N. Cheyenne Busby JDC Sewer Upgrade: requirements and submission rules

36 requirements and 3 submission rules found in the solicitation documents for 140A1627Q0110. Use them as the start of your compliance matrix.

Solicitation number
140A1627Q0110
Agency
INTERIOR, DEPARTMENT OF THE / BUREAU OF INDIAN AFFAIRS / BUREAU OF INDIAN AFFAIRS
NAICS
238220
Set-aside
Indian Small Business Economic Enterprise
Responses due
16 December 2026 (18 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • No questions will be answered during a site visit; all questions must be submitted through the Contracting Officer.
  • Payment requests must be submitted electronically through the U.
  • (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.

Requirements

IDRequirement
R1The "offer" section on the reverse must be fully completed by offeror.
R2The contractor shall begin performance within 10 calendar days and complete it within 90 calendar days after receiving notice to proceed. This performance period is mandatory.
R3THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? YES (within 10 calendar days after award)
R4Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
R5This is a competitive Indian Small Business Economic Enterprises (ISBEE) set-aside acquisition. All responsible ISBEEs may submit a proposal for consideration in accordance with these and other terms and conditions of the solicitation. Offerors are required to submit pricing, a completed Section K, and the Indian Affairs Indian Economic Enterprise Representation Form with submission.
R6Quote Acceptance Period: Quotes shall be good for ninety (90) days past the closing date.
R7Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposaal. Contractor is responsible for contacting the appropriate TERO office for coordination and approvals.
R8Invoices must include, as a minimum, the following information: 1. Order Number 2. Item number of deliverable 3. Description of deliverable 4. Price of deliverable 5. Quantity of deliverable 6. Date deliverable was provided to the Government for inspection 7. Serial number/part number if applicable
R9If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
R10The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows: $50,000 each person* $100,000 each occurrence* $100,000 property damage*
R11The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
R12The offeror represents as part of its offer that it [ ] does [ ] does not meet the definition of Indian Economic Enterprise (IEE) as defined in DIAR 1480.201 and that it intends to meet the definition of an IEE throughout the performance of the contract. The offeror must notify the contracting officer immediately in writing if there is any ownership change affecting compliance with this representation.
R13Contractors should provide a lump sum price for completing the work as described in all attachments. Quotes should be submitted electronically to kurt.egner@bia.gov by the time listed in Block 13 of the SF 1442 . Quotes should be sent via email or as an email attachment in .pdf, .docx, or. xlsx format.
R14The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer.
R15The Contractor will perform technical work in accordance with applicable publications. They include but are not limited to: Standards AND Publications (Latest Editions): International Plumbing Code (IPC) or Uniform Plumbing Code (UPC), whichever is applicable to the locality. NFPA 70 National Electric Code NFPA 101 Life Safety Code Montana State Fire code Law Regulations and Code Book 40 CFR 61 Other applicable OSHA requirements.
R16A Payment and Performance bond shall be required for the duration of the project.
R17Replace approximately 500 linear feet of metal iron piping with varying diameter sizes ranging from ten(10”)-inch – four(4”)-inch with Schedule 40 polyvinyl chloride (PVC) piping.
R18All existing metal (black iron) piping horizontally positioned and suspended by hangers shall be removed and replaced with Schedule 40 polyvinyl chloride (PVC) piping, including all necessary adapters, couplings, unions, and T/Y junctions. Connections to vertically orientated metal piping of the sewage system traveling up into the facility connecting into either the existing plumbed sewage/wastewater collections system or for ventilation shall be completed w/ appropriately sized adapters and/or components to securely join the PVC piping material to the Metal piping material. Including the replacement or repair of any support hangers or suspended supporting cross-members as needed.
R19Provide a 3-year materials warranty and a 1-year installation warranty. The Contractor shall insure all work meets or exceeds specifications.
R20The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
R21All materials shall be installed in accordance with the manufacturer’s recommendations and/or applicable building standards unless specifically stated otherwise in the specifications.
R22The Contractor will notify the COR or his/her authorized representative, upon commencement of work activities, and difficulties, interruption, or suspension of work, and when the required work has been completed. The Contractor shall update the COR, or their authorized representative, no less than once weekly on status of work being done
R23The Contractors shall comply with the Davis-Bacon Act and payment of not less than the applicable prevailing wage rates for the locality established by the Department of Labor for the project locale.
R24Pre-Construction Safety Meeting: Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
R25The contractor shall contact the local TERO Office before beginning project work.
R26The contractor will be required to attend a pre-work conference at least one week prior to beginning work, during which time the Contractor shall supply the COR with a Safety Program Submittal
R27The contractor shall provide digital copies of each submittal for review and approval by the BIA’s representative
R28The Government requires digital Daily Status Reports and Weekly Progress Reports from contractors in order to monitor progress and ensure compliance. The daily reports can be submitted at the end of the week if approved to work during a weekend, or Fridays, whichever is the last work day of the week.
R29The Contractor shall maintain accurate accident records and report accidents as prescribed to the COR. Accidents shall be reported within 24 hours of occurrence, and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.
R30Contractor shall provide the BIA with a list of all onsite personnel working on the project.
R31Contractor shall remove all debris from the work site daily.
R32Employee Identification: All contractor employees and the employees of subcontractors shall wear a uniform with company logo, and ID badges with company credentials. Badges and uniform logo shall be readable at four (4) feet distance. Badge shall have name of employee, company logo and employee ID number.
R33It is required that each interested contractor visit the job site prior to submitting a proposal. The Contractor is responsible for quantities, materials, critical dimensions and work conditions used to calculate a proposal.
R34The Contractor is required to provide certified payroll documents for all work performed under this project.
R35All interested contractors must register with the COR in advance. The COR’s contact information is as follows: COR: Forrest Smith Email: forrest.smith@bia.gov
R36The contractor shall offer a guarantee that the work is complete in accordance with all specifications and in compliance with all national, state, and local laws.

Recent awards in NAICS 238220

The newest federal contract awards in the same industry code from Department of the Interior, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-09FRIEMEL LOVE CODepartmental Offices · PHOENIX CONTROLS UPGRADE$69,438
2026-11-09AGAPE ENCOUNTERS, LLCDepartmental Offices · WY-JACKSON NFH-GEOTHERMAL HVAC RPLCMNT$106,600
2026-11-09PC AUTOMATED CONTROLS, INC.Bureau of Indian Affairs and Bureau of Indian Education · EMERGENCY HVAC REPAIR FOR JES$9,928
2026-11-05RASMUSSEN MECHANICAL SERVICES, INC.Bureau of Indian Affairs and Bureau of Indian Education · MDC BOILER LOOP PUMP #1 REPLACEMENT FOR WINNEBAGO AGENCY$6,912
2026-11-05CITY AIR MECHANICAL, INC.Bureau of Indian Affairs and Bureau of Indian Education · EO 14398- BIA- ADMIN BOILER LINE REPAIR FOR GPRO$2,900
2026-11-04BOYER'S MECHANICAL SERVICE, INCDepartmental Offices · LA-RED RIV NWR-HVAC MAINT$52,300

Source: USAspending.gov, retrieved 2026-11-14. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.