TenderAxiom

TenderAxiom · Opportunities

USWFS Exclusive Use Smokejumper Aircraft Dash 8: requirements and submission rules

76 requirements and 15 submission rules found in the solicitation documents for 140D0427R0118. Use them as the start of your compliance matrix.

Solicitation number
140D0427R0118
Agency
INTERIOR, DEPARTMENT OF THE / DEPARTMENTAL OFFICES / IBC ACQ SVCS DIRECTORATE (00004)
NAICS
481211
Set-aside
Small Business Set Aside - Total
Responses due
03 December 2026 (5 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Questions related to this RFP must be submitted via email to lynn_herrman@ibc.doi.gov and maya_maxies-clemons@ibc.doi.gov, no later than November 16, 2026, 2:00 pm CT.
  • Proposal must be received in the identified email box by the due date and time.
  • Department of the Interior Division II, Branch 5 Acquisition Services Directorate Email: maya_maxies-clemons@ibc.doi.gov D3.3.2 Email proposal “subject line” must be in this format: Subject: Name of Company (The Company’s SAM, 13-digit Unique Entity Identifier – UEI in Parenthesis) followed by the word “Proposal” and Solicitation Number.
  • Proposals are due no later than 2:00 pm Central Time (CT), December 2, 2026.
  • 95 D6 Late Submissions, Modifications, Revisions, and Withdrawals of Offers .................................................................
  • C1.3 Aircraft Use Reports or other form as directed by the CO are to be submitted no later than every two weeks or upon conclusion of the task order, if less than two weeks duration and no later than 14 days after conclusion of the task order.
  • D1.2 If an offeror wishes to compete for the contract described in Sections A through C of this RFP, they must submit a proposal no later than December 02, 2026 2:00 pm Central Time (CT).
  • Volume III Organizational Safety D4.7 The Offeror must provide evidence of meeting FAA SMS requirements for Part 135 or air tour operators operating under § 91.147 no later than May 28, 2027 (FAA Final Rule, May 2024).
  • (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
  • The OAS-64A must be submitted to the AOM Inspector Pilot annually, and prior to any carding or pilot inspection event.
  • All training must be documented on the SMJ pilot training form (see exhibit 19) and submitted to the pilot inspector prior to evaluation.
  • The contractor must submit a written request for inspections of pilot substitutes to the AOM Technical Inspector seven days prior to the scheduled arrival at the site.
  • Prior to an evaluation flight and/or AOM card being issued, the Contractor shall submit the following documentation to the CO for each requested pilot:
  • Requests for aircraft substitution must be submitted to the CO for approval prior to inspection.
  • (vi) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date).

Requirements

IDRequirement
R1This acquisition is a 100% small business set-aside. The North American Industry Classification System (NAICS) Code and small business size standard for this acquisition is 481211 and 1,500 employees respectively... Only proposals from small businesses will be considered. Proposals from large businesses will be deemed unacceptable and removed from further consideration.
R2The aircraft shall be a high wing, multi-engine, turboprop airplane for transporting and dropping smokejumpers and paracargo, reconnaissance, testing of parachutes and other aerial equipment, transportation of personnel and cargo in support of fire suppression activities, search and rescue, natural resource missions, and other administrative and related resource activities as directed by the Government.Section A
R3Aircraft must have in-flight opening and closing side door (Air Operable Door) for parachute and paracargo operations.Section A
R4Crew Complement Required: Pilot-in-command (PIC) and relief PIC, second-in-command (SIC) (if required by make and model offered), relief SIC (if SIC is required), and on-site mechanic.Section A
R5Minimum Aircraft Requirements: • Must have a Standard Airworthiness Certificate. • Aircraft certified under 14 CFR 23 or 25. • An aircraft make and model for which engineering and logistical support, for continued airworthiness, is provided from the current type certificate holder or supplemental type certificate holder. • VFR/IFR, Day/Night. • Certified for Flight into Known Icing • Payload of 6,500 pounds with 4.5 hours of fuel plus a 30-minute fuel reserve, 200 pounds per pilot, and a 35 pound survival kit when equipped for smokejumper operations as required in Section B. • Capable of operating as configured above from 3,000-foot gravel runway at 500 feet pressure altitude and ISA +20º Celsius. • Minimum airspeed of 175 KTAS at 8,000 PA. • Seating for nineteen (19) passengers with quick removable seats or eight (8) smokejumpers using ORO fold up style seating system, and two spotters. • Side-facing exit aft of main landing gear with FAA approval for aircraft operation with door removed or in-flight opening of this exit door. • Interagency Smokejumper Aircraft Screening and Evaluation Subcommittee (SASES) approved.Section A
R6Offerors must complete and submit pricing schedules (A3.1). Offerors must complete and submit a separate pricing schedule for each type of aircraft for which they wish to be considered.Section A
R7The unit price for items 1D through 1F must be the same as, or lower than, the unit price for items 1A through 1C.Section A
R8Notice requirement to input unit pricing for additional pilot and mechanic below.Section A
R9During any ordered use period and any subsequent extension, aircraft furnished shall be subject to the exclusive use and control of the Government 24 hours per day, 7 days per week.Section B
R10The Contractor must obtain and keep current all the following required certificates. The Contractor must ensure that contract personnel and aircraft are maintained in compliance with these certificates at all times. B2.1 A Federal Aviation Administration (FAA) Air Carrier Certificate which authorizes the Contractor to operate in the category and class of aircraft and under flight conditions required by this contract (e.g., airplane, multiengine, visual flight rules (VFR) day and night, instrument flight rules (IFR), flight into known icing conditions (FIKI), passengers, and cargo).Section B
R11Aircraft shall be identified as required by 14 CFR Part 121.135(7) or 135.63 or Operations Specifications Part D, “D085 Aircraft Listing,” as appropriate. Aircraft shall be fully equipped to carry the number of passengers offered in accordance with the standards of 14 CFR Part 121 or 135 as appropriate.Section B
R12The contract aircraft must have engineering support for continued airworthiness from the current type certificate holder or supplemental type certificate holder.Section B
R13The aircraft must have a Standard Airworthiness Certificate issued under 14 CFR 21.183.Section B
R14The installation of any special equipment called for by this contract must be FAA-approved. Approval may be in accordance with an STC or FAA field approval.Section B
R15If the aircraft is to be operated with a restricted airworthiness certificate, then the Contractor must have a certificate of waiver or authorization issued from the FAA to the Contractor authorizing operation of a Restricted Category aircraft over densely populated areas. The specific regulation required to be waived is: 14 CFR 91.313(e)(1)(2) and (3).Section B
R16For contracts less than 90 days, the Contractor must have a certificate of waiver or authorization issued from the FAA to the Contractor authorizing operations at less than minimum safe altitudes as prescribed in 14 CFR 91.119 (a)(b) and c).Section B
R17The Contractor must maintain a complete, current copy of the contract, modifications, and task orders (if applicable) in each contract aircraft throughout the performance period.Section B
R18The Contractor-furnished aircraft and all other required equipment must be operable, free of damage, and in good repair. Aircraft systems and components shall be free of leaks except where specified by the manufacturer.Section B
R19Prior to inspection and acceptance, the Contractor must permanently repair or replace all windows and windshields that have been temporarily repaired. All windows and windshields must be maintained at all times and must be clean and free of scratches, cracks, crazing, distortion, repairs, or tinting which hinder visibility.Section B
R20The internal cabin area near the exit door and the external fuselage aft of and below the exit door shall be free of protrusions and sharp edges. Protrusions and sharp edges that cannot be removed shall be adequately protected to prevent snagging or chaffing of equipment.Section B
R21The Contractor must provide one fully compliant aircraft that is equipped as shown below: B6.1 Standard Equipment [including B6.1.1 First Aid Kit; B6.1.2 Survival Kit; B6.1.3 Fire Extinguisher; B6.1.4 FAA-approved seats, seatbelts, and shoulder harnesses; B6.1.5 Removable FAA-approved seats for cargo configuration; B6.1.6 Anti-collision lighting; B6.1.7 Forward-facing pulsating light; B6.1.8 Strobe light visible from above; B6.1.9 Cargo restraints, cargo nets, and cargo straps; B6.1.10 Cabin heater; B6.1.11 14 CFR Parts 91/135 day/night VFR/IFR passenger equipage; B6.1.13 No protrusions between jump door and tail; B6.1.14 Heavy-duty floor stressed to 75 psf].Section B
R22All contractor-furnished specialized equipment must be FAA approved. B6.2.1 For the purpose of in-flight egress of personnel and or equipment, at the onset of this contract, the contractor must furnish an aircraft with an FAA STC’d in-flight door. B6.2.1.1 A jump door "guard" (i.e., fiberglass/Teflon fairing) must be installed to cover the aft and bottom edges of the door opening. B6.2.2 Smokejumper side-facing seats. ORO or similar Government accepted fold up style seating system. B6.2.3 Two (primary and secondary) horizontally mounted parachute static line attachment cables. B6.2.4 A handrail of smooth contour on the jumper exit/paracargo door opening... B6.2.5 Quick install and removable continuous roller track that covers the length of the cabin floor, level to the exit, for paracargo.Section B
R23The Contractor must provide, install, and maintain the following systems in accordance with the manufacturer's specifications and the installation and maintenance standards of Section B7... B7.2.1 Strict adherence to the recommendations in the following FAA Advisory Circulars is required: AC 43.13-1B Chapter 11... and Chapter 12...; AC 43.13-2B Chapter 1... Chapter 2... and Chapter 3...Section B
R24All installed transceivers must be placarded with designations matching the transmitter/receiver controls on the installed audio control system(s).Section B
R25One automatic-fixed Emergency Locator Transmitter (ELT), certified under TSO-C126b (or newer) which must be installed in a conspicuous or marked location, and meet the same requirements as those detailed for aircraft in 14 CFR 91.207 (excluding section f).Section B
R26Two panel-mounted VHF-AM (VHF-1, VHF-2) aeronautical transceivers, each with a minimum of 760 channels covering 118.000 to 136.975 MHz... minimum of 5 watts carrier output power... the aircraft’s radio call sign (normally the aircraft registration number) must be displayed on the instrument panel, in view of the flight crew.Section B
R27Two P25-compliant VHF-FM transceivers. Each transceiver (FM-1, FM-2) must provide selection of narrowband analog (12.5 kHz) or narrowband digital (12.5kHz) operation on each of a minimum of 100 channels... operational frequency range must include the band of 136.0000 MHz to 173.9975 MHz... separate, programmable GUARD receiver, with accompanying GUARD transmit capability... Carrier output power for each transceiver must be 10 watts nominal value... conveniently located programming port, to facilitate programming via a government-owned laptop computer.Section B
R28Provisions for Auxiliary VHF-FM (AUX-FM) Portable Radio... Interface for installing and properly operating an auxiliary VHF-FM portable radio through the aircraft's audio control system(s)... One weatherproof, external, broadband antenna covering the 150-174 MHz band... Mounting facilities for securely installing the auxiliary VHF-FM portable radio in the cockpit... auxiliary FM adapter cord assembly to interface... In lieu of the above AUX-FM requirements, the Contractor may substitute an additional VHF-FM aeronautical transceiver (FM-3)...
R29One satellite-based aircraft tracking hardware compatible with the government’s Automated Flight Following (AFF) Program (https://aff.gov)... powered by the aircraft’s electrical system, installed per the manufacturer’s installation manual, and operational in all phases of flight... maintain a subscription service through the AFF aircraft hardware provider... position-reporting interval must be every two minutes while the aircraft is in flight.Section B
R30One Iridium-network based Satellite Telephone (Satphone) system. The installation must be in accordance with 14 CFR 43... handset, or remote dialer, must be mounted in a convenient location in the cockpit... permanently interfaced to the aircraft audio system... provide the capability to pre-program at least six (6) telephone numbers... TSO C-129a L-band antenna... installed on top of the fuselage...Section B
R31One permanently installed, panel-mounted, Global Positioning System (GPS). The GPS must be certified to TSO-C146 for IFR operations using the Wide-Area Augmentation System (WAAS)... incorporate Wi-Fi and Bluetooth connectivity capabilities... GPS navigation database must always be current and cover the lower 48 states and Alaska. Handheld, portable, and/or marine type equipment is not acceptable.Section B
R32Additional Navigational Systems. The aircraft must be equipped with the navigational equipment required for IFR operations as specified in 14 CFR 135.165, including, but not limited to: Two VHF, VOR/LOC receivers; One glideslope system; One marker beacon receiver system (unless approved substitute equipped per 14 CFR 91.175(k)); One ADF receiver (not required if both IFR GPSs operable); One HSI integrated to autopilot; One RMI; Three-axis auto-pilot system integrated with HSI.Section B
R33Six audio control systems must be provided, one each for use by the pilot, observer/copilot, jump seat position, training position, and two aft spotter positions... An ICS must be provided for the pilot, copilot/observer, jump seat position, training position, and two aft spotter positions... Earphones, microphones, PTT's, and jacks... Single set of J-033 and J-034 type connector jacks... wireless drop cord system for the pilot, forward observer/copilot, and right and left rear cabin exit positions... Public Address (PA) system...Section B
R34One air traffic control (ATC) transponder and altitude reporting system meeting the requirements of 14 CFR Part 91.215 (a) and (b)... maintained in accordance with the requirements of 14 CFR Part 91.413 and inspected and tested every 24 calendar months.Section B
R35The aircraft must be equipped with an FAA Technical Standard Order (TSO) approved traffic awareness and avoidance system (TCAS/TAS/TCAD/etc.) featuring active interrogation of threat aircraft... visual alerts for both pilot and co-pilot and an aural alerting feature... installed by a certified avionics repair station...Section B
R36One thunderstorm detection (or weather radar) system, meeting the same requirements as those specified in 14 CFR 135.173.Section B
R37The aircraft must be equipped to meet the ADS-B OUT requirements of 14 CFR 91.225. ADS-B OUT systems must be approved to either TSO-C154c or TSO-C166b... Canadian ADS-B Out Performance Requirements Mandate... Additional portable wireless ADS-B IN system capable of supporting a minimum of four devices (tablet or mobile)...Section B
R38Each aircraft must be equipped to meet the Radar Altimeter (RAD ALT) requirements of 14 CFR 135.160, where applicable.Section B
R39The aircraft must be equipped with two permanently installed circuit-breaker protected, dual USB charging ports. The ports must be approved under TSO-C71, providing a maximum of 2.1A power at 5VDC and mounted in a location convenient to the pilot and copilot/spotter positions. (Cigarette lighter adapter is not acceptable)Section B
R40One Terrain Awareness and Warning System class B (TAWS-B) or Enhanced Ground Proximity Warning System (EGPWS) ensuring they are operational and maintained per manufacturer guidelines... The Contractor shall also install a pilot-controlled TAWS inhibit switch in the aircraft.Section B
R41The Contractor must furnish a flight crew for each day the aircraft is required to be available. A flight crew is one pilot-in-command (PIC) and, if required by the aircraft offered, one second-in-command (SIC).Section B
R42The Contractor must provide a pilot(s) who meets the following minimum qualifications and who possesses the required certificates and evidence of having satisfactorily passed the evaluations for the required tasks: An FAA commercial pilot certificate or higher... current first-class medical certificate... current FAA competency check completed in accordance with 14 CFR 135.293(a and b)... 14 CFR 135.299 line check, and a current 14 CFR 135.297 instrument proficiency check or 14 CFR 121 equivalents... Pilots assigned as PIC must have previously possessed an interagency smokejumper and paracargo pilot-in-command card [or accomplish SMJ PIC trainee requirements]... Proficient operation of all equipment... familiar with PMS 505 NWCG Standards... Submit an OAS-64A or FS 5700-20 for each pilot offered.Section B
R43PICs must have logged minimum flying time as follows: (a) 1,500 hours Total pilot time. (b) 1,200 hours PIC, airplanes. (c) 200 hours PIC category and class to be flown. (d) 75 hours PIC actual or simulated instrument flight time (including 50 hours in flight). (e) 100 hours PIC night flying... (f) 250 hours PIC large airplane when applicable. (g) 100 hours PIC turbo prop. (h) 200 hours... of low-level flight (below 500 feet AGL)... (i) 100 hours Total time in category, preceding 12 months. (j) 10 hours PIC class in the preceding 60 days. (k) 50 hours PIC in make and model of aircraft to be used on this contract (25 hours if the pilot has attended a formal transition-training course...). (l) 200 hours... in mountainous terrain or 100 hours after successfully graduating from a recognized mountain flying school.Section B
R44All PIC and SIC pilots must attend an orientation session conducted by the U.S. Wildland Fire Service (USWFS) on SMJ procedures prior to flying missions other than training. This session will consist of approximately 15 hours of classroom study.Section B
R45SIC minimum qualifications, if required by the aircraft type offered: FAA commercial pilot certificate with an instrument rating; at least a second-class medical certificate; evidence of satisfactorily completing an FAA competency check (14 CFR 135.293 or 14 CFR 121 equivalent); minimum three (3) hours of training meeting B10.3.1.2 occupying co-pilot seat; minimum three (3) hours observing flights occupying jumpseat; flight evaluation with Interagency SMJ Pilot inspector.Section B
R46The Contractor must furnish at least one experienced SMJ PIC designated as an SMJ IP to manage smokejumper pilot performance and conduct smokejumper pilot training... At the Contractor’s expense, a SMJ IP must be available at the aircraft’s base of operations within 24 hours of request by the Government during performance under this contract... successfully completed at least 30 missions in the last 5 years or 10 missions within the last 24 months as a DOI/USFS-approved smokejumper PIC... completed at least five smokejumper missions in the geographic areas and atmospheric conditions similar to the area where instruction will be given.Section B
R47Flight crewmembers will be subject to the following duty hour limitations: Assigned duty of any kind must not exceed 14 hours in any 24-hour period... A maximum of 14 consecutive duty hours during any assigned duty period... All flight crewmembers shall have two 24-hour periods of rest (off duty) within any 14 consecutive calendar days... Each pilot must be given a minimum of 10 consecutive hours of rest (off duty) prior to any assigned duty period... A maximum of 8 hours flight time (10 hours flight time for a crew of two when flying point-to-point missions) during any assigned duty period... A maximum of 42 hours flight time (50 hours flight time for a crew of two when flying point-to-point missions) during any consecutive 6-day period.Section B
R48For each day the aircraft is required to be available, the Contractor must furnish a mechanic who is on-site and immediately available to service and inspect the contract aircraft at the designated/alternate base.Section B
R49The mechanic provided to support this contract must possess the required certificates and minimum qualifications shown below: valid FAA mechanic certificate with airframe and powerplant (A&P) ratings held for 24 months; actively engaged in aircraft maintenance as a certificated mechanic for at least 18 months out of the last 24 months; 12 months experience as an A&P mechanic maintaining the same category of aircraft (3 in preceding 24 months); evidence of maintaining an aircraft of the same make and model under field conditions for one full season (or three months away from base); 12 months maintenance experience on same make and model or manufacturer course completion; completed OAS-41 Aircraft Maintenance Personnel Experience Summary.Section B
R50Mechanics must not exceed the following duty time limitations: Within any 24-hour period, mechanics must have a minimum of 8 consecutive hours off duty immediately prior to the beginning of any duty day... Mechanics must have 2 full days off duty during any 14-day period during the performance of this contract.Section B
R51The Contractor must provide a qualified relief crew consisting of a pilot and copilot (if required by make and model offered) and mechanic that is available to perform duties during the regular crewmember’s scheduled days off. The Contractor must provide a planned schedule of relief duty days to the Contracting Officer’s Representative (COR) at the start of the exclusive use period.Section B
R52Any aircraft used under this contract must be physically secured and disabled via a dual-lock method whenever the aircraft is unattended. Any combination of two different anti-theft devices designed to lock aircraft flight control surfaces when not in use, or designed to secure an aircraft to the ground, is acceptable, provided they are appropriate for the aircraft.Section B
R53The Contractor must provide and require personnel to wear PPE in accordance with the Interagency Aviation Life Support Equipment (ALSE) Guide/Handbook, Chapter 2 Personal Protective Equipment.Section B
R54While within the safety circle (50 feet) of an operating aircraft, all personnel must wear the following PPE: Shirt with long sleeves overlapping gloves, long trousers with legs overlapping boots, hardhat/flight helmet with chinstrap fastened, hearing, and eye protection. During all fueling operations, fuel-servicing personnel must wear a long-sleeved shirt, long trousers, boots, and gloves. The shirt and pants must be made of 100% cotton or other natural fiber or labeled as non-static.Section B
R55The Contractor may be required to transport hazardous materials. Such transportation must be in accordance with 49 CFR, Department of Transportation Special Permit DOT-SP-9198, and the NWCG Standards for Aviation Transport of Hazardous Materials, PMS 513... The Contractor must ensure that each employee who may perform a function subject to this DOT Special Permit has completed the Interagency Aviation Training Module A-110... within the previous 3 years.Section B
R56The Contractor must supply all fuel and lubricating oils required to operate all equipment during the contract period... All fuel must be commercial (or military) grade aviation fuel approved for use by the airframe and engine manufacturer... Aircraft must not be refueled while any engine is running... Smoking... is prohibited within 50 feet... Cell phone use is prohibited within 50 feet... A contract pilot must be present during all fueling operations.Section B
R57The Contractor must ensure that the aircraft and all required equipment are operated and maintained in accordance with the original equipment manufacturers (OEM) or approved STC holder’s current instructions including airframe, engine, propeller, appliances, emergency equipment, and all instructions for continued airworthiness (ICA’s)... comply with all applicable FAA AD’s and MMSB’s before and during contract performance... provide, at the time of agency inspection, a current list of “issued” FAA AD’s and MMSB’s...Section B
R58The Contractor must, at their own expense, perform an operational check flight following installation, overhaul, major repair, or replacement of any engine, propeller, flight control system, or when requested by the Contracting Officer (CO) or the AOM Technical Inspector.Section B
R59All aircraft components and accessories must be replaced upon reaching the manufacturer recommended TBO or FAA-approved extension. Life-limited parts must be replaced at the specified time-in-service hours or cycles... provide, at the time of the agency inspection, a list of all items installed on the aircraft that are required to be overhauled or replaced on a specified time basis.Section B
R60The aircraft weight and balance report must include a (1) weight and balance record, (2) equipment list, and (3) any calculations due to changes in the equipment list. A copy of the current weight and balance report must be kept with the aircraft. The aircraft's required weight and balance record must be determined by actual weighing of the aircraft... current, within 36 calendar months preceding the starting date of the contract and every 36 months thereafter... weighed on scales that have been certified as accurate within the preceding 12 calendar months.Section B
R61The Contractor must maintain as a minimum, aircraft insurance coverage required by 14 CFR, Part 205, during contract performance in accordance with DIAR 1452.228-71: Bodily injury to or death of aircraft passengers of not less than $75,000 for any one passenger and a limit for each occurrence in any one aircraft of at least an amount equal to the sum produced by multiplying $75,000 by 75 percent of the total number of passenger seats installed; Bodily injury to or death of persons (excluding passengers) of not less than $75,000 for any one person in any one occurrence and $300,000 for occurrence; Property damage of not less than $100,000 for each occurrence; or a single limit equal to or greater... maintain worker's compensation and other legally required insurance.Section C (statement of work)
R62For “Aircraft Accident” or NTSB reportable “Incident”, the Contractor must immediately, and by the most expeditious means available, notify the NTSB, CO, and AOM ASM... calling 1-888-4MISHAP... submit a SAFECOM within 5 days upon the occurrence of any condition, observance, act, maintenance problem, or circumstance which has potential to cause an aviation-related mishap.Section C (statement of work)
R63The Contractor must not permit removal or alteration of the aircraft, aircraft equipment, or records following an Aircraft Accident, Incident, or Incident with Potential until authorized to do so by the CO or other authorized agency representative.Section C (statement of work)
R64Civil Aircraft Landing Permit, DD Form 2401, and Civil Aircraft Hold Harmless Agreement, DD Form 2402. The contractor must submit these forms within ten calendar days after receipt of contract award, to the COR. Contractor shall be required to submit a DD Form 2400, Civil Aircraft Certificate of Insurance within ten calendar days after receipt of contract award and annually.Section C (statement of work)
R65All weapons in the aircraft survival kit shall be registered with the Ft Wainwright Provost Marshal.Section C (statement of work)
R66During the exclusive use period and any extension, the Contractor must be in compliance with all contract requirements and available and capable of providing service up to 14 hours each day, as scheduled by the Government. Personnel must be available a minimum of nine hours each day, or as scheduled by the Government.Section C (statement of work)
R67Standby. Personnel must be on standby each day as scheduled and must be ready for takeoff/dispatch within 15 minutes... after the Government attempts to contact the Contractor's representative. Alert. After standby Contractor personnel may be authorized to leave the immediate vicinity... subject to call back... must be ready for takeoff/dispatch within 60 minutes...Section C (statement of work)
R68The contents must be titled and organized in the order described below: Vol I Offer [D4.2 Vol I Pricing Pages; D4.3 Vol I SAM Page 1; D4.4 Vol 1 Acknowledgment of Solicitation Amendments (if any); D4.5 Vol I Offerors MISC Info (Exhibit E-1)]; Vol II Technical Capability [D4.6 Aircraft Questionnaire and Aircraft Information Form (Exhibits E-5 and E-6); D4.6.1 Aircraft Charts and Calculations; D4.6.2 Fuel Requirements; D4.6.4 Current Aircraft Weight and Balance Record and Equipment List; D4.6.5 Airworthiness Certificate; D4.6.6 Aircraft Registration; D4.6.7 First Page of FAA Certification 14 CFR Part 135; D4.6.8 Part 135 Operation Specifications A003; D4.6.9 Part 135 Operation Specification B050; D4.6.10 Part 135.63(a)(3) D085 Aircraft Listing; D4.6.16 Staffing (Pilot) Qualifications (Exhibit E-4 & E-2)]; Vol III Organizational Safety [D4.7 Evidence of meeting FAA SMS requirements; D4.7.1 Current SMS Manual; D4.7.2 SMS Questionnaire (Exhibit 7); D4.7.3 Other supporting documents]; Vol IV Past Performance [D4.8 Past Performance Questionnaire (Exhibit E-3)].Section D
R69Pricing page (See Section A) must be clearly completed or typed for each aircraft offered. Unit rates will be offered in whole U.S. dollars for daily availability and flight time.Section D
R70Offerors must complete their annual representations and certifications online at www.sam.gov in the System for Award Management (SAM) and include a copy of the first page of their SAM registration showing current SAM registration status.Section D
R71Provide all appropriate charts and calculations to support the performance characteristics of the proposed aircraft. Use current and correct performance charts from the Aircraft Flight Manual or Flight Manual Supplement as appropriate. For payload calculations, the offeror shall use a standard fuel weight of 6.7 lbs. per gallon, Exhibit 5... and the pressure altitude and temperature values specified in Section A.Section D
R72Provide a current (within 36 months of the solicitation closing date) aircraft weight and balance record, equipment list certified accurate at the time of weighing which lists all required equipment from B6 and B7, and any calculations indicating changes to the aircraft and equipment list that may have occurred after the time of weighing.Section D
R73The offeror must propose an aircraft that meets or exceeds the Minimum Aircraft Requirements specified in Section A of this solicitation. The offer will be rated Unsatisfactory if the proposed aircraft fails to meet any of the Minimum Aircraft Requirements specified in Section A of this solicitation.Section D
R74Staffing (Pilot) Qualifications. A completed copy of the OAS-64A Pilot Evaluation Application (Section E, Exhibit E-4)... and Pilot Questionnaire (Exhibit E-2)... Complete a separate form for each pilot proposed... Clearly identify the pilots as proposed primary PIC/SIC or relief PIC/SIC. The offeror must propose pilot(s) that meet or exceeds the Minimum Pilot Qualifications specification in Section B of this solicitation. The offer will be rated Unsatisfactory if the proposed pilot(s) fail to meet any of the Minimum Pilot Qualifications specified in Section B of this solicitation.Section D
R75Offeror must include a completed copy of the Past Performance Questionnaire (PPQ), included in Section E-3 to include requested documents. The PPQ must be used to include information on no more than three (3) of the most relevant contracts performed by the prime offeror for any local, state, and Federal agencies, and commercial customers during the three (3) years prior to the date of issuance of this solicitation.Section D
R76The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers unless another time period is specified in an addendum to the solicitation.Section D

Recent awards in NAICS 481211

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-02-15BRIDGER AEROSPACE GROUP, LLCDepartmental Offices · TASK ORDER FOR 2027 AIR ATTACK FLIGHT SERVICES WITH CAMERA SENSOR AND AIRBORNE REMOTE SENSOR OPERATOR IN SUPPORT OF THE BUREAU OF INDIAN AFFAIRS UNDER CONTRACT 140D0423D0085.$5.34 million
2027-01-01ECOSCAN RESOURCE DATA LLCDepartmental Offices · AIRCRAFT RENTAL AGREEMENT FOR USGS REMOTE SENSING COASTAL CHANGE$35,000
2026-12-01WILDLIFE AIR, LLCDepartmental Offices · AIRCRAFT RENTAL AGREEMENT FOR GRAND TETON NP WILDLIFE SURVEYS$29,000
2026-10-23ELKHORN AVIATION, INC.Departmental Offices · DEPARTMENT OF THE INTERIOR / NATIONAL PARK SERVICE ERADICATION OF NON-NATIVE MOUNTAIN GOAT IN GRAND TETON NATIONAL PARK$50,000
2026-10-23MISTY FJORDS AIR AND OUTFITTING, INC.Departmental Offices · FIXED WING ON CALL FLIGHT SERVICES FOR USGS UNUK SALMON FISH$15,510
2026-10-21MOUNTAIN BLADE RUNNER LLCDepartmental Offices · ON-CALL SMALL HELICOPTER FLIGHT SERVICES IN SUPPORT OF THE U.S. DEPARTMENT OF THE INTERIOR/NATIONAL PARK SERVICE, ROMO EAGLE CLIFF PRESCRIBED BURN IN CO$17,522

Source: USAspending.gov, retrieved 2026-10-28. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.