TenderAxiom

TenderAxiom · Opportunities

Y--MORA-ADM NEW CAMP MUIR GUIDE BLDGS: requirements and submission rules

59 requirements and 0 submission rules found in the solicitation documents for 140PP027R0015. Use them as the start of your compliance matrix.

Solicitation number
140PP027R0015
Agency
INTERIOR, DEPARTMENT OF THE / DEPARTMENTAL OFFICES / NATIONAL PARK SERVICE CONTRACTING ACTIVITY
NAICS
236220
Set-aside
Small Business Set Aside - Total
Responses due
10 December 2026 (12 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • None detected automatically: read the instructions to offerors.

Requirements

IDRequirement
R1Any request for payment for off-site stored materials must be supported by documentation acceptable to the Government, which may include evidence of title, invoices, proof that the materials are dedicated to this contract, storage location information, insurance coverage, inventory records, photographs, tagging/segregation, and Government inspection access, as applicable.
R2Conduits should be provided for future PV load-centers and grounding. All electrical in current build will need to be grounded per code.
R3Any method of lightning protection grounding is acceptable if code compliant.
R4Any method maintaining compliance with Section 264100 and the UL/LPI certification requirements.
R5Each structure should have its own stand-alone interconnected system. Communication between structures is not required or recommended.
R6The following absolutely need to be bonded/grounded: structural steel/metallic framing, anything associated with mounting or supporting PV system components, and any metallic paneling/framing/components that support conduit/cables/fixtures/electrical equipment of any kind.
R7Any rebar or metallic components that are to become encased in concrete or part of the foundation need to be bonded.
R8Any connections that are to be encased or concealed (as part of the foundation or anywhere else in the structure) need to be inspected prior to concealment, as with all electrical components.
R9Any connections that are not permanent (i.e. irreversible crimp or exothermic welding) need to remain accessible after construction for ongoing inspection.
R10Detailed photos shall be taken of all electrical work to be concealed.
R11Safety Manager to develop and monitor, adapt as needed, the progress of established SSSP at Heli site and Construction site.
R12Heavy lift helicopter use is permitted with short or long-haul line provided the heavy lift begins and ends outside of the park boundaries (e.g., private airstrip, USFS lands), and maintains altitude of 2,000 ft or greater as it passes through the park to preserve NPS requirements related to Endangered Species Act.
R13Additionally, this project will require extensive coordination/communication with the Park (PAM) to ensure that contracted end-product aviation does not conflict with Park emergency and project aviation resources.
R14Contactors are not required to provide the exact product but should be equivalent to or better. As long as materials meet specifications then they can be provided as a material submittal after award for approval.
R15proposals should be submitted as work is stated.
R16Allow National Park Service staff to access the construction site or staging areas for any required resource monitoring, as coordinated by the CO/COR.
R17Chinook-47/Vertol 234 Chinook helicopters are not approved for operations out of Kautz or Ricksecker to minimize effects on special status wildlife species. Helibases outside the Park may be used as approved by the CO/COR.
R18All flights shall maintain at least 2,000 ft above ground level except during takeoff/ landing or as required for safety.
R19Helicopter lifts shall be accomplished with aircraft capable of safely operating at Camp Muir.
R20All vehicles/equipment must have functioning mufflers. Unmuffled compression brakes are prohibited.
R21Use of air horns is prohibited except for emergencies.
R22Limit idling of vehicles and equipment to 15 minutes except for safety/mechanical needs.
R23Report all wildlife collisions ("roadkill") to the park within 1 hour.
R24Feeding or approaching wildlife is prohibited.
R25Notify the CO/COR of bear, fox, wolverine, or wolf activity near helibases or project areas.
R26Implement a litter control program; store food in wildlife resistant containers.
R27Avoid mapped rare lichen areas at Camp Muir per maps will be provided by CO/COR.
R28Use the quietest equipment and methods feasible to accomplish the work.
R29Work below 4800 ft elevation must occur during daylight hours from March 15 through September 30.
R30Work below 3800 ft elevation occurring from April 1 through Sept 23 must occur no earlier than two hours after official sunrise and will stop at least two hours before official sunset.
R31Nighttime construction is prohibited.
R32Weed free certification. All material sources and materials incorporated into the work must be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state or local public agency.
R33Provide noxious weed-free certification for all imported aggregate, borrow, bedding material, riprap and erosion control materials that are capable of harboring noxious weed seed.
R34All components are to be inspected in the State/Province of origin by authorized officials.
R35Submit material certifications to the CO &COR for approval at least 14 days prior to their use in the work.
R36Quarry materials shall be recently harvested and processed from areas with lowest risk of weed contamination. Materials that have been stored in stockpiles for more than one growing season are prohibited from use in the project.
R37M aterials shall be covered before leaving quarry to keep out wind -borne weed seed.
R38If a source is not certified weed free, heat all materials to 300º F prior to entering Park boundaries.
R39Do not stockpile the materials outside of Park boundaries before delivery. Deliver materials directly to the Park.
R40Hauling vehicles shall be cleaned prior to material loading, and truck exteriors shall be cleaned prior to entry into park.
R41Use sources that fulfill the contract quantity and quality requirements. Determine the quantity, type of equipment, and work necessary to select and produce an acceptable material. Secure permits and clearances for use of the source and submit copies of the documents to the CO.
R42Activities outside the construction limits that will require ground disturbance, occupation, clearing, or other environmental impacts are limited to the following: helibase
R43Proposed activity description. Submit a description, schedule, and location of the proposed activities for approval by the CO &COR. Include maps of the area and other relevant information.
R44Cultural resources. Submit written documentation satisfactory to the CO &COR for a recommendation of either "no historic properties affected" or “no effect” according to 36 CFR 800.4(d)(1) for historic properties on or eligible for listing to the National Register of Historic Places.
R45Species protected under the Endangered Species Act of 1973. Submit written documentation satisfactory to the CO that the proposed action will have no effect to any threatened or endangered species or their critical habitat.
R46Before use of sites on federal lands, submit a copy of the Letter of Approval or Special Use Permit from the applicable federal agency allowing use of the site for intended purposes.
R47Tribal, state and local approvals. Comply with applicable laws regarding the proposed activities. Submit copies of required clearances, including hazardous waste compliance, tribal, State and local permits and approvals.
R48Water necessary for construction will be obtained from commercial sources or as directed by the CO. Water may be flown in if required. No water may be drawn from streams or natural waterbodies.
R49Provide list of proposed sources, end uses, and temporary storage requirements 14 days before delivery.
R50Material will be hauled directly from source to Mount Rainier National Park staging area(s) without interim stockpiling or as approved by the CO/COR.
R51Imported material must be free of contaminants.
R52NPS will provide sample rock; contractor samples require COR approval.
R53Remove dirt, plant, and foreign material from vehicles and equipment before entry into Mount Rainier National Park.
R54Prevent introduction of noxious weeds and non-native plant species into the work site.
R55Follow applicable Federal land management agency requirements and state requirements.
R56Maintain cleaning and inspection records.
R57Clean hauling vehicles before their initial entry; subsequent entries will not require cleaning unless requested. Notify the CO/COR a minimum of 48 hours before entry to allow for inspection.
R58Loads must be covered during transport.
R59Prevent contamination of staged materials by weeds or weed seeds.

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-04JAMII DEVELOPMENT LLCDepartmental Offices · WV-CANAAN VLY NWR-CHAIN LINK FENCE$18,000
2026-11-03HUOT CONSTRUCTION AND SERVICES, INC.Departmental Offices · MAINTENANCE BLDG REPAIRS AT LITCHFIELD WETLAND MGMT DISTRICT$308,540
2026-10-29HAGGARDS EXCAVATING LLCDepartmental Offices · MO-NEOSHO NFH-MIXING BOX EMERG REPAIRS$20,000
2026-10-26COELHO, INC.Departmental Offices · RED ROCK ADMIN BUILDING PHASE 2 REPAIRS$798,680
2026-10-22BURTON CONSTRUCTION, INC.Departmental Offices · MT-CHARLES M RUSSELL NWR ROOF HQ SHOP$53,608
2026-10-20HESS CONTRACTING LLCDepartmental Offices · EO 14398 ID-KOOTENAI NWR-STRIP AND PAINT EXTERIOR OF EE BUILDING$35,035

Source: USAspending.gov, retrieved 2026-11-06. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.