.C.2 |
| R9 | Contractor will not input or upload Smithsonian-provided content into any GenAI tools or applications that will use the content for purposes not essential to this Contract, including but not limited to training or scraping, without the Smithsonian's prior written approval.C.2 |
| R10 | The Contractor shall perform on the site, and with its own organization, work equivalent to at least 12% percent of the total amount of work to be performed under the contract.C.2 |
| R11 | The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.C.2 |
| R12 | By submission of its offer, the offeror certifies that the offeror does not conduct any restricted business operations in Sudan.C.2 |
| R13 | Offerors shall also provide this information in their technical proposal. [Key Personnel: NAME, LABOR CATEGORY]C.2 |
| R14 | The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable.C.2 |
| R15 | Offerors are required to submit complete technical and pricing proposals which are fully and clearly acceptable without additional explanation or informationC.2 |
| R16 | Offerors are required to pay hourly wages and fringe benefits issued by the US Department of Labor that comply with the Davis Bacon Act in accordance with FAR clause 52.222-6, Construction Wage Rate Requirements.C.2 |
| R17 | Proposals must be complete, independent, and respond directly to the requirements of this solicitation. They must also be clear, coherent, legible, and prepared in sufficient detail for effective evaluation by the Smithsonian. Proposals must be submitted on the forms furnished by the SI where provided.C.2 |
| R18 | If any pricing information is in the Technical Proposal, then the Offeror will be disqualified.C.2 |
| R19 | Provide a comprehensive Schedule of Values in accordance with the Cost Proposal and the Multi -Year Funding Document as contained in Attachment No. 5 of this solicitation, which includes all costs for Construction Phase services for Phase 2 – Habitats & Animal Care Building.C.2 |
| R20 | Subcontracting Plan shall include all information described in FAR 52.219-9 (d).C.2 |
| R21 | The successful Offeror shall submit with their proposal a Small Business and Small Disadvantaged Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7, statutory requirements and approval must be granted by the Office of Equal Opportunity (OEO) Public Laws 95-507, 99-661, 100-656, and Executive Order 13360. The plans shall provide comprehensive responses to the requirements of the clause entitled, "Small Business Subcontracting Plan (FAR 52.219-9). The plan, as a minimum, shall include a detailed discussion of the elements set forth in FAR Clause 52.219- 9(d)(1) through (11) as it relates to small business and service-disabled veteran owned small business concerns.C.2 |
| R22 | the proposed subcontract plan must demonstrate clear and concise knowledge and understanding of statutory requirements and regulations as it relates to Small Business and Service-disabled Small Business.C.2 |
| R23 | The proposed plan shall address efforts to broaden Small Business and Service -disabled Small Business vendor base, outreach efforts, description of supplies and services to be subcontracted, identification of proposed firms who will be utilized, intended value to be subcontracted and percentage goals for the basic contract and each option year, (if any), which are realistic yet which are realistic yet challenging. Past performance and goal achievement for past performance shall be addressed.C.2 |
| R24 | The Technical Proposal should be indexed into sections and tabbed as indicated for each requirement of this proposal as follows: Factor 1 – Contractor's Ability to Provide Construction Services • Tab No. 01 – Plan for Construction Services • Tab No. 02 – Management, Conveying and Directing Recommendations • Tab No. 03 – List of Anticipated Major Subcontractors • Tab No. 04 – Approach to Project Control and Coordination • Tab No. 05 – Site Coordination Plan • Tab No. 06 – Innovative ideas and Creative Solutions Factor 2 – Contractor's Key Personnel and Support Team Qualifications • Tab No. 07 – Staffing Plan • Tab No. 08 – Organization Plan • Tab No. 09 – Resumes • Tab No. 10 – Site Safety and QC Personnel Factor 3 – Contractor's Ability to Provide Cost Control • Tab No. 11 – Cost Control Methods Factor 4 – Contractor's Ability to Meet Schedules. • Tab No. 12 - List of Critical Long Lead Items & Associated Risk-Mitigation Strategy • Tab No. 13 – Development, Maintenance and Updating the Project Schedule • Tab No. 14 – CPM Summary Schedule • Tab No. 15 – Sample Monthly Schedule Report Factor 5 – Contractor's Plan for Quality Assurance/ Quality Control and Use of Best Practices • Tab No. 16 – Project Specific Construction Quality Control (CQC) Plan Factor 6 – Contractor's Plan for Use of Technology • Tab No. 17 – Experience with Building Information Modeling (BIM) • Tab No. 18 – Other Innovative TechnologiesC.2 |
| R25 | Describe in detail your plan to provide Construction Services for this project. Include, but do not limit your description to the following: • On-site staffing plan and contractor performed work throughout the course of the project. • Management and coordination of Architect's Supplemental Instructions (ASIs) and other post-award design clarifications, including identification and timely notification of potential impacts to the firm-fixed contract price or schedule. • Change order review process and the team structure you will use.C.2 |
| R26 | Describe your plan for managing and coordinating major subcontractors and consultants during constr uction, including maintaining continuity of key subcontractors throughout the project. Describe your approach to obtaining qualified subcontractors for changed or additional work not included in an existing subcontract, including how you maintain price competition when practicable. Include your procedures for evaluating and qualifying subcontractors.C.2 |
| R27 | Describe in detail how you will manage, convey, and direct recommendations to meet the Smithsonian goals of schedule, cost, and quality through your participation as a team member with the Smithsonian Institution (SI), Architect/Engineer (A/E), and both SI's Third Party Estimator and Commissioning Agent (CxA).C.2 |
| R28 | Address your approach to Project Control and Coordination by providing a procedural and administrative plan for progress reporting; cost accounting; shop drawings and product submittals; controls; security; visitor and worker access and egress; equipment and materials storage, and; staging.C.2 |
| R29 | Provide a Site Coordination Plan.C.2 |
| R30 | Describe in detail your project specific innovative ideas and creative solutions. Specify how you will implement those ideas for this project to distinguish your firm. Include, but do not limit your response to the following: • Site logistics, construction sequencing, scheduling, cost, long lead items, early site packages, fast tracking, etc. that may help reduce the anticipated 19 month / 578 day construction duration. • Recommendations for constructing critical building elements, early material delivery, mechanical, electrical, and plumbing solutions. • Promotion of a collaborative atmosphere within the project team.C.2 |
| R31 | Describe in detail your staffing plan for the delivery of Construction Services for this project. Identify key subcontractors (site / civil, structural, mechanical, electrical, plumbing, animal containment / transfer chutes & doors, and shotcrete faux rock), key consultants if any, that are included as part of the proposed team, their role and related experience for this Project. List projects for which the subcontractors and consultant(s) have worked with the Offeror. Greater consideration will be given to Offerors who have worked together with their proposed subcontractors and consultants. Identify additional staffing back-up and support for key members of your project team should additional staff be required.C.2 |
| R32 | Provide an Organization Plan describing the proposed organization for construction of the project. Include an organizational chart identifying lines of authority and supervisory responsibilities. Identify items of work to be performed by the prime contractor and their percentage of the total project. Identify major subcontractors including: Mechanical; Electrical; Plumbing; Site / Civil; Animal Containment / Transfer Chutes & Doors, and; Shotcrete Faux Rock and indicate how they fit into the organizational structure. For all projects listed in your organization plan, please include contract information such as dates, contract amount, and scope.C.2 |
| R33 | Provide a resume for each proposed Contractor's team members for Construction Services. Provide resumes of key personnel listing their specialized qualifications, special training and experience as outlined below and as it relates to work on a project of similar size and scope. Note experience on similarly sized projects accomplished in the Washington, DC area or a similar metropolitan setting. |
| R34 | Provide the name of subcontractors for each element of work listed below or indicate what work will be performed by the prime. You will be expected to use the subcontractor listed for each element of work, unless written approval for change is received from the Contracting Officer in accordance with the contract clause entitled SUBCONTRACTORS. Failure to indicate who will perform the work for each item below will result in lower scores during the evaluation of the proposal. For each named subcontractor, list three references with customer contact, address, email address, and telephone number.C.2 |
| R35 | All individual resumes shall be prepared in a consistent format and contain , the following: • Name, title, address, and telephone numbers. • Educational background. • Work experience covering the last five years and last five project assignments of significant duration (18 months or more). Clearly indicate the dates and role held on each project assignment. • Membership in professional societies. • Professional registrations, licenses, qualifications, and certifications. • Publications, awards or special achievements of a technical nature. • Length of time employed with current firm. • Role assigned on this project including duties and responsibilities. • Percentage of time available for this project.C.2 |
| R36 | Proposed minimum number of Site Safety Personnel.C.2 |
| R37 | Proposed minimum number of QC Personnel and their disciplines.C.2 |
| R38 | Provide all of the following key personnel requirements: • One (1) Senior Project Manager • One (1) Superintendent • One (1) Site Safety Manager • One (1) Quality Control Manager • One (1) Project EngineerC.2 |
| R39 | Describe your cost control methods during construction for proposed change orders, including how you obtain and confirm subcontractor/vendor pricing for changed work. Describe your process for reviewing subcontractor/vendor proposals for completeness and cost or price reasonableness, including applicable overhead, profit, and other markups, prior to submission to the Smithsonian. Describe how you resolve scope or pricing discrepancies and develop adequately supported change proposals for Smithsonian review and negotiation.C.2 |
| R40 | The Offeror shall identify materials, equipment, systems, components, and other items that it considers having the potential to adversely affect the Project schedule due to procurement duration, manufacturing duration, fabrication requirements, availability, transportation, testing, approval requirements, or other supply-chain constraints. The Offeror shall demonstrate its understanding of the Project's procurement risks and describe its proposed approach for proactively managing long -lead items to avoid impacts to the Project schedule.C.2 |
| R41 | Describe in detail how you will develop, maintain, and update the project schedule during construction including details for establishing and monitoring the critical path, methods for managing the float and monitoring schedule of subcontractors.C.2 |
| R42 | Provide a single time -scaled CPM summary schedule showing construction activities identifying construction logic that demonstrates understanding of the interdependencies and efficiencies among all elements of the work; activities to be accomplished during regular hours, multi -shift basis, weekends or holidays as required; installation of long lead / key equipment or material; and activities that may interrupt adjacent building operations.C.2 |
| R43 | The summary should contain no less than 100 activities and should combine activities for the 100% Final Phase 2 – Habitats & Animal Care Building drawings and specifications for the NZCBI ALF. The schedule should show sequence, duration, and interdependency. Identify all critical elements of work, including submittal review, each trade, important construction as well as designated milestones, critical long - lead items such as mechanical equipment, electrical, fire protection, envelope procurement and installation, HVAC systems and habitat enclosure mesh. Clearly show the critical path.C.2 |
| R44 | Provide a sample of the monthly schedule reports, including identification of milestones.C.2 |
| R45 | Provide a project specific Construction Quality Control (CQC) Plan as described in the 65% Specification Division 01 4000 Quality Requirement section that discusses in detail the methodology for assuring construction quality. Furnish resumes of all proposed CQC team members.C.2 |
| R46 | The offeror's CQC Plan shall discuss in detail the methodology that will be employed to provide assurance of a quality constructed project.C.2 |
| R47 | Describe in detail how your experience with Building Information Modeling (BIM) will be applied to the benefit of this project. Include but do not limit discussion to the following: • 3D coordination • PDF/ DWF Files • Construction System Design • Record Modeling • Phase Planning (4D modeling) • Cost EstimatingC.2 |
| R48 | Describe in detail other innovative technologies you propose to improve the performance of the team. Describe the specific benefits to the project goals.C.2 |
| R49 | NOTE: If there are any assumptions, exclusions or qualifications that affect the firm fixed price, a separate detailed breakdown sheet must be provided.C.2 |
| R50 | PLEASE DO NOT ALTER THE FORMC.2 |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Smithsonian Institution, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-20 | SIRIS LLCSmithsonian Institution · NMAH: DM SUPPORT FOR ALL NMAH PROJECTS. | $278,569 |
| 2026-09-30 | ASSOCIATED BUILDERS, INC.Smithsonian Institution · NZP-DC: MITIGATE STORMWATER AT ELEPHANT YARD - PROJECT #2233104 | $1.82 million |
| 2026-09-30 | ASSOCIATED BUILDERS, INC.Smithsonian Institution · NZP-DC: REDISTRIBUTE CAMPUS WIDE ELECT LOADS (PN 2433109) | $708,528 |
| 2026-09-29 | K & G TILT UP SERVICES LLCSmithsonian Institution · DWRC: SAAM EXHIBIT - BISA BUTLER - PROJECT NUMBER: 2648505 | $73,615 |
| 2026-09-29 | BISCAYNE CONTRACTORS, INCSmithsonian Institution · NZP-DC: UPGRADE HIGH VOLT PNLS & EQUIP @ VET HOSP (PN 2033119) | $3.93 million |
| 2026-09-29 | SIRIS LLCSmithsonian Institution · OPDC INTERIOR SERVICES. | $40,000 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.