N--WA-SPRING CRK NFH-CHAIN LINK FENCING: requirements and submission rules

31 requirements and 3 submission rules found in the solicitation documents for 140FF027Q0037. Use them as the start of your compliance matrix.

Solicitation number
140FF027Q0037
Agency
INTERIOR, DEPARTMENT OF THE / DEPARTMENTAL OFFICES / FWS CONTRACTING ACTIVITY
NAICS
238990
Set-aside
Small Business Set Aside - Total
Responses due
17 December 2026 (19 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • If you do not receive an email response confirming that the Government has received your quote within 24 hours after the closing date and time, please follow up by emailing Kathryn_coltran@ios.doi.gov.
  • Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers.
  • Award Management (SAM) website (https://www.sam.gov) as an active vendor by the time an award decision is required.

Requirements

IDRequirement
R1If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
R2Quotes from Sellers unable to accept purchase orders will not be considered for award.
R3Demonstrate your company’s technical capability and knowledge as they relate to the tasks described in the SOW.
R4Provide three examples of recent and relevant experience. Recent being within the last 5 years and relevant being similar in size and scope to this project. Examples should include the contract number, brief description of the project, dollar amount, dates of project, Point of Contact (POC) and phone number or email.
R5You must complete and submit the attached BID SCHEDULE.
R6Quotes Due: December 17, 2026, at 1700 eastern time. E-Mail Quote Submission to Kathy Coltran: kathryn_coltran@ios.doi.gov
R7When submitting your quote, please list the subject line as the solicitation description followed by your company name. Please also label your quote attachment the same way.
R8Contractors must demonstrate experience in fence installation.
R9Photos and preliminary measurements are provided as attachments, but contractors are responsible for confirming all dimensions.
R10Period of Performance Start Date: Date of Award End Date: 01/29/2027 Work must be completed within this window.
R11Emergency contact information must be provided by the contractor.
R12The contractor shall: remove any existing fencing or debris where the new fence will be installed behind the admin building
R13The contractor shall: provide and install a new 6-foot chain link fence, including steel posts, mesh, gates, and all necessary hardware.
R14The contractor shall: Install barbed wire along the top of the fence for enhanced security.
R15Install small section of 6-foot chain link fence with barbed wire next to the incubation room.
R16The contractor shall: ensure correct alignment and stability of the fence, complying with all relevant codes and regulations.
R17The contractor shall: clean up the installation site, removing all leftover materials and debris once the work is complete.
R18Deliverables and/or Delivery Schedule: 4.1 Fully installed 6-foot chain link fence with barbed wire behind the admin building, enclosing the designated perimeter. 4.2 Completed inspections by the Contracting Officer’s Representative (COR) and/or Facility Manager. 4.3 Warranty information for both materials and workmanship.
R19Contractor must supply all tools, materials, and equipment.
R20Contractor must provide a dumpster.
R21Contractor shall maintain quality control in accordance with industry standards.
R22Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
R23The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
R24If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
R25The Contractor will not engage in any racially discriminatory DEI activities;
R26The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
R27The proposal shall include a narrative explaining how the work will be carried out in terms of the techniques, procedures, and schedule.
R28Management Plan: Key Personnel shall be addressed and identified in proposals to be considered responsive. If use of a Subcontractor is part of your response to the solicitation, they should be identified in the response to the solicitation.
R29Past performance. The proposal shall include three examples of successful, timely completion of similar work.
R30The following information shall be included: o Name of the job (to include address) o Project Prime's name o Issuing agency or company o Contract/Identification number o Start and completion dates o Brief description of the scope of work o How the work is substantially similar to the proposed project o No less than two (2) valid references that includes: Agency name, Point of Contact, Phone Number, Email Address
R31NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Recent awards in NAICS 238990

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-03BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.Departmental Offices · ASPHALT REPAIR AT CARL SANDBURG NATIONAL HISTORIC SITE$24,785
2026-10-30BRANDSAFWAY SOLUTIONS LLCDepartmental Offices · THE NATIONAL PARK SERVICE (NPS) HISTORIC PRESERVATION TRAINING CENTER (HPTC), ACTING ON BEHALF OF FORT SUMTER AND FORT MOULTRIE NATIONAL HISTORICAL PARK (FOSU), SEEKS A QUALIFIED CONTRACTOR SHALL PROV$34,058
2026-10-28CARPENTERS HIGH DESERT FENCING LLCDepartmental Offices · 2026 HORNING SEED FIELD FENCE INSTALLATION$71,832
2026-10-21TIER 1 MANAGEMENT LLCDepartmental Offices · EO 14398 - WHITE SULPHUR SPRINGS NFH REHABILITATE APPALACHIAN FWCO OFFICE$2,974
2026-10-19SILVER NATIONAL CORP.Departmental Offices · MOBILE CRANE SERVICES FOR MTE$115,931
2026-09-26D & H ENTERPRISES LLCNational Park Service · NATC REPAIR MELROSE STORAGE BUILDING$36,000

Source: USAspending.gov, retrieved 2026-11-06. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.