Z--SACN Replace Fire Alarms and Intrusions Systems: requirements and submission rules
62 requirements and 15 submission rules found in the solicitation documents for 140PP027B0002. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application: A.
- Submit to Engineer copy of engineering judgement, sealed, signed, and dated by Supplier’s design professional, together with documentation of approval or acceptance by Authority Having Jurisdiction.
- Contractor shall submit work schedule and coordinate with the NPS to allow the park to provide the services of security guards for purposes of maintaining fire watch and building security unless indicated otherwise.
- Prior to site mobilization, if material storage and staging areas are needed, the contractor must submit a storage and staging plan to NPS for approval.
- The following items shall be submitted a minimum of one week prior to the Preconstruction Conference.
- A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
- Where Contractor proposes providing firestopping materials or assemblies that have not been fire tested (including but not limited to, firestopping materials or systems that do not have a UL listing), Supplier shall prepare engineering judgement, submit to, and obtain approval or acceptance by authority having jurisdiction.
- Submit to Engineer documentation demonstrating installer’s compliance with qualifications requirements of this provision.
- These written certifications shall be submitted to the Engineer and shall signify that the total electronic system is operationally tested and ready for final acceptance testing by the Engineer.
- All testing plans must be submitted to the AHJ at least 14 days prior to testing for review and approval.
- Submit documents after design has been approved by Authority Having Jurisdiction (AHJ).
- If required by state regulations, a Professional Fire Protection Engineer shall seal Drawings submitted to the AHJ.
- Submit documentation to demonstrate contractor qualifications: a.
- Submit digital copy electronically (PDF preferred) of all required documents.
- Submit completed as-built drawings (1 hard copy, 11”x17”, and an electronic copy in PDF format, along with updated AutoCAD files (.dwg)) upon project completion, reflecting all final construction conditions (refer to Division 28 Specifications for additional information).
Requirements
| ID | Requirement |
|---|---|
| R1 | The Contractor shall complete the price schedule (provided as a separate document) and include it with their formal bid proposal. |
| R2 | Work shall be completed within 304 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 7 weather days. |
| R3 | Upon contract award, the Contractor shall develop a schedule sequencing plan that outlines demolition and new construction activities and submit it for approval before commencing work. |
| R4 | If the Contractor requires changes to the approved schedule, they shall notify the CO and COR at least 7 days in advance, providing an updated schedule along with documentation/justification supporting the proposed changes and an assessment of potential project impacts for reapproval. |
| R5 | Contractor shall provide a Dust Management Plan for Lower District Headquarters and Visitor Center, see housekeeping section herein and Contract Drawings for detailed requirements. |
| R6 | Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies to coordinate proposed locations, times for excavation and request location services prior to any digging operation. |
| R7 | Contractor shall be responsible for locating and preventing damage to known utilities. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the NPS. |
| R8 | Notify CO and COR not less than two business days in advance of proposed utility interruptions. |
| R9 | Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work. |
| R10 | Dust and debris (including ceiling tile debris) shall be vacuumed and cleaned back to original condition, daily or prior to moving to another work area/room. |
| R11 | Send a report of the weights and categories of construction and demolition waste, and recycling to the COR for entry into the NPS Solid Waste Management Data Base. |
| R12 | As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports. |
| R13 | No grinding, welding, or hot operations requiring a permit shall be conducted onsite. |
| R14 | Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof. Travel distance from any workstation to nearest extinguisher shall not exceed 75 feet. |
| R15 | Where used, sealants, adhesives, paints, coatings, and other similar materials shall be low VOC materials. |
| R16 | Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) |
| R17 | At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment. |
| R18 | All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR. |
| R19 | Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. |
| R20 | Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR. |
| R21 | Forward submittals to Contracting Officer and COR at least 15 days before need for approval |
| R22 | Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. |
| R23 | Contractor shall complete the Punch List within 30 calendar days, or a time directed by the CO. |
| R24 | Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year. |
| R25 | Entities that select and install firestopping materials and assemblies shall possess one or more of the following as current, valid accreditations: 1) Hilti Accredited Firestop Specialty Contractor (HAFSC), or 2) Firestop Contractors International Association (FCIA) Levels 1 – 4. |
| R26 | In addition, entity selecting and installing firestopping materials and systems shall possess one or more of the following as current, valid certifications: 1) Approved Firestop Contractor in accordance with FM4991. 2) Qualified Firestop Contractor by UL Solutions. |
| R27 | Install firestopping labelling permanently to surfaces of penetrated construction on both sides of each firestop system installation where labels will be readily visible. Provide identification in accordance with FCIA MOP and FM 4991. |
| R28 | Sealant applicator shall have minimum five years experience using products specified on projects with similar scope. |
| R29 | Submit certification from sealant manufacturer stating product being used is recommended for and is best suited for joint in which it is being applied. |
| R30 | Hollow metal door and frame manufacturer must be current member of SDI, and NAAMM (HMMA). |
| R31 | Flush wood door manufacturer must have minimum 10 years of experience in manufacturing of wood veneer doors. Manufacturer shall be current member of AWI |
| R32 | All doors to be fabricated using Hot Press 5 Ply construction. |
| R33 | Warrant doors in writing for life of installation against defects |
| R34 | All door hardware shall be provided by a single hardware supplier. |
| R35 | Submit certification from AHC stating: a. All door hardware has been reviewed by AHC and verified to be compatible with doors and frames. b. All electrified door hardware has been reviewed by AHC and has been coordinated with power supply and access control system. c. No submittals will be reviewed until Engineer has received AHC certification. |
| R36 | Submit certification from AHC stating all door hardware has been provided per approved Shop Drawings, has been installed in accordance with manufacturer's recommended installation instructions and all doors have been inspected and tested and found to be in proper working order. |
| R37 | Perform finish hardware installation by or under the direct supervision of an AHC. |
| R38 | Provide manufacturer's standard 10 year warranty on door closers. |
| R39 | Provide products from a single manufacturer to the greatest extent practicable for architectural paints. |
| R40 | Products to be listed by a Nationally Recognized Testing Laboratory (NRTL) in accordance with applicable product standards. |
| R41 | Provide equipment or control panels with Short Circuit Current Rating (SCCR) labeling as required by NFPA 70 and other applicable codes. |
| R42 | Feeder and branch power conductors shall not be smaller than No. 12 AWG unless otherwise indicated on the Drawings. Control conductors shall not be smaller than No. 14 AWG unless otherwise indicated on the Drawings. Instrumentation conductors shall not be smaller than No. 18 AWG unless otherwise indicated on the Drawings. |
| R43 | Minimum of a five year Warranty from date of manufacture against failure for solid-state luminaire including LED arrays, LED drivers and integral control devices. |
| R44 | Electronic Security Systems Manufacturers: Five continuous years, minimum, design and manufacture of the materials and equipment specified herein. |
| R45 | Electronic Security Systems Installer: Company specializing in installation of security systems and integration for a minimum of five years. Experience shall include the following: 1) List at least 10 facilities of equal size, complexity and technical requirements utilizing the equipment submitted. |
| R46 | The installer incorporated under the same name, shall have successfully completed a minimum of three similar security construction projects, both in scope and system types. |
| R47 | The work of this division shall be managed and supervised by a full-time site Electronic Security Systems superintendent who shall have... Experience in the applications engineering, installation, and supervision of similar construction projects both in scope and system type for a minimum of five years. Full time employee of the installer. Have a working knowledge of all systems installed under this division. Project superintendent shall be on site full time through duration of construction. |
| R48 | It shall be the responsibility of the Integrator to submit for the Engineer's approval, a proposed “SECS Checklist” for use in final acceptance testing... The checklist shall be submitted not later than 90 days prior to the scheduled start of acceptance testing. |
| R49 | Not less than 2 weeks prior to the scheduled acceptance test, the installer/integrator shall certify in writing that the systems are installed in compliance with the manufacturer's recommendations, Refer to the requirements of the contract documents and are operating correctly. The contractor shall completely fill out the Engineer approved SECS Checklist |
| R50 | Operate all systems in good working order for period of 10 working days prior to final acceptance testing by Engineer and Contracting Officer. |
| R51 | Provide services of factory-authorized service representative to demonstrate system and train NPS personnel in operation of system as specified below. 1. Provide three (3) training sessions for NPS staff/users detailing regular system operation having a duration of 2 HRS each. 2. Provide one (1) training session for maintenance personnel detailing regular system maintenance, troubleshooting, preventative maintenance, test and inspections having a duration of 8 HRS. Schedule training with Contracting Officer at least two weeks in advance. |
| R52 | Contractor shall provide the 'points list' and device naming conventions to NPS for review and approval prior to the commencement of programming. |
| R53 | Furnish the following items and submit documentation of delivery to and acceptance of such items by the Contracting Officer, in accordance with Section 01 10 00 - Spare Parts and Extra Materials: a. One card reader of each type used as a spare. b. One request for exit motion detector, c. One request for exit push button. d. One access control/alarm monitoring processor as a spare. e. One reader interface module (Reader controller)for each type used as a spare. f. One power supply of each type used as a spare. g. 250 access cards. h. Backup software and database programs |
| R54 | Video Surveillance System: Network video storage shall include the storage of each video signal at a minimum frame rate of 30 images per second at 8-megapixel (4K) resolution at high video quality using H.264 compression for 30 days. |
| R55 | Submit NVR storage space calculations with product technical data. |
| R56 | Furnish the following items and submit documentation of delivery to and acceptance of such items by Contracting Officer: a. One complete dome camera housing for each type utilized on the project as spares. b. One wall mount for each type utilized on the project as spares. c. One corner mount for each type utilized on the project as spares. d. One Weather / Sunshield/for each type utilized on the project as spares. e. One power supply for each type utilized on the project as spares. |
| R57 | The fire and intrusion alarm system shall be designed by a NICET Fire Alarm Systems Level III or IV Engineering Technician. |
| R58 | Service Organization Qualifications: 1. Offer an annual maintenance contract including complete service and equipment costs for maintenance of complete system. 2. 10 year’s experience minimum serving fire and intrusion alarm systems having similar complexity. 3. Provide for 24 HR emergency service. Response time to site shall be 24 HRS or less and service office shall be within 75 miles of site. 4. System shall be installed under the direct supervision of a technician who is factory trained by manufacturer and is certified as a minimum of NICET Level III in Fire Alarm Systems. |
| R59 | All products and equipment shall be available through general distribution (e.g., ADI Global, Alarm Product Distributors, Anixter International, Security Equipment Supply, Security General International, The Security Source, etc.). Products available through authorized dealers or dealer networks will not be considered. |
| R60 | Repair services and replacement parts for the system must be available for a period of 10 years after the date of final acceptance of this work. During the warranty period, the service technician must be on-site within 24 hours after notification. All repairs must be completed within 48 hours of arrival on-site. |
| R61 | Provide minimum 10 business days’ notice of acceptance test performance schedule to Contracting Officer, and AHJ. |
| R62 | Furnish extra materials, packaged with protective covering for storage, and identified with labels clearly describing contents as follows: a. Manual Stations: 5% of number installed but no less than one. b. Notification Appliances: 5% of each type and number installed, but not less than one of each type. c. Automatic initiation devices: 5% but not less than one. d. Addressable monitor, control or isolation modules: 5% but not less than one. e. Detector or Sensor Bases: 2% but not less than one. f. Intrusion detection sensors and devices: 5% but not less than one. |
Recent awards in NAICS 238210
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-15 | IMEC GROUP, LLCDepartmental Offices · THIS TASK ORDER OBLIGATES THE MINIMUM ORDER GUARANTEE FOR THE BASE CONTRACT IN THE TOTAL AMOUNT OF $2,000.00. | $2,000 |
| 2026-10-02 | KAIVA SERVICES, LLCDepartmental Offices · TO FURNISH ONE (1) ENTERPRISE LEVEL LICENSE TO MAINTAIN OPERATIONAL AND NEW GALLAGHER SOFTWARE COMPONENTS AND DEVICES FOR THE OIG ENTERPRISE ACCESS CONTROL SYSTEM (EPACS). | $155,463 |
| 2026-09-26 | E. & M. O'HARA, INCNational Park Service · 140P4526P0020: ELECTRICAL PLAN/NEWEL POST FIXTURE - THOMAS EDISON NATIONAL HISTORICAL PARK, WEST ORANGE, NJ | $4,392 |
| 2026-09-25 | D & H ENTERPRISES LLCNational Park Service · REPLACE TU DISTRICT FENCE AND GATE | $83,000 |
| 2026-09-25 | NEW ENGLAND VILLE LLCNational Park Service · NATIONAL PARK SERVICE - INDEPENDENCE NATIONAL HISTORICAL (INDE) - ELECTRICAL REWIRING - 423 LOCUST STREET | $73,000 |
| 2026-09-24 | YORK RIVER SYSTEMS LLCNational Park Service · COLONIAL NATIONAL HISTORICAL PARK - REPLACE CCTV AT JAMESTOWN VISITOR'S CENTER | $48,116 |
Source: USAspending.gov, retrieved 2026-10-25. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.