KFO VAULT TOILET PUMPING: requirements and submission rules

26 requirements and 0 submission rules found in the solicitation documents for 140LL027Q0021. Use them as the start of your compliance matrix.

Solicitation number
140LL027Q0021
Agency
INTERIOR, DEPARTMENT OF THE / DEPARTMENTAL OFFICES / BLM CONTRACTING ACTIVITY
NAICS
562991
Set-aside
Small Business Set Aside - Total
Responses due
04 December 2026 (6 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • None detected automatically: read the instructions to offerors.

Requirements

IDRequirement
R1Contractor shall provide all labor, supplies, supervision, materials, equipment, mileage, and transportation necessary to provide cleaning and pumping of vault type toilets and dispose of the waste in a designated disposal area off Government property as per pumping procedures and disposal procedures in accordance with these specifications and all federal, state, and local law.
R2A full-time employee of the Prime Contractor must be onsite during the vault pumping operation every time at each site.
R3Contractors must have the ability to successfully work in remote locations and meet the requirements of this statement of work.
R4the prime Contractor shall ensure that his/her Subcontractors comply with the provisions of this contract.
R5The Contractor shall provide all facilities, equipment, materials, supplies and services to perform the requirements of this contract.
R6The Contractor will furnish commercially available products to disinfect and deodorize toilets and clean up the area directly surrounding the vault toilet at each recreation site.
R7The disposal, transportation, and use of chemicals shall be in accordance with local, state, and federal regulations.
R8The Contractor shall manage the total work effort associated with the custodial and maintenance services required herein to assure fully adequate and timely completion of these services.
R9The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with the sound and efficient practices.
R10The Contractor shall employ an adequate work force to complete the work in accordance with the time and quality standards specified herein.
R11The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress.
R12The Contractor shall plan and schedule work to assure material, labor, personnel, and equipment are available to complete work requirements within the specified time limits and in accordance with the quality standards established herein.
R13Verbal scheduling and reports on the status of service calls shall be provided when requested by the Contracting Officer’s Representative.
R14The Contractor shall complete pumping within 72 hours after receiving a request from an authorized Government Representative.
R15All liquid and solid waste will be removed from each vault whether by pumping or other approved methods.
R16The work will include washdown of the vaults, leaving approximately 5% of the vault capacity with fresh water and cleanup any incidental to the pumping operation.
R17All toilet vaults pumped shall be left in a clean condition.
R18Any debris generated during the cleaning and pumping process will be thoroughly cleaned, and all debris will be promptly removed by the contractor.
R19Add disinfectant to vaults for any unpleasant odors.
R20Septic Tank Truck or equal with clean water storage and the capability to spray in order to clean the vault and clean and disinfect any residue created by the vault pumping operation: Minimum capacity of 1,000 gallons.
R21Vacuum pump
R22Minimum three-inch intake valve and hose
R23Long handled grappling device
R24Backup warning device
R25Water for properly cleaning of vault toilets
R26Must be able to operate in remote locations

Recent awards in NAICS 562991

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-09-22SUNTIFF, LLCBureau of Land Management · HIGH COUNTRY VAULT TOILET PUMPING$50,000
2026-11-09ACTION SANITARY INCDepartmental Offices · REDBUD DAY USE VAULT TOILET PUMPING$2,800
2026-10-29MARSHALL'S SANITATION SERVICES LLCDepartmental Offices · SAND MOUNTAIN RECREATION AREA - EMERGENCY DISTRICT-WIDE PORTABLE TOILETS$5,215
2026-09-26HOMELAND HUB CONSULTING LLCNational Park Service · SEPTIC TANK/VAULT TOILET PUMP OUTS$87,162
2026-09-25M & M TRANSFER, INC.Bureau of Land Management · THE BUREAU OF LAND MANAGEMENT (BLM), WYOMING STATE OFFICE, PINEDALE FIELD OFFICE, INTENDS TO SOLICIT FOR VAULT PUMPING SERVICES AT DESIGNATED REMOTE RECREATION SITES. THE CONTRACTOR SHALL PROVIDE ALL $9,385
2026-09-25SUNTIFF, LLCU.S. Fish and Wildlife Service · OR-SHELDON-HART MTN NWR CX-THE U.S. FISH AND WILDLIFE SERVICE REQUIRES COMMERCIAL VAULT TOILET PUMPING SERVICES ON AN AS-NEEDED BASIS AT SHELDON NATIONAL WILDLIFE REFUGE, DENIO, NEVADA. THE REQUIREMEN$16,050

Source: USAspending.gov, retrieved 2026-11-15. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.