Z--SLV-CB PUMPING PLANT ROOF: requirements and submission rules
9 requirements and 7 submission rules found in the solicitation documents for 140R4026Q0141. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Complete proposals shall be emailed to Contract Specialist, Ronda Lucero, ronda_lucero@ios.doi.gov no later than Monday, November 2, 2026, by 1:00 p.m.
- Offerors must submit complete proposals by the revised due date.
- This amendment does not extend the proposal due date.
- (A) QUANTITY (C) NSN 7540-01-152-8067 140R4026Q0141/0004 The purpose of this Amendment 0004 is to extend the proposal due date.
- The proposal due date is hereby extended from November 2, 2026, to November 10, 2026, at 1:00 p.m.
- Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers.
- Acknowledgement: Offerors shall acknowledge receipt of Amendment 0003 in their submission.
Requirements
| ID | Requirement |
|---|---|
| R1 | If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. |
| R2 | Roof Repair or Replacement as per the Statement of Work. |
| R3 | Date Bond Executed (Must be same or later than date of contract) |
| R4 | Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. |
| R5 | Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed. |
| R6 | When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated "Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bonds, provided that the sum total of their liability equals 100% of the bond penal sum. |
| R7 | When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability. |
| R8 | Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the words "Corporate Seal", and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals. |
| R9 | Type the name and title of each person signing this bond in the space provided. |
Recent awards in NAICS 238160
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-26 | ARK CONSTRUCTION MANAGEMENT LLCNational Park Service · 140P4526C0032: REHABILITATION OF ROOFS - BUILDING 40, SANDY HOOK UNIT, GATEWAY ANTIONAL RECREATION AREA, FORT HANCOCK, NJ | $695,000 |
| 2026-09-25 | JB CONTRACTING INCU.S. Fish and Wildlife Service · EO 14398 - CHARLES RUSSELL NWR FT PECK BUNKHOUSE ROOF REPLACEMENT 10/01/2026 TO 04/30/2027 | $86,500 |
| 2026-09-24 | J & G SOLUTIONS LLCNational Park Service · EO 14398 CONSTRUCTION, ROOF REPLACEMENT FOR THREE STRUCTURES AT CANAVERAL NATIONAL SEASHORE | $303,500 |
| 2026-09-24 | MFS CONSTRUCTION LLCDepartmental Offices · THE WORK OF THIS CONTRACT INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, AND RELATED OPERATIONS NECESSARY TO COMPLETE THE REPLACEMENT OF THE TERRA COTTA TILE ROOF AND THE REPAIR, CONSERVATION, OR | $870,740 |
| 2026-09-23 | CORPORATE VISION, INC.Bureau of Land Management · MISSOULA FIELD OFFICE RENOVATION | $274,409 |
| 2026-09-23 | GOVCREST INCU.S. Fish and Wildlife Service · POCOSIN LAKES NWR ROOF REPAIR OF FIELD STATION | $4,760 |
Source: USAspending.gov, retrieved 2026-11-02. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.