Replace Water Tanks FCI Marion Marions, Illinois: requirements and submission rules

48 requirements and 8 submission rules found in the solicitation documents for 15BGCS26Q00000077. Use them as the start of your compliance matrix.

Solicitation number
15BGCS26Q00000077
Agency
JUSTICE, DEPARTMENT OF / FEDERAL PRISON SYSTEM / BUREAU OF PRISONS / FAO
NAICS
238220
Set-aside
Small Business Set Aside - Total
Responses due
30 November 2026 (2 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Quotes shall be received on or before the deadline listed on the SF1449.
  • Quotes shall be submitted electronically via email to t8johnson@bop.gov in pdf format only and will be deemed received at the time as indicated on the email notification.
  • Request for Substitutions prior to execution of the Contract: Requests for substitutions during the solicitation period shall be made by submitting completed substitution request a minimum of twenty (20) calendar days prior to the proposal/bid due date.
  • Include project data/drawings, descriptions of methods, samples where applicable, detailed comparison of significant qualities between specified item and proposed substitution, statement of effect on construction time and coordination with other affected cost information or proposal, and statement to the effect that proposed substitution will result in overall work equal to or better than work originally indicated.
  • The Contractor shall submit a written, signed and dated RFI to the Contracting Officer.
  • Coordinate and sequence different categories of submittals for the same Work, and for interfacing units of Work, so that one will not be delayed for coordination of review with another.
  • Contract Modifications (Change Orders): When changes are made in the work that requires an equitable adjustment to the Contract, the Contractor shall submit to the Contracting Officer a written proposal for adjustment of the amount of increase or decrease.
  • Submit Special Project Warranty (Guarantee): A warranty specifically written and signed by Contractor for a defined portion of the Work and, where required, countersigned by subcontractor, installer, manufacturer, or other entity engaged by Contractor.

Requirements

IDRequirement
R1When submitting your quote, you shall consider all information provided herein.
R2Please carefully follow all instructions located on page 42 of 44 of the solicitation package concerning content, format, and submission of quotes.
R3requires that an offeror be registered in SAM when submitting an offer or quote and continue to be registered throughout the duration of the contract.
R4Quoters should include their Unique Entity Identifier Number (UEI) number in their quotes.
R5For the purposes of this solicitations, all quoters SAM registration should include NAICS code 238220.
R6Contractors must comply with FAR 52.222-54 E-Verify requirements by enrolling in E-Verify within 30 days of contract award and beginning verification within 90 days of enrollment.
R7Faxed and hand delivered quotes will not be accepted.
R8Contractor will furnish the material, professional labor services, and related items necessary to complete the work shown on the drawings as detailed in this scope of work. The contractor shall perform work as follows: Scope of Work Removal and disposal of the existing (2) jacketed storage tanks Disconnect all piping and gauges up to the first shut off valve on both tanks, remove and dispose of the existing (2) Cemline JST series jacketed storage tank units. Clean and prep the site for new storage tank units to be installed. Supply and install (2) new jacketed storage tank units with insulation and jackets Supply, deliver, and install (2) new insulated and jacketed storage tank units.Section J
R9Each unit will have a 500 gallon capacity, at least a ½” of cement lining, and all threaded openings shall be stainless steel. The exterior of the units shall be painted with a high - quality primer paint before a minimum of 3” thick fiberglass insulation is applied, in accordance with ASHRAE standards. The units will then have a minimum of 20 gauge steel jacket, with enamel paint coating. Each units coil will be 2 pass 316 stainless steel coil head, copper lined between the bolt tube sheet, with double wall copper tubes and gaskets.Section J
R10All new gauges, piping, and valves will be installed up to the first shut off valve.Section J
R11Start up will be provided after completion.Section J
R12Upon completion of the above installation, the contractor shall ensure proper operation and function of all devices, safety switches, and pressure relief valves as well as conduct a pressure test.Section J
R13The Contractor shall limit its use of the premise to the work indicated, so as to allow for Government occupancy and use. During the entire construction period, the Contractor shall coordinate use of the premises for construction operations with the FBOP Project Representative.Section J
R14All visitors to the construction site shall register with the FBOP site officials. The Contractor shall not allow employees to have personal visitors on site.Section J
R15The Contractor shall establish a normal work week schedule for the duration of the project.Section J
R16Work outside the secure perimeter of the institution will be allowed between the hours of 7:30 AM to 4:30 PM.
R17Work inside the secure perimeter of the institution will be allowed between the hours of 7:30 AM to 3:00 PM.Section J
R18Contraband: The Contractor shall inform his/her employees that intoxicating beverages, drugs, weapons, etc.., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC 1791.
R19Explosives: The use of explosives is absolutely forbidden without written authorization from the FBOP Contracting Officer upon no less than thirty (30) days advance written request.Section J
R20Cell phones, pagers, and radios are not allowed within the secure perimeter.Section J
R21Parking areas, either on or off-site will be furnished for workmen by the Contractor at a location approved by the FBOP Project Representative.Section J
R22Any temporary field office used by the Contractor shall be located in an area approved by the FBOP Project Representative.Section J
R23The Contractor shall review his or her site layout plan for staging, stockpiles, etc.., with the FBOP Project Representative. The Contractor shall maintain all staging and construction areas in a neat and orderly fashion.Section J
R24The Contractor shall provide protection of the work against weather, rain, wind, storms, frost, cold, or heat so as to maintain all work, materials, apparatus and fixtures free from injury or damage.Section J
R25Contractor employees working at a FBOP facility will be subject to a background investigation after award of the contract. Contractor employees must complete the applicable forms provided by the FBOP Project Representative.Section J
R26Contractor employees working within the secure perimeter shall wear a clearance badge issued by the institution at all times, and shall be escorted by an institution staff member.Section J
R27Tools brought into the institution’s secure perimeter will be inventoried at the beginning and end of each work day by FBOP staff. All tools used by the Contractor working within the secure perimeter shall be under constant supervision. Loss of a tool shall be reported immediately to the escorting FBOP staff.Section J
R28No explosive action tools shall be used on the property at any time.Section J
R29Materials brought inside the secure perimeter of the institution shall be limited to a one-day supply. Surplus materials that are not installed in on work day must be moved outside the secure perimeter at the end of the day.Section J
R30Contractor employees working on the FBOP site shall be required to undergo a general institution orientation on responsibilities, procedures and laws governing conduct when working at an FBOP institution.Section J
R31The Contractor shall verify all measurements and be responsible for the correctness of same. The Contractor shall layout their work and be responsible for all lines, elevations, and measurements of buildings, utilities, and other work executed by them.Section J
R32The Contractor shall carefully study and compare Contract Documents before proceeding with fabrication and installation of work. Coordinate scheduling, submittals and work to ensure efficient and orderly sequence of installation.Section J
R33In order to administer and supervise the Contract Work, the Contractor shall provide the following minimum supervisors: 1. Contractor’s Project Manager... 2. Project Field Superintendent...Section J
R34The Contractor, if requested, shall furnish an affidavit from the manufacturer certifying that material or product delivered to the project site meets requirements specified.Section J
R35The Contractor shall ensure submittals (product data, shop drawings, etc.) produced by subcontractors, vendors, or other entities are reviewed for adequacy of coordination and meeting the design intent of the construction documents prior to the submission to the Government. The Contractor shall stamp and certify that each submittal was reviewed, approved, and coordinated with the requirements of Work and the Contract documents.Section J
R36Provide permanent marking on each submittal to identify project, date, Contractor, Subcontractor, submittal name, Specification section number, and similar information to distinguish it from other submittals. Number resubmittals with original number and an alphabetic suffix.Section J
R37The Contractor shall provide a detailed Construction Schedule with activity entries for each portion of the construction work, in chronological order, cumulatively indicating the entire Contract Performance Period.Section J
R38The Construction Schedule shall be updated on a monthly basis throughout the entire Contract time and until Project Completion.Section J
R39The Contractor shall prepare a Schedule of Value (SOV) for the total project. The SOV shall be correlated to the Construction Schedule. The SOV shall be formatted per the CSI Master Format structure.Section J
R40The Contractor shall provide the following temporary provisions for the duration of the contract: 1. Temporary heating and ventilating... 2. Temporary field office... 3. Temporary sanitary facilities... 4. Temporary barriers, barricades, and similar devices... 5. Temporary tree and plant protection... 6. Temporary utilities... 7. Temporary access roads... 8. Temporary dust, erosion and sediment controls.Section J
R41The Contractor is responsible for safety and health on the project. In performing the work under this contract the Contractor shall: 1. Conform to the specific safety requirements established by this contract; 2. Comply with the safety rules of the FBOP institution that concern related activities not directly addressed in this contract; 3. Take all reasonable steps and precautions to prevent accidents and preserve the life and health of Contractor and Government personnel performing or in any way coming in contact with the performance of this contract; 4. Provide relevant MSDSs for all materials used on the project. 5. Take such additional immediate precautions as the Contracting Officer may reasonably require for safety and accident prevention purposes.Section J
R42The Contractor shall execute continual cleaning to keep building, site and adjacent properties free from accumulations of waste materials, litter, debris, rubbish, windblown debris and foreign substances resulting from construction operations.Section J
R43Remove waste materials, debris, and rubbish from premises and dispose off site in a lawful manner. Do not dispose of volatile waste such as mineral spirits, oil, paint thinner in storm or sanitary drains. Do not dispose of wastes into streams or waterways.Section J
R44Substitute products shall not be ordered or installed without written acceptance of Contracting Officer.Section J
R45Deliver, handle, and store products in accordance with manufacturer’s recommendations and by methods and means that will prevent damage, deterioration, and loss, including theft, and protect against damage from climatic conditions.Section J
R46In accordance with FAR 52.246.21 Warranty of Construction, and in addition to any other warranties in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or workmanship performed by the contractor or any subcontractor or supplier at any tier. The warranty shall continue for a period of one (1) year from the date of Project Substantial Completion.Section J
R47The Contractor shall diligently complete all punch list items before a Final Inspection is scheduled.Section J
R48the final application for payment shall include affidavits that all bills have been paid.Section J

Recent awards in NAICS 238220

The newest federal contract awards in the same industry code from Department of Justice, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-10-19KOVACS CONSTRUCTION CORPORATIONFederal Prison System / Bureau of Prisons · REPLACE FIRE PUMP$592,954
2026-10-15MECHANICAL COOLING SERVICES, LLCU.S. Marshals Service · MISSION CRITICAL - APPREHENDING FUGITIVES SOG: EMERGENCY CHILLER REPAIRS *LES* CF: APC-FY27-000001$20,000
2026-10-14MECHANICAL COOLING SERVICES, LLCFederal Prison System / Bureau of Prisons · 25Z5AJ7-FCC POLLOCK- EMERGENCY REPLACE CHILLER NO. 2 AT FPC DORM 1 HVAC UNIT EO 14398$98,000
2026-10-02WATER SOFTENER SERVICES LLCFederal Prison System / Bureau of Prisons · 26Z5AZ2 - EMERGENCY REPAIR WATER SOFTENER DOC BPQ 15B50126PR000342 RESERVED ON 07/20/2026$26,926
2026-10-01TRANE U.S. INC.Federal Prison System / Bureau of Prisons · CONTRACTOR TO PROVIDE SERVICES TO THE CHILLER BLDG. 5756 (26Z2BD8)$87,425
2026-10-01INSPARISK, LLCFederal Prison System / Bureau of Prisons · INSPARISK, LLC. FOR BOILER. FIELD NOTICE #0007 MANDATORY USE OF NATIONAL CONTRACT 15BNAS21D00000165 BOILER INSPECTION SERVICES. THE PERIOD OF PERFORMANCE FOR A 6 MONTH EXTENSION IS OCTOBER 1, 2026 MAR$20,000

Source: USAspending.gov, retrieved 2026-10-30. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.