KFO VAULT TOILET PUMPING: requirements and submission rules
26 requirements and 0 submission rules found in the solicitation documents for 140LL027Q0021. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Contractor shall provide all labor, supplies, supervision, materials, equipment, mileage, and transportation necessary to provide cleaning and pumping of vault type toilets and dispose of the waste in a designated disposal area off Government property as per pumping procedures and disposal procedures in accordance with these specifications and all federal, state, and local law. |
| R2 | A full-time employee of the Prime Contractor must be onsite during the vault pumping operation every time at each site. |
| R3 | Contractors must have the ability to successfully work in remote locations and meet the requirements of this statement of work. |
| R4 | the prime Contractor shall ensure that his/her Subcontractors comply with the provisions of this contract. |
| R5 | The Contractor shall provide all facilities, equipment, materials, supplies and services to perform the requirements of this contract. |
| R6 | The Contractor will furnish commercially available products to disinfect and deodorize toilets and clean up the area directly surrounding the vault toilet at each recreation site. |
| R7 | The disposal, transportation, and use of chemicals shall be in accordance with local, state, and federal regulations. |
| R8 | The Contractor shall manage the total work effort associated with the custodial and maintenance services required herein to assure fully adequate and timely completion of these services. |
| R9 | The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with the sound and efficient practices. |
| R10 | The Contractor shall employ an adequate work force to complete the work in accordance with the time and quality standards specified herein. |
| R11 | The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. |
| R12 | The Contractor shall plan and schedule work to assure material, labor, personnel, and equipment are available to complete work requirements within the specified time limits and in accordance with the quality standards established herein. |
| R13 | Verbal scheduling and reports on the status of service calls shall be provided when requested by the Contracting Officer’s Representative. |
| R14 | The Contractor shall complete pumping within 72 hours after receiving a request from an authorized Government Representative. |
| R15 | All liquid and solid waste will be removed from each vault whether by pumping or other approved methods. |
| R16 | The work will include washdown of the vaults, leaving approximately 5% of the vault capacity with fresh water and cleanup any incidental to the pumping operation. |
| R17 | All toilet vaults pumped shall be left in a clean condition. |
| R18 | Any debris generated during the cleaning and pumping process will be thoroughly cleaned, and all debris will be promptly removed by the contractor. |
| R19 | Add disinfectant to vaults for any unpleasant odors. |
| R20 | Septic Tank Truck or equal with clean water storage and the capability to spray in order to clean the vault and clean and disinfect any residue created by the vault pumping operation: Minimum capacity of 1,000 gallons. |
| R21 | Vacuum pump |
| R22 | Minimum three-inch intake valve and hose |
| R23 | Long handled grappling device |
| R24 | Backup warning device |
| R25 | Water for properly cleaning of vault toilets |
| R26 | Must be able to operate in remote locations |
Recent awards in NAICS 562991
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-09-22 | SUNTIFF, LLCBureau of Land Management · HIGH COUNTRY VAULT TOILET PUMPING | $50,000 |
| 2026-11-09 | ACTION SANITARY INCDepartmental Offices · REDBUD DAY USE VAULT TOILET PUMPING | $2,800 |
| 2026-10-29 | MARSHALL'S SANITATION SERVICES LLCDepartmental Offices · SAND MOUNTAIN RECREATION AREA - EMERGENCY DISTRICT-WIDE PORTABLE TOILETS | $5,215 |
| 2026-09-26 | HOMELAND HUB CONSULTING LLCNational Park Service · SEPTIC TANK/VAULT TOILET PUMP OUTS | $87,162 |
| 2026-09-25 | M & M TRANSFER, INC.Bureau of Land Management · THE BUREAU OF LAND MANAGEMENT (BLM), WYOMING STATE OFFICE, PINEDALE FIELD OFFICE, INTENDS TO SOLICIT FOR VAULT PUMPING SERVICES AT DESIGNATED REMOTE RECREATION SITES. THE CONTRACTOR SHALL PROVIDE ALL | $9,385 |
| 2026-09-25 | SUNTIFF, LLCU.S. Fish and Wildlife Service · OR-SHELDON-HART MTN NWR CX-THE U.S. FISH AND WILDLIFE SERVICE REQUIRES COMMERCIAL VAULT TOILET PUMPING SERVICES ON AN AS-NEEDED BASIS AT SHELDON NATIONAL WILDLIFE REFUGE, DENIO, NEVADA. THE REQUIREMEN | $16,050 |
Source: USAspending.gov, retrieved 2026-11-15. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.