JELA 325250 335621 - Rehabilitate Cemetery: requirements and submission rules
27 requirements and 1 submission rules found in the solicitation documents for 140PP027R0004. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror." SURETY B NAME & ADDRESS STATE OF INCORPORATION LIABILITY LIMIT ($) SIGNATURE(S) NAME(S) & TITLE(S) (Typed) 1.
Requirements
| ID | Requirement |
|---|---|
| R1 | If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. |
| R2 | If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. |
| R3 | For Technical Volume I: 1. Experience Questionnaire 2. Subcontractor Reference 3. Key Personnel Qualifications 4. Past Performance Questionnaire |
| R4 | For Business & Price Volume II: 1. SF 24 Bid Bond 2. Contract Bid Schedule 3. General References 4. Report on Limitation on Subcontracting 5. Proposed Equals |
| R5 | Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. |
| R6 | List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor. |
| R7 | The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly. |
| R8 | It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. |
| R9 | Offeror to complete Sections A and B and transmit questionnaire to reference. Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E. |
| R10 | The contractor shall not be permitted to use any information provided in this questionnaire to publicize, or otherwise circulate, promotional materials that state or imply Governmental, organizational, group, expert, or individual endorsement or consumer testimonial of a product, service, or position which the contractor represents |
| R11 | Return by December 10, 2026 Name Carlos Garcia Title Contracting Officer Organization National Park Service Email carlos_garcia@ios.doi.gov |
| R12 | DATE BOND EXECUTED (Must not be later than bid opening date) |
| R13 | Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. |
| R14 | Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. |
| R15 | When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum. |
| R16 | When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. |
| R17 | Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals. |
| R18 | Type the name and title of each person signing this bond in the space provided. |
| R19 | Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. |
| R20 | On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. |
| R21 | Round totals and extended prices to whole dollars. |
| R22 | In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation. |
| R23 | This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000. |
| R24 | If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below |
| R25 | In accordance with Provision 52.211 -06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. |
| R26 | By submitting the proposed equal, the Contractor certifies that it: 1. Has investigated the proposed item and determined that it is equal or superior in all respects to the specified Salient Characteristics; 2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified; 3. Has determined that the proposed item is compatible with interfacing items; 4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution; and 5. Waives all claims for additional expenses that may be incurred as a result of the substitution. |
| R27 | The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials. |
Recent awards in NAICS 237990
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-19 | HSG PARK JOINT VENTURE 3, LLCDepartmental Offices · KNRI 257081 - KNIFE RIVER INDIAN VILLAGE NATIONAL HISTORIC SITE - ELBEE BEND BANK STABILIZATION | $7.53 million |
| 2026-10-08 | STUBBS & STUBBS OILFIELD CONSTRUCTION, INC.Departmental Offices · PARIETTE WETLAND FLOOD CONTROL DAM | $19,836 |
| 2026-09-30 | TERRA SITE CONSTRUCTORS LLCNational Park Service · C&O CANAL NATIONAL HISTORICAL PARK - FY26 REPAIR TO INLET LOCK 2 | $2.01 million |
| 2026-09-25 | T.X.C.S. SERVICES LLCNational Park Service · BOARDWALK REPLACEMENT AT FORT FREDERICA NATIONAL MONUMENT (FOFR) | $82,500 |
| 2026-09-24 | BAYSIDE-ERRG JVBureau of Land Management · CERCLA RED MOUNTAIN WASH II | $2.34 million |
| 2026-09-24 | DOYON TECHNICAL SERVICES, LLCBureau of Land Management · GARNET HILL RECREATION AREA CONSTRUCTION | $4.68 million |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.