19 requirements and 15 submission rules found in the solicitation documents for 140FF027Q0044. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Questions regarding this solicitation must be submitted in writing to jessica_tines@fws.gov no later than 12/7/2026 at 10:00am Pacific.
- In accordance with FAR 4.1201, representations and certifications shall be submitted to the System for Award Management (www.sam.gov) and updated at least annually to ensure they are kept current, accurate, and complete.
- The following provisions are provided in full text: 52.204-7 System for Award Management—Registration (NOV 2024) (DEVIATION MAR 2026) As prescribed in 4.208(b)(1), insert the provision: The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award.
- D.2.0 MARKING All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.
- To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.
- The Contractor shall submit the information required in paragraph (c) of this clause in the System for Award Management (SAM) at https://www.sam.gov (see SAM User Guide).
- The quotation MUST be electronically submitted via e-mail to Jessica_tines@fws.gov L.1.3 Requests for Information.
- The Offeror shall obtain and provide the following identifying information: (1) Unique entity identifier (UEI).
- Offerors shall acknowledge receipt of any amendment to this RFP by the date and time specified in the amendment(s).
- Unless otherwise directed by the Contracting Officer, or as provided in paragraph (f) of this clause, the Contractor shall report the following in the System for Award Management at https://www.sam.gov as follows: (1) Executive compensation of the prime contractor.
- 140FF027Q0044 (1) The Contractor shall not change the legal business name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR part 32).
- Assignees shall be separately registered in SAM.
- The Contractor shall ensure that its UEI is maintained throughout the life of the contract.
- To update a CAGE code, the Contractor shall initiate the change by updating its SAM registration.
- The Contractor shall communicate any change to its UEI or CAGE code to the Contracting Officer within 30 days after the change, so a modification can be issued to update the UEI or CAGE code on this contract.
Requirements
| ID | Requirement |
|---|---|
| R1 | The "offer" section on the reverse must be fully completed by offeror. |
| R2 | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| R3 | The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each |
| R4 | Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000 requires both Payment and Performance bonds. Bonds are due no later than 10 calendar days after award. |
| R5 | The site visit is not mandatory; however, contractors who do not attend assume responsibility for site conditions that were reasonably observable during the site visit, and such conditions will not constitute grounds for a contract modification. |
| R6 | In order for a quote to be considered responsive, the quoter shall submit the information listed in the checklist below. Failure to submit all of the required information prior to the closing of the solicitation (see Block 8 of the SF 1442) will result in the quote not being considered for award.Section L (instructions to offerors) |
| R7 | Completed SF 1442 (Blocks 14 thru 20C).Section L (instructions to offerors) |
| R8 | Signed Amendment(s)- SF30s (if Applicable)Section L (instructions to offerors) |
| R9 | Pricing for Items on the Quote Schedule (Section B)Section L (instructions to offerors) |
| R10 | Representation and Certifications: Provision does not need to be filled out if information is already entered into the System for Award Management (SAM.gov). If information is already entered into SAM, please state so. |
| R11 | The Respondent shall submit a completed Quote Schedule (Section B). The Respondent shall enter unit prices and extended totals for each item listed in the Quote Schedule. The line item price shall include all necessary supervision, management, labor, transportation, equipment, materials, any other direct incidental costs, overhead and profit.L.2.1.1 |
| R12 | The Offeror represents that– (1) It is □ is not □ a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and (2) It is □ is not □ a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.L.2.1.1 |
| R13 | Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.Section I (contract clauses) |
| R14 | If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.L.2.1.1 |
| R15 | the Offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture at https://www.biopreferred.gov/resources/categories.html to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.L.2.1.1 |
| R16 | If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliantL.2.1.1 |
| R17 | Representation. The Offeror represents that- (1) It □ is, □ is not an inverted domestic corporation; and (2) It □ is, □ is not a subsidiary of an inverted domestic corporation.L.2.1.1 |
| R18 | Do not submit an offer unless— (1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or (2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has (i) Waived application under 22 U.S.C. 2593e(d) or (e); or (ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C. 2593e(b).L.2.1.1 |
| R19 | It is up to the offeror to verify exact measurements for proposal preparation. Measurements provided are only approximations to provide offerors an idea of the project scope of work.M.1.0 |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-11-04 | JAMII DEVELOPMENT LLCDepartmental Offices · WV-CANAAN VLY NWR-CHAIN LINK FENCE | $18,000 |
| 2026-11-03 | HUOT CONSTRUCTION AND SERVICES, INC.Departmental Offices · MAINTENANCE BLDG REPAIRS AT LITCHFIELD WETLAND MGMT DISTRICT | $308,540 |
| 2026-10-29 | HAGGARDS EXCAVATING LLCDepartmental Offices · MO-NEOSHO NFH-MIXING BOX EMERG REPAIRS | $20,000 |
| 2026-10-26 | COELHO, INC.Departmental Offices · RED ROCK ADMIN BUILDING PHASE 2 REPAIRS | $798,680 |
| 2026-10-22 | BURTON CONSTRUCTION, INC.Departmental Offices · MT-CHARLES M RUSSELL NWR ROOF HQ SHOP | $53,608 |
| 2026-10-20 | HESS CONTRACTING LLCDepartmental Offices · EO 14398 ID-KOOTENAI NWR-STRIP AND PAINT EXTERIOR OF EE BUILDING | $35,035 |
Source: USAspending.gov, retrieved 2026-11-06. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.