RFQ _ Construction Services-Technical Security Upgrade (TSU): requirements and submission rules
41 requirements and 7 submission rules found in the solicitation documents for 19WZ6027Q0001. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- (b) These schedules shall include the time by which shop drawings, product data, samples and other submittals required by the contract will be submitted for approval.
- Quotations must be submitted no later than Friday December 18, 2026, at 10:00hours.
- CONTRACTOR'S SUBMISSION OF CONSTRUCTION SCHEDULES (a) The time for submission of the schedules referenced in FAR 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as " 10 calendar days after receipt of an executed contract".
- The Contractor shall submit both the information and the guarantee or warranty to the Government in sufficient time to permit the Government to meet any time limit specified in the guarantee or warranty, but not later than completion and acceptance of all work under this contract.
- G.4.3 The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause.
- (1) The SSHP shall be submitted at least 10 working days prior to commencing any activity at the site.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) ( https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
Requirements
| ID | Requirement |
|---|---|
| R1 | The Offeror/Quoter shall identify and explain/justify any deviations, exceptions, or conditional assumptions taken with respect to any of the instructions or requirements of this request for quotation in the appropriate volume of the offer.Section J |
| R2 | At a minimum, each Offeror/Quoter must meet the following requirements: (1) Be able to understand written and spoken English. (2) Have an established business with a permanent address and telephone listing in the Kingdom of Eswatini or plans to obtain required work permits. (3) Be able to demonstrate prior construction experience with suitable references. (4) Have the necessary personnel, equipment and financial resources available to perform the work. (5) Have all licenses and permits required by local law. (6) Meet all local insurance requirements. (7) Have the ability to obtain or to post adequate performance security, such as bonds, irrevocable letters of credit or guarantees issued by a reputable financial institution. (8) Have no adverse criminal record; and (9) Have no political or business affiliation which could be considered contrary to the interests of the United States.Section J |
| R3 | Present the performance schedule in the form of a 'bar chart' indicating when the various portions of the work will be commenced and completed within the required schedule. This bar chart shall be in sufficient detail to clearly show each segregable portion of work and its planned commencement and completion date. |
| R4 | Proposed Work Information - Provide the following: (1) A list of the names addresses and telephone numbers of the owners, partners, and principal officers of the Offeror. (2) The name and address of the Offeror's manager for this project. (3) A list of the names, addresses, and telephone numbers of subcontractors and principal materials suppliers to be used on the project, indicating what portions of the work will be performed by themSection J |
| R5 | Experience and Past Performance - List all contracts and subcontracts your company has held over the past three years for the same or similar work. Provide the following information for each contract and subcontract: (1) Customer's name, address, and telephone numbers of customer's lead contract and technical personnel. (2) Contract number and type. (3) Date of the contract award place(s) of performance, and completion dates; Contract value. (4) Brief description of the work, including responsibilities; and (5) Any litigation currently in process or occurring within last 5 years.Section J |
| R6 | The Contractor shall furnish some form of payment protection as described in 52.228-13 in the amount of 50% of the contract price. This will be in the form of bank guarantee. The Contractor shall provide the information required by the paragraph above within ten (10) calendar days after award.G.1.0 |
| R7 | The Contractor shall at its own expense provide and maintain during the entire performance period the following insurance amounts: G.2.1 GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury): (1) BODILY INJURY, ON OR OFF THE SITE, IN ESWATINI EMALANGENI (E) Per Occurrence E250,000.00 Cumulative E500,000.00 (2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN ESWATINI EMALANGENI (E) Per Occurrence E250,000.00 Cumulative E500,000.00G.2.0 |
| R8 | The general liability policy required of the Contractor shall name 'the United States of America, acting by and through the Department of State', as an additional insured with respect to operations performed under this contract.G.2.2 |
| R9 | The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.G.2.2 |
| R10 | LOCAL CONTRACTOR SHALL HAVE A RESIDENT REGISTERED/CERTIFIED/LICENSED CIVIL ENGINEER OR GRADUATE ARCHITECT ON SITE OR A QUALIFIED CONSTRUCTION SUPERVISOR AT ALL TIMES, WHO SHOULD HAVE AT LEAST TWO YEARS EXPERIENCE IN SIMILAR WORK AND CAN SPEAK, WRITE AND READ ENGLISH AT A MODERATE OR HIGHER LEVEL. LOCAL CONTRACTOR SHALL SUBMIT THE CURRICULUM VITAE OF THE RESIDENT ENGINEER TO THE EMBASSY COMPOUND FOR APPROVAL. |
| R11 | The Contractor shall provide an English speaking supervisor on site at all times. This position is considered as key personnel under this purchase order.G.5.0 |
| R12 | After award, the Contractor has ten (10) calendar days to submit to the Contracting Officer a list of workers and supervisors assigned to this project for the Government to conduct all necessary security checks. It is anticipated that security checks will take 10 days to perform. For each individual, the list shall include: Full Name, Place and Date of Birth, Current Address, Identification numberG.5.0 |
| R13 | CONTRACTORS WILL MAINTAIN AN ESCORT RATIO OF 1 : 5 IN ACCORDANCE WITH POST ACCESS CONTROL POLICY. EMBASSY ESCORTS WILL BE ARRANGED BY RSO, EITHER THROUGH LOCAL GUARD FORCE, OR IN COORDINATION WITH FACILITIES MAINTENANCE. LOCAL CONTRACTING PERSONNEL, VEHICLES AND EQUIPMENT WILL BE SCREENED BEFORE GAINING ENTRY TO THE COMPOUND. CONTRACTORS ARE REQUIRED TO PROVIDE NAMES AND OTHER PERTINENT PERSONAL DETAILS OF ALL EMPLOYEES FOR PRE-VETTING AT LEAST 72 HOURS IN ADVANCE OF ANY WORK PERFORMED TO A DESIGNATED EMBASSY POINT OF CONTACT (POC). |
| R14 | AT THE CLOSE OF EACH BUSINESS DAY, CONTRACTORS WILL GATHER UP LOOSE TOOLS AND EQUIPMENT TO ENSURE THEY ARE PROPERLY SECURED. |
| R15 | LOCAL CONTRACTOR WILL PROVIDE A DETAILED PROJECT SCHEDULE, WITH START AND END DATES FOR WORK ACTIVITIES AND STATING A CRITICAL PATH. |
| R16 | The contractor shall provide a detailed construction schedule showing all major activities and milestones within 10 days of contract award.Section B |
| R17 | LOCAL CONTRACTOR WILL PROVIDE POST WITH WEEKLY WORK PROGRESS REPORTS AND CONSTRUCTION SCHEDULE UPDATES DURING THE DURATION OF THE PROJECT. |
| R18 | The reports shall include photographs documenting the progress of the work. The contractor shall provide construction schedule updates on a regular basis showing the current status of the work and any changes to the anticipated completion date. The contractor shall provide material delivery schedules showing when materials will be delivered to the site.Section B |
| R19 | ALL WORK SHALL BE ACCOMPLISHED AS PER THE FOLLOWING CODES AND GUIDELINES. 1. 2018 INTERNATIONAL FIRE CODE (IFC) AND 2020 NATIONAL ELECTRICAL CODE (NEC). 2. 2022 OBO DESIGN STANDARDS (2018 INTERNATIONAL CODES AS ADOPTED AND AMENDED). 3. OS SECURITY ENGINEERING APPLICATION GUIDELINES. 4. 1990 AMERICANS WITH DISABILITIES ACT. 5. ASCE/SEI 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER STRUCTURES. |
| R20 | LOCAL CONTRACTOR WILL VERIFY EXISTING UTILITIES AND PROVIDE AS-BUILT DRAWINGS PRIOR TO EXCAVATING OF TRENCH. IF THE EXCAVATION WORK INTERFERES WITH DRAIN OR PIPING, THE LOCAL CONTRACTOR SHALL INFORM POST AND PROVIDE SUITABLE PROTECTION FOR THESE STRUCTURES PRIOR TO PROCEEDING WITH THE WORK. |
| R21 | LOCAL CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING AND REMOVING ALL DEBRIS FROM THE EMBASSY COMPOUND TO THE NEAREST AUTHORIZED DUMP FACILITY (AUTHORIZED BY THE TOWN). THE AREAS AFFECTED BY LOCAL CONTRACTOR'S WORK MUST BE RETURNED BACK TO PRE-CONSTRUCTION CONDITIONS AFTER THE WORK IS COMPLETED. (E.G. GRASS, GRAVEL, SIDEWALK, LANDSCAPING, ASPHALT ETC.) |
| R22 | LOCAL CONTRACTOR SHALL LIMIT THE SITE DISTURBANCE TO A MAXIMUM 6 FEET (1829 MM) ON EACH SIDE OF TRENCH. EXCAVATED MATERIAL WILL BE PLACED NEXT TO THE EXCAVATED AREA TO BE USED AS SELECT BACKFILL. |
| R23 | LOCAL CONTRACTOR MUST CLEARLY MAJRK ALL EXCAVATION WORK ZONES WITH WAJRNING SIGNS AND YELLOW PLASTIC SAFETY TAPE FIXED TO WOOD POSTS. LOCAL CONTRACTOR MUST COMPLY WITH ALL APPLICABLE SAFETY STANDARDS TO PROTECT THE EMBASSY COMPOUND EMPLOYEES, THE PUBLIC AND LOCAL CONTRACTOR WORKERS FROM INJURIES AND ACCIDENTS. |
| R24 | LOCAL CONTRACTOR MUST MAKE SURE THAT THE EMBASSY COMPOUND EQUIPMENT AND PROPERTY IN THE WORK ZONE OR SURROUNDING AREAS ARE PROTECTED TO PREVENT THEM FROM GITTING DAMAGED DURING CONSTRUCTION. |
| R25 | LOCAL CONTRACTOR MUST KEEP ALL DEBRIS AND EXCAVATED MATERIAL CLEAR OF SERVICE NETWORK DRAJNS, COVERS AND SUMPS NEAR THE TRENCHES, TO PREVENT CLOGS OR DAMAGE. |
| R26 | The local contractor must keep all debris and excavated material clear of service entrance/egress, access roads, and ramps. The contractor shall provide dumpsters or equivalent containers for waste disposal and shall ensure that all waste materials are properly disposed of in accordance with local regulations.Section B |
| R27 | LOCKABLE HANDHOLES WILL BE INSTALLED BY THE LOCAL CONTRACTOR AS SPECIFIED ON DETAIL DRAWINGS. LOCAL CONTRACTOR WILL MAKE HOLE PENETRATIONS TO THE EXISTING MAJNTENANCE HOLES ACCORDING TO NUMBER OF CONDUITS ENTERING AND EXITING THE MAINTENANCE HOLE. THE BASE OF THE HANDHOLES SHALL BE PLACED OVER A BASE OF CRUSHED NON-POROUS ROCK OR GRAVEL AND SAND. THE GRAVEL SIZE SHALL NOT EXCEED 1/2 INCH (13MM). |
| R28 | UNDER GRASS, DIRT, SIDEWALK OR ASPHALT, INSTALL SCHEDULE 80 PVC CONDUIT 24 INCHES (610MM) BELOW FINISH GRADE TO THE TOP OF THE CONDUIT AS SPECIFIED ON THE DRAWINGS. ALL UNDERGROUND 90 DEGREE BENDS WITH A 12 INCH (305MM) RADIUS SHALL BE MADE WITH PRE-FABRICATED 90 DEGREE SWEEPING BEND. ALL UNDERGROUND CONDUIT SHALL BE CONVERTED FROM SCHEDULE 80 PVC TO RGS ABOVE GROUND USING PVC TO RGS COUPLERS. LOCAL CONTRACTOR SHALL LEAVE A PULL LINE IN ALL INSTALLED CONDUIT PATHS. |
| R29 | ALL CONDUIT STUBBED AND CAPPED ABOVE THE GROUND SHALL BE AT A HEIGHT OF NO LESS THAN 12" (305mm) FROM THE GROUND. WHEN THE STUBBED CONDUIT IS NEAR A WALL OR POLE IT MUST BE AT A LEAST 2" (51mm) FROM THE WALL OR POLE TO ALLOW FOR BOX MOUNTING. |
| R30 | LOCAL CONTRACTOR WILL PROVIDE LABOR AND MATERIALS TO REPAJR CONCRETE WHERE DISTURBED. CONCRETE COLOR, TYPE AND THICKNESS SHALL MATCH EXISTING. CONCRETE USED SHALL BE 25MPA. CONCRETE MAY NOT BE POURED IF WEATHER CONDITIONS DO NOT PERMIT. APPROVAL FROM POST MUST BE OBTAINED 24 HOURS PRIOR TO POURING OF CONCRETE. POST AND LOCAL CONTRACTOR CREW SUPERVISOR MUST BE PRESENT DURING THE POURING OF CONCRETE. |
| R31 | GENERAL: WITTING OF CONCRETE SURFACES DURING SCREEDING, INITIAL FLOATING, OR FINISHING OPERATIONS IS PROHIBITED. |
| R32 | PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8-INCHES (203MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4-INCHES (102MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND-OPERATED TAMPERS. PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557: - UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS, SCARIFY AND RE-COMPACT TOP 11-INCHES (280MM) OF EXISTING SUB GRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 95 PERCENT. - UNDER WALKWAYS, SCARIFY AND RE-COMPACT TOP 6-INCHES (152MM) BELOW SUB GRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 92 PERCENT. UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RE-COMPACT TOP 6-INCHES (152MM) BELOW SUB GRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT. - FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL BACKFILL SOIL MATERIAL AT 85 PERCENT. |
| R33 | The plan must address developing activity hazard analyses (AHAs) for specific tasks. The AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. Work shall not begin until the AHA for the work activity has been accepted by the COR and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives.Section H (special requirements) |
| R34 | The contractor shall provide a written plan for correcting deficiencies within 48 hours of notification.Section B |
| R35 | The Contractor shall give the Contracting Officer at least five (5) days advance written notice of the date when the work will be fully completed and ready for final inspection and tests.D.2.3 |
| R36 | After final completion of the work, but before final acceptance thereof, the Contractor shall provide: (1) a complete set of 'as-built' drawings, based upon the record set of drawings, marked to show the details of construction as actually accomplished; and, (2) record shop drawings and other submittals, in the number and form as required by the specifications.G.3.1 |
| R37 | Contractor personnel must take the following actions to identify themselves as non-federal employees: 1) Use an e-mail signature block that shows name, the office being supported and company 2) Clearly identify themselves and their contractor affiliation in meetings. 3) Identify their contractor affiliation in Departmental e-mail and phone listings whenever contractor personnel are included in those listings; and 4) Contractor personnel may not utilize Department of State logos or indicia on business cards.Section H (special requirements) |
| R38 | The Contractor shall use only domestic construction material, Recovery Act designated country manufactured construction material, or designated country unmanufactured construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.Section H (special requirements) |
| R39 | The Offeror represents that (1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds 'will' in paragraph (d)(1) of this section; and (2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds 'does' in paragraph (d)(2) of this section. |
| R40 | The Offeror represents that it [ ] does, [ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument. After conducting a reasonable inquiry for purposes of this representation, the Offeror represents that it [ ] does, [ ] does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.Section L (instructions to offerors) |
| R41 | By submission of its offer, the offeror certifies that it does not conduct any restricted business operations in Sudan.Section L (instructions to offerors) |
Recent awards in NAICS 237990
The newest federal contract awards in the same industry code from Department of State, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-01 | TEXAS ELECTRICAL & TESTING SERVICES LLCInternational Boundary and Water Commission: U.S.-Mexico · RETAMAL BUOY SYSTEM WARNING SIGNS EMERGENCY | $768,000 |
| 2026-09-30 | GECS SARLDepartment of State · FAC - 103 ROI BAUDOUIN FRONT PERIMETER WALL REPAIR | $24,661 |
| 2026-09-29 | MISCELLANEOUS FOREIGN AWARDEESDepartment of State · SHADES CONSTRUCTION AND REPAIR | $22,341 |
| 2026-09-29 | ESTUDIOS EDIFICACIONES E INTERVENTORIAS EN INGENIERIA EEII S A SDepartment of State · STORM & SEWAGE DRAINAGE U.S. QUITO, ECUADOR | $496,088 |
| 2026-09-23 | BOZDEMIR CONSTRUCTION LLCDepartment of State · WATER INFRASTRUCTURE IMPROVEMENTS, U.S. EMBASSY MANAGUA, NICARAGUA | $1.92 million |
| 2026-09-22 | MISCELLANEOUS FOREIGN AWARDEESDepartment of State · RANGE BERM RENOVATION | $54,700 |
Source: USAspending.gov, retrieved 2026-11-16. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.