ES BLDG 1624 RM 203 VTC & A/V Upgrade - FY27 RFQ: requirements and submission rules
18 requirements and 0 submission rules found in the solicitation documents for 2027-PZI-1710. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | See the Poly Studio X30 and Poly Studio X50 Regulatory Notices for all regulatory and safety guidance prior to configuration. |
| R2 | Only use the antennas delivered with the codec |
| R3 | For orders to be delivered to Argentina, Brazil, China and Japan, an appropriate power cord must be ordered with the system. Rating of the power cable: 10 A, 250 V Power connector: EL 701B (IEC 60320/C13) |
| R4 | Use a power cable that meets the requirements of the power specification of the codec. |
| R5 | Keep the power plug and outlet easily accessible in case you need to disconnect the device from power. |
| R6 | Network connectivity: Use either Ethernet LAN or Wi-Fi. |
| R7 | Do not block any ventilation openings on the codec. Minimum 10 cm / 4 in. free space in front and rear side of the unit. When mounted in a rack, observe that the ambient temperature does not exceed 35°C. |
| R8 | The product must be installed by qualified personnel. Due to the variety of wall constructions, the installer must bring the parts that are required to fix the product safely to the wall. |
| R9 | The wall and mounting hardware must be able to safely support the product. The wall mounted system must be installed by qualified personnel, in accordance with state and local building regulations. |
| R10 | Mount the camera below the screen when the mounting height of the screen is higher than 120 cm / 47 in. Mount the camera above the screen when the mounting height of the screen is lower than 120 cm / 47 in. |
| R11 | When mounting the camera above the screen, be sure to comply with the measurements so that there is space enough for the camera to be tilted fully forward. |
| R12 | Do not exceed the 15° tilt angle. |
| R13 | Always use the supplied power adapter (70 W, gray) for the Quad Camera. |
| R14 | Arrange the cables with enough space so the cables do not loosen when you tilt the camera fully forward. |
| R15 | When using the power cable, always use the power supplies for the PTZ 4K camera specified in www.cisco.com/go/PTZ4K-datasheet. |
| R16 | Don’t use a VISCA cable for camera control as it will cause severe damage to the camera. |
| R17 | Don’t install the camera using the tripod screw and tripod screw hole for ceiling installation. |
| R18 | Never leave the Quad Camera on the wall bracket with the release levers in unlocked position. |
Recent awards in NAICS 238210
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-30 | ALL DOOR SYSTEMS & SERVICESDepartment of the Army · OP3, OVERHEAD AND AUTOMATIC DOORS, SERVICE, APS-2 ZUTENDAAL AND CHIEVRES AIR BASE, BELGIUM | $149,746 |
| 2026-09-26 | CORNET TECHNOLOGY, INC.Department of the Army · CORNET RADIO MAINTENANCE AND TRAINING | $30,644 |
| 2026-08-26 | ERREGI SRLDepartment of the Air Force · # 4 SUPPORT CAMERAS FOR 510 FGS AS PER QUOTE ATTACHED TO THIS ORDER | $3,836 |
| 2026-07-29 | PREDICTIVE TECHNOLOGIES INC.Department of the Army · 400HZ CONVERTER INSPECTION TO OY3 | $19,760 |
| 2026-07-27 | SAWYER SERVICES INCDepartment of the Army · REPLACE DAMAGE TRANSFORMER IAW SOW | $19,701 |
| 2026-07-27 | FIBER BUSINESS SOLUTIONS GROUP INCDepartment of the Air Force · FIBER OPTIC AND CABLE INFRASTRUCTURE SUPPORT (FOCIS V) TASK ORDER #046 | $14,526 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.