TenderAxiom

TenderAxiom · Opportunities

Y--EAST CANAL EFFICIENCY IMPROVEMENTS: requirements and submission rules

19 requirements and 15 submission rules found in the solicitation documents for 140R4026R0025. Use them as the start of your compliance matrix.

Solicitation number
140R4026R0025
Agency
INTERIOR, DEPARTMENT OF THE / BUREAU OF RECLAMATION / UPPER COLORADO REGIONAL OFFICE
NAICS
237110
Set-aside
Small Business Set Aside - Total
Responses due
20 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • The following must be included in the cover page: ▪ Full Name of Company ▪ Main Contact for the Project Including Phone Number and Email Address ▪ Company Address ▪ Company Phone Number (if different from Main Contact) ▪ Company Unique Entity Identifier (UEI – previously DUNS) ▪ Company DUNS and Tax ID Number (for construction reporting) ▪ Company Cage Code, and ▪ Company SAM Expiration Date; b.
  • (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management which can be accessed via https://www.sam.gov (see 52.204-7).
  • All questions shall be received no later than close of business on October 23rd, 2026 to allow Reclamation adequate time to prepare and issue responses to all Offerors prior to the date and time set for receipt of proposals.
  • The electronic copies of the proposal shall be submitted in a format readable by Microsoft Office 365 Suite, and Adobe Acrobat 2017 programs.
  • Directions for submitting electronic copy of proposal: Primary: Kiteworks Electronic Proposal Instructions No later than November 20, 2026, at 1pm MT, the entire below process shall be completed.
  • It is suggested that you do not wait too close to the proposal due date/time to complete this process.
  • Any reference to a page limitation shall conform to the following requirements: a.
  • Print size shall be a minimum of 12-point Times New Roman font d.
  • Margins shall be no less than ½” e.
  • Page limitations shall be treated as maximums.
  • The bar chart shall be printed legibly (approximately 10pt font or larger) in color on 11x17 sized paper or larger (plotted).
  • On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed. f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date).
  • (f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraphs (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.
  • (2) In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing.
  • (j) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications.

Requirements

IDRequirement
R1Offerors shall complete the Price Schedule. Offers that do not include all completed Price Schedule CLIN items will be considered non-responsive and will not be evaluated for award.B.1
R2The following listed items must be provided and will be retained and applied to modification actions if applicable: a. – Overhead Rate, b. – Profit Rate, c. – General and Administrative (G&A) Rate if applied/applicable, d. – Pass-Through overhead and profit rates for subcontractors.B.1
R3The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The amount of the bid guarantee shall be 20 percent of the bid price or $1 million, whichever is less.Section L (instructions to offerors)
R4Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
R5Do not submit an offer unless— (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has (i) Waived application under 22 U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b).Section K (representations)
R6The proposal shall consist of three (3) physically separated volumes, individually entitled as stated below. The page limit for Volume II is 30 pages, excluding title pages, table of contents, resumes, and letters of commitment.L.8
R7To permit objective evaluation of the technical proposal, no cost or price information shall be included in the business proposal or technical proposals (Volumes I or II). Offerors shall provide a complete schedule and price proposal (Volume III).L.8
R8In accordance with 1452.215-71 Use and Disclosure of Proposal Information -- Department of the Interior provision of this solicitation, offerors shall mark trade secret, or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend 'Proprietary Information.'L.8
R9Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation, or specifications, to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation.L.8
R10Technical proposals shall NOT exceed thirty (30) pages. The 30-page limit does not include cover pages, table of contents, tabs, glossaries, resumes, drawings, diagrams, and organizational charts. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the technical proposal: (a) Cover Page... (b) Table of Contents... (c) Index... (d) Enclosures... (e) Executive Summary.L.8
R11Evaluation Factor 1 - Technical Approach: In narrative form, succinctly explain the strategy and technical approach plan for accomplishing the work. The narrative shall not conflict with Factor 2 – Comprehensive Construction Schedule. The technical approach plan shall include, but is not limited to the following: Performing dewatering operations upstream of locations for new cast-in-place concrete diversion structure... sequencing of installing the 36” HDPE pipeline alignment... dewatering operations upstream of locations for new cast-in-place concrete structures... Demolishing and disposing of the existing pipe flume at the Loutzenhizer Arroyo; Installing the two (2) 54” HDPE pipes underneath the Loutsenhizer Arroyo... Placing new cast-in-place concrete structures... Providing sequencing of installing the 48” and 42” polypropylene pipeline alignment... Removal of existing concrete and placement of new concrete for spillway pipeline outlet... Sourcing and installing metalwork... The plan shall describe proposed methods, type, and details of equipment to be utilized, composition of crews and identify anticipated subcontractors and suppliers. Provide drawings or sketches of how the staging areas will be utilized throughout the course of the project. The plan shall list any potential problems and proposed solutions or state specifically that there are no potential problems anticipated.L.8
R12Minimum Key Personnel Qualifications: Note: The following key personnel shall be separate individuals and shall not be combined. (i) Onsite Project Superintendent: A minimum of seven (7) years of relevant experience is required for this position. A minimum of three (3) years of relevant experience must be specialized... A minimum of four (4) years of experience of progressively more responsible construction experience. (ii) HDPE Welder(s): A minimum of five (5) years of relevant experience in HDPE welding construction activities is required for this position. (iii) Concrete Foreman: A minimum five (5) years of experience is required on projects of similar complexity and magnitude with experience in scheduling crews, equipment, and concrete placements, setting formwork and installing reinforcing steel.
R13Provide: Resume information, which includes previous jobsite responsibilities on major contracts for individuals who will occupy the key functions on this project. The resumes shall be limited to three (3) pages. The resume shall include the following information: NAME, ADDRESS, TOWN, STATE ZIP CODE, EDUCATION BACKGROUND, REGISTRATIONS AND CERTIFICATIONS, SPECIALIZED EXPERIENCE (EMPLOYER’S NAME(S), DATES OF EMPLOYMENT, PROJECT NAME(S), POSITION(S) HELD, DATES OR DURATION), GENERAL EXPERIENCE (EMPLOYER’S NAME(S), DATES OF EMPLOYMENT, PROJECT NAME(S), POSITION(S) HELD, DATES OR DURATION).L.8
R14The offeror shall include a Letter of Commitment for all key personnel and subcontractors listed above.L.8
R15The offeror is requested to furnish a list of Federal, State, local government or commercial projects similar in scope, complexity, and magnitude to the work required under this solicitation, which the offeror or their subcontractors have worked on within the last 10 years... Provide the following information for each project: Name and location of project; Description of work; Original completion time and date, and actual dates and duration of each project; Name, address, and telephone number of owner; Initial contract amount and final contract amount (including modifications); Percentage of work self-performed or subcontracted; Any problems encountered in performance of the work and corrective action(s) taken; Name, telephone, and email address of at least one reference from the acquiring customer who may be contacted for further information.L.8
R16For the Government to consider the relevance of a subcontractor’s past performance, the offer shall include a Letter of Commitment from that subcontractor.L.8
R17The offeror is requested to provide each reference with a copy of the Past Performance Questionnaire (PPQ) in Section J and have the reference return the PPQ to the Bureau of Reclamation in accordance with instructions at the end of the form.L.8
R18Submit a pre-qualification letter from a surety (not a bonding agent), that is listed on the Bureau of the Fiscal Service List of Certified Companies that can be found at https://fiscal.treasury.gov/surety-bonds/list-certified-companies.html. Offeror shall be bonded for a minimum single project amount of the proposed amount plus an additional 15% (e.g., proposal is $10M, must be bonded for $11.5M). Aggregate bond capacity shall also be submitted for evaluation. Ensure insurance policy will conform with the minimums in FAR 28.307-2 “Liability” prior to any award decision.L.8
R19Pricing Proposal at a minimum shall include: 1) Filled out/Completed Schedule B within this RFP with all Unit Prices; 2) Pricing Assumptions... 3) The following listed items will be retained and applied to modification actions if applicable... a. – Overhead Rate, b. – Profit Rate, c. – General and Administrative (G&A) Rate if applied/applicable, d. – Pass-Through overhead and profit rates for subcontractors, e. – Equipment Rates – per piece of equipment, f. – Labor Rates... 4) Total Price Marked Clearly with no confusion as to the total amount considered by the offeror to be the Total Price.

Recent awards in NAICS 237110

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-25CLASSIC SITE SOLUTIONS INCNational Park Service · MINUTE MAN NHP - DOMESTIC WATER IMPROVEMENTS$378,419
2026-09-25WILLIAMS DIVERSIFIED LLCU.S. Fish and Wildlife Service · EO 14398 - DRAINAGE PIPE REPLACEMENT PROJECT AT ALCHESAY NFH$169,963
2026-09-25ALEXANDER PUMP & SERVICES INCU.S. Fish and Wildlife Service · USFWS FLINT HILLS NWR, KS - PUMP REPLACEMENT$299,222
2026-09-25PER-GEESH RITZ JV, LLCDepartmental Offices · NPS COMFORT STATION BELLE HAVEN$1.19 million
2026-09-24CHANCEY CHAMBERSNational Park Service · DEVA-CONDUIT AND LIFT STATION REHABILITATION STOVEPIPE WELLS PRODUCTION WELL COYOTE LOOP LIFT STATION FURNACE CREEK CAMPGROUND LIFT STATION$144,750
2026-09-24KANANEN EXCAVATION LLCBureau of Land Management · 2026 MARCOTT COULEE PIPELINE$375,000

Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.