W--Portable Toilet Services - ZION National Park: requirements and submission rules
17 requirements and 13 submission rules found in the solicitation documents for 140PP027Q0019. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- SUBMISSION REQUIREMENTS Closing Response Date/Tim e: Quotes are due by 10 December 2026 @ 12PM MT Contact Point or Contracti ng Officer: Cole Johnson - email – Cole_Johnson@ios.doi.gov SITE VISIT A site visit has been scheduled for 11/12/2026 at 10AM Mountain Time.
- The offerors shall submit a quote to the contract specialist by email to: Cole_Johnson@ios.doi.gov by the due date/time prescribed on the SAM.Gov announcement.
- Note: Please keep a lookout for Solicitation Amendments on Sam.Gov which may revise this due date.
- NOTE: Please check SAM.gov regularly in any case an amendment was posted, as this amendment must be reviewed, acknowledged by signing the SF30 and ensuring that it is provided with your final quote/proposal package.
- Extend the Quotes Due Date to 12/10/2026 by 12PM Mountain Time.
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers.
- To be considered for award your company must obtain a Unique Entity Identifier (UEI).
- Your company must also be registered in the System for Award Management (SAM) and be considered a small business for the size standard associated with the NAICS code found in block 10 on page one (1) of this solicitation, and this registration must be “active” in SAM at the time of quote/proposal close date/time - as well as, at the time of award and throughout the entire award/contract performance.
- All interested parties shall be registered in the System for Award Management or SAM at time an offer or quotation is submitted.
- Submit all required documents via email by the date and time listed in this solicitation.
- Under this contract, the following documents are required to be submitted as an attachment to the IPP
- 140PP027Q0019 Portable Toilet Service - ZION AMENDMENT 02 Questions regarding this solicitatio n: Questions must be submitted in writing using the attached Q&A document.
Requirements
| ID | Requirement |
|---|---|
| R1 | If attending [the site visit], please email the COR Matthew McKay at Matt_MacKay@nps.gov and include the names and company each represents in said email. |
| R2 | Please include Total Pricing on the 1449 Schedule & Breakdown Pricing on the Monthly Schedule Attachment. |
| R3 | Offers shall submit the following information in its entirety: a) CHECKLIST FOR QUOTE SUBMITTAL: Checklist for Quote Submittal – the checklist is this page of the solicitation completed as the first page in the package; Signed acknowledgement of SF1449; Signed amendments if applicable; Price Schedule – complete the attached price schedule on the 1449 itself, updated as of Amendment 02; Pricing Sheet – complete the attached detailed pricing sheet, updated as of Amendment 02; Completed Provisions in this solicitation as applicable; Submit Technical Factor 1 – Draft Schedule; Submit Technical Factor 2 – Product Data; Submit Technical Factor 3 – Operations Plan; Limitations on Subcontracting WS – Complete the limitations on subcontracting sheet IAW the Limitations in Subcontracting Clause. |
| R4 | Offers shall submit the following information in its entirety: b) Contractor Core Data: Offerors Company Name; Cage Code / Offerors Unique Entity Identifier (UEI); Offerors POC; Offerors POC Email/Phone |
| R5 | Completed 1449 Price Schedule. Insert total unit price and/or amount, in reference to ALL line items listed. Must ensure that this document is not edited for any reason (outside of adding units of measure, quantities, etc…) and the unedited Price Schedule is provided with final pricing – if needing to make edits or alter the document, provide an addendum outlining these changes or additional information wanting to make apparent to the evaluators. |
| R6 | Completed “Monthly Price Schedule” attachment. Include the price for each unit on a monthly basis using the attached schedule. Include pricing for the base year and all option years. |
| R7 | Submit a Technical Volume comprising of all Technical Factors stated under this solicitation, for Technical Evaluation. |
| R8 | Submit a Limitations On Subcontracting Worksheet (or equivalent) demonstrating your firm’s adherence to the 50% limitations on subcontracting applicable to this Service requirement. 50% of the contract must be completed by a Small Business unless the business is a “Similarly Situated Entity.” |
| R9 | Technical Factor 1 – Draft Schedule: Contractors are instructed to submit a draft schedule, with delivery starting 1 January 2027, commensurate with the requirements for different toilet deliveries/maintenance established in the Statement of Work. To be considered Technically Acceptable: The Schedule clearly show relevant dates/milestones for delivery and closely matches the Statement of Work’s requirements for the Base Period and subsequent Option Periods. |
| R10 | Technical Factor 2 – Product Data: Contractors are instructed to submit the product, manufacturer, and part number (if available) demonstrating the portable toilet types to be used. To be considered Technically Acceptable: The quote clearly demonstrates the product, manufacture, and part number (if available) whereby the government can ascertain the type of portable toilets being delivered. |
| R11 | Technical Factor 3 – Operations Plan: Contractors are instructed to devise an Operations Plan the contractor will follow for the duration of the contract. The Plan shall include: i. Contingency plans detailing how the contractor will provide additional toilets, if requested by the NPS, and how much time such deliveries will likely take. Include any required notice times, prep times, and delivery estimates herein... ii. Contingency plans detailing how quickly the contractor can re-locate established toilets, on site, at the needs of the NPS. Please include technical details of what such changes may require (from both contractor and government). iii. Plans for maintenance. Include how often the toilets require maintenance. iv. Plans for replacement. Include any plans for replacement of a portable toilet that has otherwise been damaged or is no longer in service. Be specific about how long it might take to get a new toilet in place and operational. |
| R12 | The Offeror represents that— (1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and (2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months. |
| R13 | If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation. |
| R14 | Independently, and not as an agent of the Government, the contractor/vendor shall furnish all labor, materials, and equipment necessary to provide portable toilet service at ZION. |
| R15 | The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows: $100,000.00 each person, $500,000.00 each occurrence, $500,000.00 property damage. |
| R16 | The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work. |
| R17 | The contractor is prohibited from utilizing All-Terrain Vehicles (ATV)s on National Park Service lands. |
Recent awards in NAICS 562991
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-09-22 | SUNTIFF, LLCBureau of Land Management · HIGH COUNTRY VAULT TOILET PUMPING | $50,000 |
| 2026-10-29 | MARSHALL'S SANITATION SERVICES LLCDepartmental Offices · SAND MOUNTAIN RECREATION AREA - EMERGENCY DISTRICT-WIDE PORTABLE TOILETS | $5,215 |
| 2026-09-26 | HOMELAND HUB CONSULTING LLCNational Park Service · SEPTIC TANK/VAULT TOILET PUMP OUTS | $87,162 |
| 2026-09-25 | M & M TRANSFER, INC.Bureau of Land Management · THE BUREAU OF LAND MANAGEMENT (BLM), WYOMING STATE OFFICE, PINEDALE FIELD OFFICE, INTENDS TO SOLICIT FOR VAULT PUMPING SERVICES AT DESIGNATED REMOTE RECREATION SITES. THE CONTRACTOR SHALL PROVIDE ALL | $9,385 |
| 2026-09-25 | SUNTIFF, LLCU.S. Fish and Wildlife Service · OR-SHELDON-HART MTN NWR CX-THE U.S. FISH AND WILDLIFE SERVICE REQUIRES COMMERCIAL VAULT TOILET PUMPING SERVICES ON AN AS-NEEDED BASIS AT SHELDON NATIONAL WILDLIFE REFUGE, DENIO, NEVADA. THE REQUIREMEN | $16,050 |
| 2026-09-25 | JM PORTABLE RENTALS LLCU.S. Fish and Wildlife Service · HI-PACIFIC ISL FWO-PORTABLE RESTRM RENTAL AND MAINTENANCE | $2,100 |
Source: USAspending.gov, retrieved 2026-11-10. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.