FL-GREAT WHITE HERON NWR POLE BARN ROOF REPLACEMEN: requirements and submission rules
16 requirements and 6 submission rules found in the solicitation documents for 140FF027Q0078. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- The quotation MUST be electronically submitted via e-mail to adam_graham@ios.doi.gov by the due date and time listed on the System for Award Management synopsis for consideration.
- In accordance with FAR 4.1201, representations and certifications shall be submitted to the System for Award Management (www.sam.gov) and updated at least annually to ensure they are kept current, accurate, and complete.
- (A) QUANTITY (C) NSN 7540-01-152-8067 140FF027Q0078 The deadline for submission of questions is 14 December 2026 at 11:00 AM Eastern Time.
- D.2.0 MARKING All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.
- Questions regarding this solicitation must be submitted in writing to Adam Graham via e-mail to adam_graham@ios.doi.gov by 14 December 2026 at 11AM Eastern Time.
- Submit a complete quote that strictly conforms to all administrative and technical instructions outlined in this solicitation (responsiveness).
Requirements
| ID | Requirement |
|---|---|
| R1 | The 'offer' section on the reverse must be fully completed by offeror. |
| R2 | The contractor shall begin performance within 10 calendar days and complete it within 150 calendar days after receiving notice to proceed. |
| R3 | Offers providing less than 10 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| R4 | The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due.Section F (deliveries) |
| R5 | The offeror agrees to furnish any required performance and payment bonds.Section F (deliveries) |
| R6 | The offeror acknowledges receipt of amendments to the solicitation -- give number and date of eachSection F (deliveries) |
| R7 | The contractor shall perform all work in accordance with the Statement of Work and other solicitation requirements.Section F (deliveries) |
| R8 | This acquisition is a Total 100% Small Business Set-Aside and will be conducted using Simplified Acquisition Procedures in accordance with FAR Part 13 and construction procedures under FAR Part 36.Section F (deliveries) |
| R9 | Although Performance Bonds are not anticipated based on the dollar value, Payment bonds are anticipated based on the estimated dollar value; therefore, offerors shall include all associated costs in their quotation.Section F (deliveries) |
| R10 | If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.Section G |
| R11 | In order for a quote to be considered responsive, the quoter shall submit the information listed in the checklist below. Failure to submit all of the required information prior to the closing of the solicitation ( see Block 8 of the SF 1442) may result in the quote not being considered for award. Quote Submission Checklist: 1. Completed SF 1442 (Blocks 14 thru 20C). 2. Signed Amendment(s)- SF30s (if Applicable) 3. Pricing for Items on the Quote Schedule (Section B) 4. Representation and CertificationsSection L (instructions to offerors) |
| R12 | Submit the completed Standard Form 1442 and all acknowledged amendments, if any.L.2.1.1 |
| R13 | The Respondent shall submit a completed Quote Schedule (Section B). The Respondent shall enter unit prices and extended totals for each item listed in the Quote Schedule. The line item price shall include all necessary supervision, management, labor, transportation, equipment, materials, any other direct incidental costs, overhead and profit.L.2.1.1 |
| R14 | The Contractor shall submit one of the following payment protections: Payment bond / Irrevocable letter of credit (ILC). The amount of the payment protection shall be 100 percent of the contract price. The submission of the payment protection is required within 10 calendar days of contract award.Section I (contract clauses) |
| R15 | The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer... The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.Section I (contract clauses) |
| R16 | At the prework conference, the Contractor shall provide to the COR a written 'work progress plan' that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.F.2.0 |
Recent awards in NAICS 238160
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-26 | ARK CONSTRUCTION MANAGEMENT LLCNational Park Service · 140P4526C0032: REHABILITATION OF ROOFS - BUILDING 40, SANDY HOOK UNIT, GATEWAY ANTIONAL RECREATION AREA, FORT HANCOCK, NJ | $695,000 |
| 2026-09-25 | JB CONTRACTING INCU.S. Fish and Wildlife Service · EO 14398 - CHARLES RUSSELL NWR FT PECK BUNKHOUSE ROOF REPLACEMENT 10/01/2026 TO 04/30/2027 | $86,500 |
| 2026-09-24 | J & G SOLUTIONS LLCNational Park Service · EO 14398 CONSTRUCTION, ROOF REPLACEMENT FOR THREE STRUCTURES AT CANAVERAL NATIONAL SEASHORE | $303,500 |
| 2026-09-24 | MFS CONSTRUCTION LLCDepartmental Offices · THE WORK OF THIS CONTRACT INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, AND RELATED OPERATIONS NECESSARY TO COMPLETE THE REPLACEMENT OF THE TERRA COTTA TILE ROOF AND THE REPAIR, CONSERVATION, OR | $870,740 |
| 2026-09-23 | CORPORATE VISION, INC.Bureau of Land Management · MISSOULA FIELD OFFICE RENOVATION | $274,409 |
| 2026-09-23 | GOVCREST INCU.S. Fish and Wildlife Service · POCOSIN LAKES NWR ROOF REPAIR OF FIELD STATION | $4,760 |
Source: USAspending.gov, retrieved 2026-11-20. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.