TenderAxiom

TenderAxiom · Opportunities

Fire Alarm Control Panel Replacement Project (FACPR): requirements and submission rules

49 requirements and 15 submission rules found in the solicitation documents for 2026-PTG-FACPR. Use them as the start of your compliance matrix.

Solicitation number
2026-PTG-FACPR
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / BERKELEY NATL LAB - DOE CONTRACTOR
NAICS
238210
Set-aside
No Set aside used
Responses due
09 January 2027 (42 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Submissions must be emailed or electronically transmitted to the UPR via a file transfer site, such as Dropbox, no later than Friday, January 8, 2027 5:00 PM Pacific Time.
  • University of California Managing and Operating Lawrence Berkeley National Laboratory Request for Proposal: 2026-PTG-FACPR Page 1 REQUEST FOR PROPOSAL (RFP): 2026-PTG-FACPR PROPOSAL DUE DATE: 01/08/2027 Fire Alarm Control Panel Replacement Project North American Industry Classification System (NAICS) Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors within the Construction sector.
  • If an offeror intends to contact the general public regarding the Project, the nature and substance of that contact must be approved in writing by the UPR beforehand, in accordance with the Release of Information and Publication clause of the general provisions of the sample subcontract.
  • Treasury Department Circular 570 7 Attendance at the mandatory pre-proposal conference and on-site inspection University attendance record 8 Not debarred, suspended, or proposed for debarment, and eligible to receive federal contracts and subcontracts Representations and Certifications The following enclosures are provided for informational purposes and do not need to be returned:
  • Include the RFP number, volume title, and page number in the margin of all pages; C.
  • The technical volume may not exceed 20 pages and resumes no longer than a single page, not including the proposed schedule, certifications, licenses, and required forms, which do not count against the page limit.
  • Content beyond a stated page limit will not be read or evaluated.
  • Submission of insurance documentation is the responsibility of the Subcontractor, and shall be submitted to the email address for the University Procurement Representative identified on the subcontract, or mailed to: The Regents of the University of California and the U.S Government Lawrence Berkeley National Laboratory Attn: [University Procurement Representative’s Name] One Cyclotron Road Berkeley, CA 94720 3.
  • Any exemption from a CDDR requirement must be approved by the responsible LBNL engineer before the design is submitted to LBNL.
  • An offeror that does not meet every item will not be evaluated further. # Requirement Support 1 Acceptance of the terms, conditions, General Provisions, and incorporated documents of the sample subcontract Statement of acceptance, or exceptions submitted in accordance with Section 4.1 2 Current and active State of California contractor's license in good standing License number, classification, and expiration date.
  • Payment and Performance Bonds The successful offeror shall furnish, after receipt of the resulting Subcontract, performance and payment bonds as specified in the Price Proposal for Lump Sum Construc tion Subcontract form [OR]General Provisions incorporated into the Sample Subcontract [OR]Sample Master Agreement.
  • The selected offeror must deliver products and services in compliance with the Environmentally Preferable Products and Services (EPP) article of the Sample Subcontract which implements the requirements of DEAR 952.223-78, Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.
  • SAMPLE LIST Hazardous Material Identification No. [Material 1] xxx [Material 2] xxx [Material 3] xxx The selected offeror must make SDS available to the University upon request, meeting the requirements of 29 CFR 1910.1200 and the latest version of Federal Standard No.
  • The selected offeror may not commence any work performed at an LBNL worksite until the Subcontract has been awarded and signed.
  • Proposal Submittal Requirements Offerors must submit the technical and price proposals electronically.

Requirements

IDRequirement
R1Complete every blank cell. Enter "$0" rather than leaving a cell blank if no cost applies.
R2The total in Table B must equal the total in Table A.
R3Do not include exclusions, qualifications, or conditions in this form. An offer that conditions its price may be found non-responsive.
R4Do not include any pricing information in the Technical Volume.
R5The Offeror will furnish performance and payment bonds, each at 100% of the subcontract price, from a surety listed in U.S. Treasury Department Circular 570, within ten working days after award and before Notice to Proceed or the start of on-site work.
R6Distribute general conditions, mobilization, bonds, insurance, overhead, and profit across Lines 1 through 4. Do not show them as separate lines.
R7The Offeror will complete all Design work within ______ calendar days after Notice to Proceed. The Offeror will complete all Construction work within ______ calendar days after Notice to Proceed. This duration must allow completion no later than March 7, 2028.
R8List each known lower-tier subcontractor that will perform work at the site or specially fabricate and install a portion of the work.
R9The selected subcontractor will be required to obtain the required insurance coverage, and submit insurance certificates, endorsements, copies of policy pages for blanket coverage, and other documentation confirming the required insurance coverage as stipulated in the subcontract, prior to commencing performance at a worksite other than the Subcontractor's or lower-tier subcontractor's facilities.
R10The dollar limits for each type of insurance must be equal to or higher than the minimum dollar limits specified in the Subcontract, and the policy coverage dates must be current for all the types of insurance.
R11Any SIR or deductible of $500K or more, requires written approval from the University Procurement Representative. To obtain this approval, the Subcontractor must submit a Certificate of Self Insurance and a copy of a recent CPA-audited or reviewed financial statements.
R12The Subcontractor or its insurers must provide written notification at least 30 days in advance of any modification, change, or cancellation of any of the insurance coverage.
R13All proposals must be submitted in accordance with the instructions in this RFP.
R14The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered.
R15Offerors must complete the Small Business Program Representations clause in the attached Representations and Certifications form.
R16The design schedule is fixed by the SOW and is summarized below. Offerors must build their proposed schedules around these durations.
R17Occupants must receive written notice at least six months before any cutover. Final commissioning and cutover must proceed one building at a time, with a 7-day buffer.
R18The Subcontractor must perform all design activities in strict accordance with the LBNL Construction Details and Design Requirements ("CDDR") and the current LBNL Master Specifications. The fire alarm design must follow NFPA 72 (2025 edition) and the California Fire Code.
R19In the event of a conflict between codes, industry standards, and the SOW, the most stringent requirement applies, and offerors must base their proposals on the most stringent requirement.
R20All communication with the University about this Project must be by email and directed to the UPR. Do not communicate about the Project or this solicitation with any other University or Lab employee, representative, or consultant.
R21Written proposals must be submitted by email (or other form of secure electronic submission) to the University Procurement Representative (ptgajda@lbl.gov) no later than 5:00 pm Pacific Time on Friday, January 8, 2027
R22To be responsive, an offeror must attend the mandatory pre-proposal conference and on-site inspection, meet the minimum requirements in Section 3.6, and submit a complete proposal in accordance with the instructions in this RFP.
R23Attendance is mandatory. Proposals from firms that did not attend will not be evaluated. Each offeror may send up to no more than three key team members.
R24Offerors must inform Carlos Guerrero (cguerrero@lbl.gov) by the end of business on Monday, November 30, 2026 of the number of persons attending and their contact information, including name, email, and citizenship, including any lower-tier subcontractors and the company they represent, so that LBNL gate access can be arranged.
R25To gain access to the site, every individual must present a government-issued photo identification. Those attending must bring their own hard hat, safety glasses, high-visibility vest, and hard-toed footwear.
R26To ensure sufficient information is available, offerors must furnish as part of their proposal all descriptive material (such as manuals, drawings, technical specifications, or other information) necessary for the University’s evaluation.
R27The Cover Page must identify the offeror's name and address; the RFP number and title; and the names, titles, telephone numbers, and email addresses of the individuals in the offeror's organization who have commitment authority and will be responsible for binding contractual negotiations and administration. It must also identify each proposed key team member and the firm each is affiliated with.
R28Cover Page See Section 3.4 2 pages
R29Access to a California-licensed Professional Engineer able to serve as Engineer of Record and Responsible Design Professional. A California-licensed Fire Protection Engineer must review, stamp, and approve all fire alarm drawings. [Support: Name of firm or in-house group, and the California PE license number of the individual who will stamp the drawings.]
R30Ability to meet the required insurance coverage [Support: Certificate of insurance or broker letter]
R31Bonding capacity for performance and payment bonds [Support: Surety letter from a company listed in U.S. Treasury Department Circular 570]
R32Each response narrative must be clearly identifiable to its associated evaluation factor.
R33The price proposal must include a completed Attachment C – Price Proposal Form, with separate fixed-price line items for the design, the construction, and Siemens price of each building (2, 26, 33, and 76).
R34The price proposal must also identify the name of each known lower -tier subcontractor who will perform work or labor at the worksite or who will specially fabricate and install a portion of the work.
R35Offerors must only propose lower -tier subcontractors that are equipped, experienced, and appropriately licensed to do the work in their particular field. No portion of the work may be reserved by the offeror to itself unless it is so equipped, experienced, and licensed. Only one lower-tier subcontractor may be listed for the same portion of the work.
R36Offerors must include all applicable federal, state, and local taxes, duties and all other Subcontractor obligations under the resulting Subcontract, including all direct costs, indirect expenses and any fee or profit, and disposal of the materials the Subcontractor is responsible for removing under SOW Section 4.5.
R37The offeror should include in its proposal a statement that the offeror takes no exceptions to the terms, conditions, general provisions, or the incorporated documents of the Sample Subcontract. The offeror should include in its request for consideration of exceptions a redlined version of the Sample Subcontract [with all proposed revisions indicated by tracked changes, or a separate sheet with all proposed revisions indicated by tracked changes, referencing the article or clause to which the proposed revision applies. The offeror must also include in its request for consideration of any exception, a business case for that exception, providing a justification for the requested change and an analysis of any increased risk to the University.
R38The proposal should describe the offeror’s current financial condition and its financial ability to fully support performance of the proposed Subcontract.
R39The selected offeror will be required to have a purchasing system that is adequate for the proposed type of Subcontract if the subcontract includes the proposed purchase of goods or services by the offeror that are anticipated to be >$50,000. If the offeror has had a federal agency approve its purchasing system, provide a copy of the government report and/or adequacy determination letter. Complete and submit the Pre -award Survey of Prospective Subcontractor’s Accounting System form enclosed with this RFP, including required supporting policies and procedures as indicated on the form.
R40Use of these documents for any purpose outside of responding to this solicitation is strictly prohibited. No document may be distributed to others or otherwise reproduced or used without written permission from the UPR.
R41If the offeror intends to use a product or process for which there is a patent position or existing background intellectual property, the proposal should identify and list it, including patent applications and patents granted (with dates, numbers, and descriptions), and whether the Government has rights in that background intellectual property.
R42Before subcontract award, the offeror will provide export control classification information for all items as required by the Representations and Certifications form. Items may not be accepted without the export control information required by this Request for Proposal.
R43The selected offeror will be required to: A. Be enrolled in the Government's online E -Verify system at https://e-verify.uscis.gov/enroll and, if necessary, provide the University with written verification of enrollment; B. Use E-Verify to verify the employment eligibility of all employees assigned to the subcontract and of all new hires working in the United States, except as otherwise permitted by the clause; and C. Include the clause in lower -tier subcontracts for construction or services exceeding $3,500 and, if necessary, provide the University with written verification of the inclusion of the clause and the lower-tier subcontractors' enrollment in E-Verify.
R44Offers must be based on, and all laborers and mechanics performing work at the worksite under the Subcontract shall receive no less than the wages and benefits specified in the Wage Determination provided with this RFP. Offerors shall immediately notify the University Procurement Representative if it intends to establish a secondary site specifically for the performance of a significant portion of the building or work for which the Wage Determination provided with this RFP is not applicable.
R45The offeror is to indicate in the Representations and Certifications form, to be submitted with the proposal, whether it proposes to furnish any foreign end construction material. If the offeror proposes to furnish any foreign construction material, the offeror must request relief on the basis that domestic construction material is: (1) unreasonably priced, or (2) not commercially available in sufficient quantities of a satisfactory quality.
R46LBNL is required to obtain certificates from potential subcontractors and vendors using or offering equipment or fleets exceeding 25 total horsepower (HP) demonstrating compliance for Laboratory-related work in the State of California prior to award.
R47The offeror must include in its proposal a list of any hazardous material to be delivered or used on site under the subcontract. Hazardous material, as used here, includes any material defined as hazardous under the latest version of Federal Standard No. 313. Each material must be properly identified, including any applicable identification numbers such as a National Stock Number or Special Item Number. This information must also appear on the Safety Data Sheets (SDS).
R48Before the work can begin, the selected offeror will be required to submit for approval a written Workplace Substance Abuse Program (WSAP) consistent with 10 CFR 707.
R49To be considered for award, offers of equal items, including equal items of the brand name manufacturer, must: • Meet the salient physical, functional, or performance characteristic specified in this solicitation; • Clearly identify the item by brand name, if any, and make or model number; • Include descriptive literature such as illustrations, drawings, or a clear reference to descriptive data or information reasonably available; and • Clearly describe any modifications t he offeror plans to make to a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.

Recent awards in NAICS 238210

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-24UNITED SALES ASSOC INCDepartment of Energy · 466 AMP-HR, 2 VOLT JAR, DIN FLOODED, NEW UNDERWOOD, EO 14398$36,302
2026-08-10NEW PHASE ELECTRICAL LLCDepartment of Energy · DATACENTER RECABLING - INSTALL RECEPTACLES, PHOENIX, AZ$14,991
2025-08-14CONLIFF SOLUTIONS LLCDepartment of Energy · BUILDING 26 ROOM 51 A/B/C AUDIO/ VIDEO RENOVATION AT NETL MORGANTOWN, WV SITE SBA REQUIREMENT NUMBER: IC1747840269M$938,959
2025-05-19HANSON AUDIO VIDEO, LLCDepartment of Energy · THIS PURCHASE ORDER IS THE PURCHASE OF THE MATERIAL AND INSTALLATION OF EQUIPMENT NECESSARY TO REPURPOSE AND UPGRADE THE AUDIO/VISUAL EQUIPMENT IN THE EMCBC'S TRAINING ROOM.$144,100
2025-01-15ELECTRO-TEST & MAINTENANCE, INCDepartment of Energy · GDE REGULATOR TANK REPLACEMENT$62,130
2024-09-16DAP CONSTRUCTION MANAGEMENT LLCDepartment of Energy · PROVIDE AND INSTALL (2) 225A PANELS IN THE DATA SERVER ROOM FED FROM EXISTING PANELS, DCA AND DCB. FEEDERS WILL BE RATED FOR 150 AMPS WITH 150 AMP MAIN BREAKERS. INSTALLATION OF (8) 30A L6-30R OUTLETS$78,730

Source: USAspending.gov, retrieved 2026-11-18. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.