Z--Rosebud Agency HVAC Upgrade: requirements and submission rules

38 requirements and 6 submission rules found in the solicitation documents for 140A1627Q0113. Use them as the start of your compliance matrix.

Solicitation number
140A1627Q0113
Agency
INTERIOR, DEPARTMENT OF THE / BUREAU OF INDIAN AFFAIRS / BUREAU OF INDIAN AFFAIRS
NAICS
238220
Set-aside
Indian Small Business Economic Enterprise
Responses due
21 January 2027 (54 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Quote Acceptance Period: Quotes shall be good for ninety (90) days past the closing date.
  • (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.
  • The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act-covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system.
  • (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
  • (2) The Contractor shall search for the phrase "FASCSA order" in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
  • (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil.

Requirements

IDRequirement
R1The "offer" section on the reverse must be fully completed by offeror.
R2Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
R3Offerors are required to submit pricing, a completed Section K, and the Indian Affairs Indian Economic Enterprise Representation Form with submission.
R4Buys must submit completed pricing on Attachment 9 - Pricing Schedule
R5All interested contractors must register via email at least 24 hours prior to attend. If no contractors register, the site visit will be canceled.
R6Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal. Contractor is responsible for contacting the appropriate TERO office for coordination and approvals.
R7Contractor shall perform all work in accordance with all attachments and will submit a completed Attachment 9.
R8Contractors should provide a lump sum price for completing the work as described in attachments 1 thru 8, along with a completed Attachment 9. Quotes should be submitted electronically to kurt.egner@bia.gov by the time listed in Block 13 of the 1442. Quotes should be sent via email or as an email attachment in .pdf, .docx, or. xlsx format.
R9The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
R10The amount of the bid guarantee shall be 20 percent of the bid price or $2,000,000.00, whichever is less.
R11If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
R12Contractor to assume gaskets and jacket insulation may contain asbestos material until otherwise determined for the purpose of removals. Provide a line item for time and material for unknown quantities.
R13Provide a line item for time and material for unknown quantities.
R14Owner (BIA) requires the contractor to provide a third party industrial hygienist for baseline monitoring, daily area monitoring, visual inspections, and final clearance sampling.
R15Contractor will incur cost on all final clearance sampling and laboratory costs.
R16Allowable working hours are 7:30 am-5:30 pm
R17Contractor to coordinate means and methods with existing and new HVAC equipment for seasonal operations based on construction schedule approved by COR.
R18Longer periods of interruptions must be scheduled and approved by COR.
R19For short-circuit and arc-flash studies, contractor shall obtain electrical power utility impedance / fault current information from electrical power utility as called for in the specifications.
R20Contractor’s work must maintain the current warranty.
R21The contractor needs to include a line item for square feet for quantities.
R22Patch and paint (as necessary) surfaces affected corner-to-corner or to the nearest break.
R23All lamps and ballasts considered hazardous water shall be properly disposed of.
R24Any new work in the crawlspace will require respiratory protection. The completed crawlspace shall be posted as asbestos-contaminated, with respiratory protection required.
R25Remove any pipe lengths, fittings and accessories that are associated with any abandoned piping.
R26Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
R27The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
R28The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows: $50,000 each person* $100,000 each occurrence* $100,000 property damage*
R29The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
R30The offeror must notify the contracting officer immediately in writing if there is any ownership change affecting compliance with this representation.
R31The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
R32Failure to clarify a discrepancy shall make the contractor responsible for bidding the largest quantity, best quality, or most stringent requirement stated or implied by any of the contract documents.
R33The contractor shall personally, or, through an authorized representative, constantly supervise the work and be at the site of the work during working hours or be represented by them, and who shall have authority to act for the contractor. The contractor shall employ only competent mechanics and workers on the project. Asbestos workers must be licensed in the State of South Dakota.
R34Submit a project plan of the procedures, materials, and methods proposed for use in complying with the requirements of this specification. Include in the plan the location and layout of decontamination areas, the sequencing of asbestos removal work, the interface of trades involved in the performance of work, methods to be used to assure the safety of occupants and visitors to the site, disposal plan including name and location of EPA approved disposal site, and a detailed description of the methods to be employed to control pollution. Identify the extent and location of each containment area. List specific removal methods proposed for each operation in every area of this building. The plan must be approved by the Owner or Owner’s designated representative prior to commencement of work.
R35Provide a full-time general superintendent who is experienced in administration and supervision of asbestos abatement projects including work practices, protective measures for building and personnel, disposal procedures, etc. This person is to be the competent person as required by OSHA, in 29 CFR 1926, for the Contractor and is the Contractor's representative responsible for compliance with all applicable federal, state and local regulations, particularly those relating to asbestos containing materials. This person must have completed a 40 hour course at an EPA training center or have an equivalent certified course in asbestos abatement procedures which complies with AHERA. He/she is also required to have a minimum of two (2) years on-the-job training and must meet any additional requirements set forth in 29 CFR for a competent person.
R36Provide one foreperson for abatement crew. The foreperson must have completed a supervisory health and safety training course offered by an EPA or OSHA endorsed educational institute. The foreperson must also have a minimum of 12 months of on-the-job experience on asbestos abatement projects.
R37Prepare a contingency plan for emergencies including fire, accident, power failure, differential pressure system failure, supplied air system failure or any other event that may require modification or abridgement of decontamination or work area isolation procedures.
R38Provide a barrier and/or locked dumpster for any waste ACM being stored on the site.

Recent awards in NAICS 238220

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-19HSG MECHANICAL CONTRACTORS INCDepartmental Offices · IL-CRAB ORCHARD NWR-HVAC SERVICE BPA BPA CALL ORDER #06$12,940
2026-11-19A & S PLUMBING, INCBureau of Indian Affairs and Bureau of Indian Education · HVAC HOT WATER SUPPLY LINE REPAIR$32,266
2026-11-19J & G SOLUTIONS LLCDepartmental Offices · GWMP - ARHO BUNKER HVAC$378,300
2026-11-13CONTRACTING ONE LLCDepartmental Offices · EO 14398 PLANET RANCH CONSERVATION AREA HVAC REPLACEMENT$92,450
2026-11-09FRIEMEL LOVE CODepartmental Offices · PHOENIX CONTROLS UPGRADE$69,438
2026-11-09AGAPE ENCOUNTERS, LLCDepartmental Offices · WY-JACKSON NFH-GEOTHERMAL HVAC RPLCMNT$106,600

Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.