Aviation Operations Center (AOC)- Building Engineer Report (BER): requirements and submission rules
29 requirements and 15 submission rules found in the solicitation documents for 15DDHQ27R00000001. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Any questions must be submitted in writing via email to Jose Marin at Jose.L.Marin@dea.gov no later than November 24, 2026, at 10:00 am EDT.
- No late submissions will be accepted or considered.
- The Proposal must be typed, double-spaced, with one-inch margins, using Times New Roman font, 12 pitch type (or Equivalent) and printed, unreduced in size, cm 8 1/2” by 11” page, not ex ceeding 20 pages, single sided.
- Any pages in excess of the page limitation will be disregarded and will not be included in the Proposal evaluation.
- A copy of the signed notice/release shall be submitted to DEA with the DOJ-555. c.
- The Contractor shall ensure that all security related forms and questionnaires are filled out correctly and completely and are signed, dated, and submitted to the Contracting Officer’s Technical Representative or Task Monitor (COTR/TM) in a timely manner.
- The date of the applicant’s signature on the SF85 must not be more than 30 days old when submitted to the COTR/TM.
- Proposals submitted by Offeror's who did not attend the site visit will be deemed non-responsive and will not be considered.
- Final proposals must be submitted via email by November 30, 2026, at 10:00 am EDT.
- All submissions (questions and/or proposals) must be submitted electronically to Jose.L.Marin@dea.gov with the RFP number included in the subject line.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
- Any changes provided by the Offeror in paragraph (b)(2) of this provision do not automatically change the representations and certifications in SAM.
- Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted electronically on SAM.]
- Any taxes or surcharges which the Contractor seeks to pass along to the Government as end user will be governed by the terms of the underlying Government contract and, in any event, must be submitted to the Contracting Officer for a determination of applicability prior to invoicing unless specifically agreed to otherwise in the Government contract.
- When the intent to employ such individual is known prior to the award of a new contract or order, the contractor shall submit the employee’s completed questionnaire and résumé to DEA concurrently with its proposal.
Requirements
| ID | Requirement |
|---|---|
| R1 | This procurement is a 100% Small Business set-aside. |
| R2 | All proposals must be on an all or none basis, alternate proposals will not be accepted. |
| R3 | All offerors must submit a complete proposal which will be evaluated based on the criteria listed in the offeror’s instruction section. |
| R4 | A site visit is scheduled, and attendance is required. The site visit is scheduled for 9:00 am CST on November 17, 2026, at the Aviation Operations Center (AOC) Facility located at 2300 Horizon Drive, Fort Worth, TX 76177. |
| R5 | The Offeror must provide an acceptance period of not less than 45 calendar days. |
| R6 | All communications concerning the solicitation, including any of a technical nature, must be made through Jose Marin, Contract Specialist, at Jose.L.Marin@dea.gov. |
| R7 | Questions must identify the applicable section, page number and paragraph. |
| R8 | Proposal must conform to the Request for Proposal (RFP) clauses and provisions and be prepared in accordance with this section. The proposal must be clearly marked with the RFP number and title. The Offeror must submit its Proposal in Microsoft Office and Adobe compatible files. |
| R9 | To aid its evaluation, the proposal must be clearly and concisely written as well as being neat, indexed, and logically assembled addressing each factor in the order specified by the solicitation. All pages of each part must be appropriately numbered and identified with the name of the contractor, and RFP number. The proposal must be specific and complete in every detail. The proposal must be practical, straightforward with a concise delineation of what it is the contractor will do to satisfy the requirements of the Product Description/Specifications. |
| R10 | The proposal must not merely offer to perform the work in accordance with the scope of the work. It must outline the actual work proposed as specifically as practical. Product Description/Specifications reflect the objectives of the program, therefore merely stating or affirming that the contractor will execute the performance requirements without sufficient elaboration will not be acceptable. |
| R11 | The Proposal must be prepared in two separate volumes: Volume 1. Technical Proposal, and Volume 2. Business Proposal. |
| R12 | Technical Proposal (Volume 1) One (1) written Technical Proposal (Factors 1, 2, and 3) must be submitted and address the requirements of the Product Description/Specifications for the evaluation factors specified. |
| R13 | FACTOR 1: Technical Capability • The Offeror must demonstrate technical understanding of the requirement, the approach, and techniques proposed by the offeror to satisfy the elements of the Statement of Work. |
| R14 | FACTOR 2: Key Personnel The Offeror must provide resumes to reflect the qualifications listed below for each position. |
| R15 | PROJECT MANAGER: 5+ years of experience managing a 200,000(+) square foot project, to include design, delivery, and installation, as well as coordination with other trades; and must have simultaneously managed multiple projects spanning the continental US |
| R16 | PROJECT ARCHITECT: 5+ years of experience and I possess a professional architecture degree, a licensed architect. Proven track record of leading design and technical execution for projects of varying complexity |
| R17 | CIVIL ENGINEER: 5+ years of experience managing 200,000(+) square foot project, Active Professional Engineer (PE) registration is preferred but extensive experience with design, planning, and project management will be considered. |
| R18 | STRUCTURAL ENGINEER: 6+ years of experience managing 200,000(+) square foot project. Bachelor’s degree in civil or Structural Engineering, a Professional Engineer (PE) license preferred, and proficiency in structural analysis and applicable building codes |
| R19 | MECHANICAL ENGINEER: 4+ years of experience managing 200,000(+) square foot project. Experience with mechanical systems design (including HVAC and plumbing) |
| R20 | FIRE PROTECTION ENGINEER: 4+ years of experience managing 200,000(+) square foot project. Experience with design and administration of fire safety systems, suppression, alarm and performing code reviews. |
| R21 | ELECTRICAL ENGINEER: 5+ years of experience managing 200,000(+) square foot project. Experience with electrical design, troubleshooting and power systems: |
| R22 | FACTOR 3: Past Performance • Offeror must provide relevant past performance as it relates to the probability of successful accomplishment of the contract requirements. |
| R23 | Business Proposal (Volume 2) One (1) written Business Proposal (Factor 4). The proposal must include required business information specified below, and the unit price for each line |
| R24 | FACTOR 4: Price The Offeror proposes pricing for each line items. • The Offeror must propose a single loaded price per Contract Line-Item Number • The Offeror must verify the calculated total price per CLIN and the grand total. Failure to provide a rate for each CLIN may result in elimination from further consideration. |
| R25 | Price quotes must be provided by completing the Schedule of Supplies/Services provided in this RFP that will be considered on an all-or-none basis per instructions in the solicitation. |
| R26 | Business Quote must also include the following: o Company Name, Address, Point of Contact o UEI Number, Cage Code o GSA Schedule Number, SIN Number o Business Size o Completion of DEA-2852.209-70 – Organizational Conflicts of Interest (MAY 2012) – The Contractor shall refer to clause DEA-2852.209-70 located in attached clause matrix. o Any changes or updates to the representations and certifications on file in the System for Award Management as required by paragraph (b) of Federal Acquisition Regulation provision 52.212-3 Contractor Representations and Certifications – Commercial Items |
| R27 | To assist the Government in assessing whether the acquisition poses a national security risk, offerors are required to complete and submit with its offer or quotation the National Security Acquisition Risk Assessment Questions, which are attached to this solicitation. Offerors must answer all questions completely and accurately to the best of their knowledge and belief. |
| R28 | Offerors are also required to request, collect, and forward with its offer or quotation completed National Security Acquisition Risk Assessment Questions from all subcontractors that will provide any equipment or software in performance of the contract or order. |
| R29 | OFFERORS – COMPLETE THE REPRESENTATIONS BELOW AND RETURN THEM WITH YOUR OFFER OR QUOTE IF THE VERSIONS OF THESE PROVISIONS IN YOUR ANNUAL REPRESENTATIONS AND CERTIFICATIONS IN THE SYSTEM FOR AWARD MANAGEMENT ARE EARLIER THAN OCT 2020. 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) |
Recent awards in NAICS 541350
The newest federal contract awards in the same industry code from Department of Justice, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-09 | AMERICAN FIRE PROTECTION GROUP, INC.Federal Prison System / Bureau of Prisons · 5 YEAR OBSTRUCTION INSPECTION. | $28,500 |
| 2026-07-10 | SWITCHGEAR MAINTENANCE SERVICES L.L.CFederal Prison System / Bureau of Prisons · ELECTRICAL EQUIPMENT INSPECTION, CLEANING AND TESTING | $17,028 |
| 2026-06-08 | THE VERTEX COMPANIES LLCDrug Enforcement Administration · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $12,725 |
| 2026-06-01 | VOLTER ELECTRICAL CONSTRUCTION CORPDrug Enforcement Administration · TITLE: EPIC - BUILDING ENGINEER REPORT (BER) | $162,842 |
| 2026-05-26 | INSPECTIONS NW LLCFederal Prison System / Bureau of Prisons · CAT5 WITNESS TEST FOR ELEVATORS | $0 |
| 2026-05-19 | JOHNSON CONTROLS FIRE PROTECTION LPFederal Prison System / Bureau of Prisons · 5 YEAR INSPECTION FIRE SPRINKLER SYSTEM | $19,536 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.