Replacement Cattle Dip Vat Drip Pad (Edinburg, TX): requirements and submission rules
150 requirements and 2 submission rules found in the solicitation documents for 124PCA27Q0006. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submit written results of each test to Contracting Officer, and indicate location of rods as well as resistance and soil conditions at time measurements were made.
- Submit signed and sealed design calculations and shop drawings.
Requirements
| ID | Requirement |
|---|---|
| R1 | Coordinate the work with the Government so that ongoing site operations, research functions, animal movement, security, and access are not adversely affected. |
| R2 | Use only those portions of the site approved by the Government. Maintain Government access to existing drives, gates, adjacent buildings, pens, and utility systems. Do not block roads, animal circulation routes, emergency access, or service access required for research operations. |
| R3 | Schedule disruptive work with the Government in advance. Provide not less than 72 hours written notice prior to utility interruptions, shutdowns, major concrete placements, crane operations, or any activity that affects access to existing facilities, pens, or site circulation. Coordinate temporary shutdowns, tie-ins, and outages so that existing operations can continue. |
| R4 | Verify existing dimensions, utility locations, grades, and physical conditions before ordering materials or starting work affected by field conditions. Promptly report discrepancies between contract documents and field conditions. |
| R5 | Protect existing structures, pavements, fencing, gates, utilities, vats, drip pads, drains, equipment, and adjacent improvements that are to remain. Repair or replace damage caused by construction operations at no additional cost to the Government. Keep existing drainage paths functional during construction. |
| R6 | Perform cutting, coring, patching, welding, anchorage, and tie-in work required for a complete installation. Match adjacent materials, lines, grades, finishes, and operating conditions. Coordinate penetrations and embedded items with all trades. |
| R7 | Keep the work area orderly and free of unnecessary debris. Remove rubbish frequently to prevent interference with operations, drainage, safety, and access. At completion, leave the project site clean and ready for intended use. |
| R8 | Perform demolition and modification work only after verifying limits and obtaining Government concurrence. Coordinate utility extensions, pen construction, gates, water service, and electrical work to minimize rework and temporary conditions. |
| R9 | Remove temporary facilities, surplus materials, waste, and construction debris. Clean surfaces and restore disturbed areas to a neat condition. Demonstrate operable systems and turn over required closeout documentation. |
| R10 | Confine operations, material storage, and temporary facilities to approved areas. Do not use existing Government structures or fenced areas for storage unless specifically approved. |
| R11 | Phase the work so the Government can maintain overall site operations. Sequence demolition, new construction, tie-ins, and commissioning of water and electrical systems to reduce downtime and disruption. |
| R12 | Within 15 calendar days after Notice to Proceed, submit a preliminary submittal register identifying all required submittals, dates of first submission, dates of resubmission if required, and relation to procurement and installation. Keep the submittal register current throughout the contract. |
| R13 | Provide submittals electronically in searchable PDF format unless another native format is specifically required for calculations, schedules, or spreadsheets. Combine related items into logical packages. Clearly identify project name, section number, item, revision number, and contractor review stamp. |
| R14 | Review, approve, and stamp all submittals before forwarding them. Submittals that do not bear the Contractor's approval stamp or that are incomplete, inaccurate, or not coordinated may be returned without review. |
| R15 | Clearly identify all changes on resubmittals. Cloud or otherwise mark revisions and include a brief explanation of changes made in response to review comments. |
| R16 | Submit operation and maintenance data, warranties, record documents, and spare parts information in accordance with Section 01 78 23 and other applicable sections. |
| R17 | Do not begin fabrication or installation requiring submittal review until the applicable submittal has been processed. |
| R18 | Access to the site will be only through Government-approved entry points. Contractor personnel shall comply with Government identification, sign-in, escort, and vehicle control requirements. Do not enter restricted areas beyond the limits required for this contract. |
| R19 | Conduct all work so that Government livestock operations and biosecurity practices are not compromised. Do not handle Government animals unless specifically directed in writing. Keep tools, equipment, packaging, and construction materials secured so they cannot enter pens, alleys, vats, or livestock circulation areas. Maintain separation between construction activities and Government animal operations. Immediately report any condition that could affect animal safety, containment, or facility biosecurity. |
| R20 | Schedule work affecting the existing dipping vat, drip pad, canopy area, existing pens, or vehicle access with the Government. Operations that generate significant noise, vibration, dust, traffic interference, or temporary loss of access shall be planned in advance and coordinated. |
| R21 | Provide temporary barriers, fencing, and warning devices as needed to separate construction from Government operations and to protect personnel, equipment, and livestock. Temporary barriers shall remain in place until permanent work is complete and safe for use. |
| R22 | Prevent sediment, debris, concrete washout, weld slag, coating overspray, and other contaminants from entering existing vats, pads, drains, troughs, pens, and adjacent areas. Maintain positive control of water used for construction and cleanup. |
| R23 | The existing dip vat and drip pad are integral existing facilities to be protected. Do not damage, clog, contaminate, or alter these systems except as required by the drawings and specifications. Verify tie-in points and work limits before starting modifications. |
| R24 | If unexpected underground utilities, unsuitable soils, unsafe structural conditions, residues, or other concealed conditions are encountered, stop affected work and notify the Government promptly for direction. |
| R25 | At the end of each work day, leave the site in a safe and stable condition. Secure open excavations, incomplete fencing, partially installed gates, water lines, electrical components, and other hazards. Remove loose materials and debris that could endanger personnel or livestock. |
| R26 | Comply with applicable Federal, state, and local safety and health requirements, OSHA construction standards, and the contract safety requirements. Comply with USACE EM 385-1-1 Safety and Health Requirements as applicable to the contract. Where requirements differ, apply the more stringent requirement. |
| R27 | Before beginning onsite work, submit a site-specific Accident Prevention Plan / Safety and Health Plan addressing the work, hazards, controls, emergency procedures, competent persons, training, and inspections. Update the plan when site conditions or work activities change. |
| R28 | Prepare Activity Hazard Analyses for definable features of work and hazardous activities including demolition, excavation, concrete placement, welding, cutting, rigging, erection, trenching, electrical work, confined or restricted access work, and work around existing livestock or occupied Government operations. Review AHAs with affected workers before starting each activity. |
| R29 | Designate a qualified site safety representative with authority to enforce the safety program and stop unsafe work. Provide competent persons as required for excavation, fall protection, scaffolding, rigging, welding, electrical safety, and other applicable activities. |
| R30 | Hot work will not be permitted without adequate fire prevention measures. Provide extinguishers, fire watch, and protection of adjacent combustibles and Government property. Coordinate hot work with the Government. |
| R31 | Maintain onsite emergency contact information, hospital directions, and communication capability. Promptly report accidents, injuries, fires, utility strikes, environmental releases, and near misses in accordance with contract requirements. |
| R32 | Maintain safe housekeeping. Inspect the work area daily and correct unsafe conditions immediately. Barricade, cover, or otherwise protect hazards until corrected. |
| R33 | Do not start onsite work until required safety submittals have been accepted. Conduct safety orientation for all workers. Enforce use of required personal protective equipment. |
| R34 | Maintain positive control of the work area so that livestock, Government personnel, and visitors cannot enter construction hazards. Do not leave partially installed gates, sharp edges, protrusions, welding leads, cords, hoses, open trenches, or unsecured materials where they could interfere with operations or animal movement. |
| R35 | Keep the site free of conditions that could adversely affect Government biosecurity practices. Remove waste promptly. Prevent tracking of mud, debris, coating materials, or other contaminants into adjacent occupied areas. |
| R36 | Protect temporary and permanent water piping from contamination and damage during installation. Provide temporary caps and closures on piping. Protect temporary and permanent electrical systems from weather, moisture, impact, and unauthorized contact. |
| R37 | If evidence of residues, contaminated materials, unsafe structural conditions, or other unusual hazards is encountered, stop affected work and notify the Government immediately for direction. |
| R38 | Establish and maintain an effective Contractor Quality Control system to assure that work conforms to the contract documents. The Quality Control system shall cover materials, workmanship, testing, inspections, documentation, and corrective actions. |
| R39 | Within 15 calendar days after Notice to Proceed, submit a written Quality Control Plan. Include organization, names and qualifications of responsible personnel, testing laboratories, definable features of work, inspection procedures, report forms, submittal control, documentation methods, and corrective action procedures. |
| R40 | Designate a qualified QC Manager with authority to implement the QC program and stop nonconforming work. Provide additional inspectors, testing personnel, and specialists as necessary for the size and complexity of the work. |
| R41 | Provide preparatory, initial, and follow-up control for each definable feature of work. Document meetings, attendees, results, and corrective actions. |
| R42 | Provide required inspections and tests, including at a minimum those applicable to earthwork, concrete, reinforcing steel, anchor installation, welding, coatings, plumbing pressure tests, electrical tests, and operational checks of gates, hardware, valves, and controls. Use qualified laboratories and technicians where third-party testing is required. |
| R43 | Work that does not comply with the contract documents is subject to rejection. Correct nonconforming work promptly. Retesting and reinspection required because of nonconforming work shall be at no additional cost to the Government. |
| R44 | Prepare daily QC reports identifying weather, work in progress, inspections performed, tests taken, deficiencies observed, corrective actions, and directions given. Provide copies to the Government. |
| R45 | Do not begin work until the QC Plan has been accepted. Coordinate quality control activities with submittal review, procurement, fabrication, and field installation. |
| R46 | Before requesting substantial completion or final inspection, verify that punch list items have been corrected, systems have been tested, and closeout submittals are complete. |
| R47 | Provide and maintain sanitary conveniences for contractor personnel in accordance with health regulations. Do not use Government facilities unless specifically authorized. |
| R48 | Store materials in approved areas only. Support and protect stored materials from moisture, damage, theft, contamination, and interference with Government operations. |
| R49 | Arrange for temporary water and power required for the work unless otherwise indicated. Metering, temporary distribution, protection, and removal are the Contractor's responsibility. |
| R50 | Provide temporary barriers and fencing to separate the work from occupied areas, livestock circulation routes, and vehicle traffic. Maintain safe access for Government operations at all times. |
| R51 | Submit an Environmental Protection Plan describing methods for dust suppression, material storage, spill prevention, concrete washout, waste handling, stormwater protection as applicable, and response to environmental incidents. Tailor the plan to the actual work and site conditions. |
| R52 | Prevent discharge of fuels, lubricants, solvents, coatings, concrete wash water, sediment, or other contaminants to soil, drainage paths, or existing facilities. Provide secondary containment and cleanup materials where liquids are stored or used. |
| R53 | Control dust by wetting, covering, limiting disturbed areas, and other effective means. Control mud tracking onto roads and paved areas. Keep adjacent occupied areas clean. |
| R54 | Collect, containerize, and remove waste materials regularly. Do not burn or bury waste onsite. Dispose of waste lawfully. |
| R55 | Submit manufacturer information or certifications identifying recycled content, recovered content, or biobased content where such attributes are claimed for compliance. |
| R56 | Maintain records of qualifying materials incorporated into the work and provide summary information at closeout if requested. |
| R57 | Before starting work, submit a Demolition Plan describing sequencing, temporary barriers, utility interruption procedures, dust and debris control, protection of the existing dip vat and drying area, salvage handling, disposal methods, and end-of-day hazard control. Include coordination procedures for maintaining Government operations, animal movement, and access to adjacent facilities. Do not begin demolition until the plan is accepted by the Contracting Officer. |
| R58 | Remove rubbish and debris from Government property daily unless otherwise directed. Store materials that cannot be removed daily only in approved locations. Perform the work in accordance with EM 385-1-1, ASSP A10.6, and other applicable safety requirements. |
| R59 | Protect the following items and all other existing construction designated to remain: Existing dip vat. Existing drying area / drip pad. Existing rigid frames and footings designated to remain. Existing fencing designated to remain at the drying area. Existing roads, pens, gates, utilities, and adjacent Government operations outside the demolition limits. Existing conduit and conductors designated for reuse with the new panel installation. |
| R60 | Do not disturb existing construction beyond the extent indicated. Provide shoring, bracing, temporary barriers, covers, and other protective measures required to prevent settlement, movement, or damage to work remaining in place. Maintain existing drainage paths and prevent sediment, debris, concrete washout, and other contaminants from entering the dip vat, drying area, drains, troughs, and adjacent livestock areas. |
| R61 | Maintain existing utilities serving adjacent facilities and operations. Do not interrupt utility service without written approval from the Contracting Officer. Coordinate all shutdowns and tie-ins with the Government and perform them only during approved periods. |
| R62 | Burning of refuse and debris on Government property is not permitted. |
| R63 | Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals: Demolition Plan (G). SD-01 Preconstruction Submittals: Schedule of utility interruptions and disruptive operations (G). SD-11 Closeout Submittals: Salvage and disposal report identifying Government-retained items, recycled materials, disposal destinations, and disposal manifests or tickets. |
| R64 | Perform demolition with personnel experienced in the type of work specified. When utility disconnections are required, use properly qualified trades. If suspicious or regulated materials are encountered that are not identified in the contract documents, stop work in the affected area and notify the Contracting Officer immediately. |
| R65 | Comply with FAR 52.236-9 and protect existing vegetation, structures, equipment, utilities, and improvements. |
| R66 | Provide barricades, warning devices, temporary fencing, and covers required for the protection of Government personnel, contractors, visitors, and livestock. Leave the site in a safe condition at the end of each work period. |
| R67 | Visit the site and verify existing conditions affecting the work before beginning demolition. Field verify dimensions, grades, locations of utilities, and relationships of existing construction to remain. Variations from the contract documents that affect demolition sequencing or protection of remaining work must be reported to the Contracting Officer before proceeding. |
| R68 | Provide clean, satisfactory soil free of rubbish, debris, organic matter, and oversized material for filling voids created by demolition. Use material suitable for compaction and reasonably compatible with surrounding soils. Place fill in lifts and compact to a firm, unyielding condition matching adjacent grades and supporting the intended new work. |
| R69 | Cap, plug, or otherwise make safe all remaining utility lines and equipment after demolition. Protect existing 3/4-inch water service intended for reuse or connection by the new work. |
| R70 | Sawcut concrete at neat straight lines and at the limits of demolition to avoid damage to adjacent concrete remaining in place. Where concrete is removed adjacent to work remaining, leave clean true edges suitable for adjoining new construction. |
| R71 | Demolish existing roof panels and purlins complete where shown. Do not damage existing rigid frames designated to remain. Sequence removal to support the planned installation of the replacement roof system and to avoid leaving partially dismantled framing or loose materials in place. |
| R72 | Demolish concrete items indicated to be removed, including slabs, foundations, and the existing concrete sump wall noted on the drawings. Remove the sump wall to 12 inches below grade and backfill the remaining void with compacted fill. Protect the existing dip vat and drying area during all concrete demolition and hauling operations. |
| R73 | Existing rigid frames and footings designated to remain must not be cut, bent, overloaded, or otherwise damaged. Recycle removed structural steel unless selected by the Government for salvage. |
| R74 | Where existing conduit and conductors are designated to be reused with the new panel installation, verify they are undamaged and properly supported, then preserve and protect them during demolition. Damaged reusable items must be reported immediately to the Contracting Officer. |
| R75 | The Government reserves the first right of refusal for demolished equipment and materials. Remove and store items selected by the Government in the location directed by the Contracting Officer. Materials not selected by the Government become the property of the Contractor and must be removed from Government property and disposed of in accordance with applicable laws and regulations. |
| R76 | Materials selected by the Government for salvage must be removed in a manner that prevents damage, identified as to contents or description, and delivered to the designated storage location. Store salvage neatly and protect it from damage pending final disposition. |
| R77 | Dispose of material that is not reused, salvaged, or recycled at a lawfully permitted off-site facility. Do not bury demolition debris on Government property. |
| R78 | Remove demolished materials from Government property promptly. Do not sell, stockpile, or abandon demolished materials on site. |
| R79 | Government approval is required for submittals with a "G" designation. Submittals not having a "G" designation are for Contractor Quality Control approval. SD-03 Product Data: Cement, Aggregates, Admixtures, Reinforcing steel, Form materials, Curing materials; SD-05 Design Data: Concrete mix design; SD-06 Test Reports: Concrete compressive strength tests, Slump tests; SD-07 Certificates: Ready-mix supplier certification, Reinforcing steel mill certificates; SD-08 Manufacturer's Instructions: Admixtures, Curing materials. |
| R80 | Concrete for foundations and grade beams shall have a minimum compressive strength of 4,000 psi at 28 days unless otherwise indicated. |
| R81 | Provide deformed reinforcing bars, ASTM A615/A615M, Grade 60, size No. 5, unless otherwise indicated on the drawings. |
| R82 | Place reinforcement accurately and support it to remain in position during concrete placement. Reinforcement bearing directly on earth or forms will not be permitted unless specifically detailed for such support. |
| R83 | Perform work in accordance with ACI 117. |
| R84 | Deliver and store materials to prevent damage, contamination, and deterioration. Store reinforcing steel above ground and protect from mud, oil, excessive rust, and distortion. |
| R85 | Do not place concrete when subgrade is frozen or when weather conditions prevent proper placement, finishing, or curing. Protect concrete during hot and cold weather in accordance with ACI 301. |
| R86 | Cement: ASTM C150/C150M, Type I or Type II. |
| R87 | Aggregates: ASTM C33/C33M, normal-weight aggregate. |
| R88 | Water: Clean, potable, and free from injurious amounts of oil, acid, alkali, salts, or organic matter. |
| R89 | Air-Entraining Admixture ASTM C260/C260M. Chemical Admixtures: ASTM C494/C494M. Do not use calcium chloride admixtures. |
| R90 | Provide normal-weight ready-mixed concrete conforming to ASTM C94/C94M. Concrete compressive strength shall be 4,000 psi minimum at 28 days. Maximum slump at point of placement shall be 4 inches, except slump may be increased to 5 inches when a water-reducing admixture is used and water-cement ratio is not increased. |
| R91 | Reinforcing Bars: ASTM A615/A615M, Grade 60, deformed bars, size No. 5 unless otherwise indicated. |
| R92 | Provide chairs, bolsters, spacers, tie wire, and other accessories necessary to support and secure reinforcing steel in proper position. |
| R93 | Provide form materials of sufficient strength and rigidity to maintain required alignment, grade, and dimensions of concrete members during placing and curing. |
| R94 | Curing Materials: ASTM C171, or curing methods conforming to ACI 301. |
| R95 | Where expansion joint filler is indicated, provide 1/2 inch thick preformed joint filler conforming to ASTM D1751. |
| R96 | Verify that excavations, bearing surfaces, embedded items, and forms are ready to receive concrete. Do not begin placement until unsatisfactory conditions have been corrected. |
| R97 | Foundations and grade beams shall bear on properly prepared subgrade or approved bearing surfaces as indicated. Remove loose, soft, wet, frozen, or otherwise unsuitable material and replace with suitable compacted material. |
| R98 | Construct forms true to line, grade, and dimensions indicated. Brace, tie, and support forms to prevent movement or deflection during concrete placement. |
| R99 | Place No. 5 reinforcing bars as indicated. Clean reinforcement of loose rust, scale, mud, oil, and other bond-reducing materials before placement. Secure reinforcement against displacement. Provide clear concrete cover in accordance with the contract drawings and ACI 318. Splices, hooks, bends, and placement tolerances shall comply with ACI 318 and ACI SP-66 unless more stringent requirements are indicated. |
| R100 | Accurately position anchor bolts, dowels, sleeves, inserts, and other embedded items before concrete placement. Secure embedded items to prevent displacement. |
| R101 | Place concrete on clean, prepared surfaces. Deposit concrete as near its final position as practical to avoid segregation. Place concrete continuously in each foundation or grade beam between planned joints. Consolidate concrete by vibration and rodding as required to produce dense, homogeneous concrete free of honeycombing. Do not place concrete in water or on muddy surfaces without approval. |
| R102 | Begin curing immediately after finishing. Cure concrete by moisture-retaining cover, formed-in-place protection, or other approved method conforming to ACI 301. Protect concrete from premature drying, excessive cold or heat, rainfall, flowing water, vibration, mechanical injury, and construction loading until adequately cured. |
| R103 | Perform sampling and testing in accordance with ASTM C31/C31M, ASTM C39/C39M, ASTM C143/C143M, and ACI 301. Obtain concrete test cylinders and slump tests for each day's placement and for each class of concrete placed, or as otherwise required by the contract documents. |
| R104 | Remove and replace concrete that is defective, out of tolerance, honeycombed, cracked, or otherwise unacceptable. Patching of structural concrete will not be permitted unless specifically approved. |
| R105 | Qualify welding procedures and personnel in accordance with AWS D1.1/D1.1M. |
| R106 | Submit fabrication drawings showing layouts, member sizes, wall thicknesses, connections, anchorage, and gate swing and hardware locations in accordance with ANSI/AISC 303. |
| R107 | Protect materials from corrosion, deformation, and other damage. Store items clear of the ground and protected from weather. Replace damaged materials with new materials. |
| R108 | Provide angles, channels, flats, bars, plates, clips, frames, and similar miscellaneous steel items in accordance with ASTM A36/A36M unless otherwise indicated. |
| R109 | Provide steel pipe in accordance with ASTM A53/A53M, Type E or S, Grade B, Schedule 40 minimum, unless a heavier wall thickness is indicated. |
| R110 | Provide galvanized steel sheet in accordance with ASTM A653/A653M, 22 gauge minimum, with G90 coating unless otherwise indicated. |
| R111 | Provide heavy-duty galvanized or zinc-coated steel hardware sized for the gate leaf weight and service, including hinges, latches, keepers, drop rods, and accessories required for complete installation. |
| R112 | Provide bolts, nuts, washers, screws, and anchors of compatible materials and suitable strength for the imposed loads. Provide carbon steel bolts in accordance with ASTM A307 where carbon steel bolts are used. Provide exposed fasteners that match adjacent work in finish as closely as practicable. |
| R113 | Fabricate posts, rails, braces, and gate frames from heavy-wall steel pipe. Fabricate gate leaves square, rigid, and free from warp and twist. Cope, miter, fish mouth, notch, and fit joints accurately. Provide sleeves, tabs, hinges, latches, diagonal bracing, gussets, and stops required for a complete operating assembly as detailed. |
| R114 | Hot-dip galvanize exterior ferrous metal fabrications exposed to weather, including pipe fencing, gates, and exterior hardware, in accordance with ASTM A123/A123M. Galvanize hardware in accordance with ASTM A153/A153M where applicable. |
| R115 | Repair damaged galvanized coatings in accordance with ASTM A780/A780M. |
| R116 | Shop-prime ferrous items not galvanized and not embedded in concrete with manufacturer's standard rust-inhibitive primer after fabrication and surface preparation. |
| R117 | Perform welding of steel pipe and miscellaneous steel shapes in accordance with AWS D1.1/D1.1M. Use continuous welds on exposed connections unless otherwise indicated. Grind visible welds smooth where exposed to view or touch. Remove weld spatter, flux, slag, and sharp edges. Complete shop welding before galvanizing wherever practicable. |
| R118 | Verify field dimensions, opening sizes, supports, and anchorage conditions before fabrication and installation. Do not proceed with fabrication when field conditions are inconsistent with the approved shop drawings until discrepancies are resolved. |
| R119 | Install miscellaneous metal fabrications plumb, level, rigid, true to line, and securely fastened in place. Fit exposed joints accurately and set members without distortion. Conceal fasteners where practicable. Provide all shims, clips, anchors, and accessories required for complete installation. |
| R120 | Install pipe rail fencing and gates to the indicated alignment and elevations. Set posts plumb and in proper relation to gate openings. Adjust gates to swing freely and latch positively without binding. Install hardware in accordance with the manufacturer's written instructions. |
| R121 | Perform field welding only where indicated or approved. Protect adjacent materials from welding damage. Clean field welds and touch up shop primer at damaged areas. Where galvanizing is damaged by field welding or fitting, repair the affected areas in accordance with ASTM A780/A780M. |
| R122 | Provide field-applied coating system for new factory-primed ferrous metal surfaces in a harsh cattle barn environment, including factory-primed steel pipe, rail fencing, gates, and factory -primed structural steel. Coating system shall be suitable for exposure to high humidity, intermittent condensation, ammonia-bearing livestock atmosphere, washdown, and routine agricultural service conditions. Finish coat shall be flat finish. |
| R123 | Provide coating materials from one manufacturer regularly engaged in production of industrial maintenance coatings for ferrous metal. Provide primer touch-up, intermediate, and finish coats as a complete compatible system by one manufacturer. |
| R124 | Conduct conference at project site before beginning coating work to review substrate conditions, factory primer compatibility, surface preparation, application procedures, environmental limitations, and protection of adjacent work. |
| R125 | Do not apply coatings when surface is wet, when ambient or substrate conditions are outside manufacturer's limits, or when condensation is likely to form before coating cures. |
| R126 | For the harsh cattle barn environment indicated, provide a high-performance epoxy coating system over compatible factory primer. Architectural latex, alkyd, and conventional shop-finish touch-up paints will not be permitted for final exposed finish on steel pipe and structural steel in this environment. |
| R127 | Provide two-component epoxy anti-corrosive primer for ferrous metal, compatible with the existing factory primer and with subsequent coats. Use touch-up primer on abraded areas, welds, connections, field cuts, rusted spots, and other areas where factory primer is damaged or missing. |
| R128 | Provide two-component high-build amine-cured epoxy coating suitable for industrial steel in aggressive interior service environments. |
| R129 | Provide two-component epoxy finish coat, chemical-resistant and suitable for livestock or agricultural exposure. Finish shall be flat. Where the coating manufacturer does not produce a true flat epoxy finish for the specified service, provide the manufacturer's lowest available sheen epoxy finish acceptable for the exposure, subject to approval. |
| R130 | Apply coating materials at manufacturer's recommended spreading rates to achieve not less than the following dry film thicknesses: a. Touch-up primer on repaired areas: 2.0 to 3.0 mils DFT. b. Intermediate coat, full coat: 3.0 to 5.0 mils DFT. c. Finish coat, full coat: 2.0 to 4.0 mils DFT. Total additional field-applied system thickness, exclusive of intact factory primer, shall be not less than 6.0 mils DFT. |
| R131 | Clean surfaces in accordance with SSPC SP 1 prior to abrading or recoating. Spot clean damaged areas, rusted areas, welds, burns, and abraded locations to SSPC SP 2 or SSPC SP 3 as required to remove loose rust, loose mill scale, and unsound primer. Feather edges of surrounding intact primer. |
| R132 | Do not remove sound, compatible factory primer. Lightly abrade glossy or contaminated primer surfaces as required by coating manufacturer to ensure bond. Touch up damaged or bare areas with epoxy primer before application of full intermediate and finish coats. |
| R133 | Before application of full coats, brush apply stripe coat of epoxy material to welds, corners, edges, bolt heads, nuts, washers, connections, and other irregular surfaces. |
| R134 | Apply one full intermediate coat and one full finish coat over factory-primed steel after touch-up primer has cured. Do not apply finish coat until intermediate coat is properly cured and within manufacturer's recoat window. |
| R135 | Measure dry film thickness in accordance with SSPC PA 2. Repair deficient areas and recoat until specified thickness is achieved. Perform adhesion testing where directed using ASTM D3359. |
| R136 | Design the metal building system in accordance with MBMA MBSM and applicable code requirements. Delegated design shall be performed under the responsible charge of a professional engineer licensed in the state where the project is located. |
| R137 | Provide a concealed-fastener insulated metal roof panel system that is specifically approved by the roof panel manufacturer for use on a 2 in 12 roof slope. |
| R138 | Provide rigid clear-span gable frames without interior columns. Eave height shall be 8 feet 5.5 inches above finished floor, unless otherwise indicated. Roof slope shall be 2 inches in 12 inches. |
| R139 | Provide manufacturer's standard 2-inch-thick insulated metal roof panel system with concealed clips and concealed fasteners. Exposed-fastener roof panels are not permitted. |
| R140 | Shop-prime primary framing, secondary framing, clips, and exposed structural steel with gray primer. |
| R141 | Provide metal building system from a manufacturer regularly engaged in the fabrication of metal building systems of similar size and complexity. Provide erector experienced in the installation of metal building systems of similar size, type, and complexity. |
| R142 | Provide manufacturer's standard building system warranty for a period of not less than 2 years from date of Substantial Completion. Provide manufacturer's standard weather-tightness warranty for the concealed-fastener insulated metal roof panel system for a period of not less than 2 years from date of Substantial Completion. |
| R143 | Install 2-inch insulated metal roof panels in strict accordance with the approved shop drawings and manufacturer's written instructions for a 2 in 12 gable roof and the specified McAllen, Texas wind design basis. Provide panel clips, concealed fasteners, side-joint sealants, ridge and eave closures, trim, and accessory components required by the manufacturer for the design loads and weather-tight performance. |
| R144 | Materials in contact with potable water shall comply with NSF/ANSI/CAN 61. Plastic piping system components shall comply with NSF/ANSI/CAN 14. |
| R145 | Provide tubing, fittings, tools, and joining components from manufacturers with published installation instructions for the system furnished. Use one joining method throughout each system unless otherwise approved. Install plumbing work by mechanics regularly engaged in the installation of plumbing systems of the types specified. |
| R146 | Provide crosslinked polyethylene tubing conforming to ASTM F876 and ASTM F877, SDR9, rated for potable water service. Tubing shall be suitable for the service pressure and temperature conditions of the system. |
| R147 | Provide fittings compatible with the tubing furnished and suitable for potable water service. Fittings shall conform to ASTM F1807 or ASTM F1960. Use one fitting and joining system throughout the work unless otherwise approved. Provide manufacturer's standard tools, rings, sleeves, and accessories required for complete installation. |
| R148 | Provide full-port ball valves for shutoff service at branches to hose bibbs and cattle watering trough float valves. Valves shall be bronze body, quarter -turn type, with blowout-proof stem and vinyl-covered lever handle, rated for not less than 125 psi working pressure. |
| R149 | Provide hose bibbs conforming to ASME A112.18.1/CSA B125.1, rough bronze body, 3/4- inch hose outlet, threaded inlet, wheel-handle operated unless otherwise indicated, and equipped with integral or field-installed hose connection vacuum breaker conforming to ASSE 1011. Provide hose bibbs with removable hose caps where indicated. |
| R150 | Provide heavy-duty float-operated valves for cattle watering trough service. Valves shall be manually adjustable, non-electric, and suitable for automatic refill control of open livestock watering troughs. Body shall be brass, bronze, stainless steel, or high-impact corrosion-resistant polymer suitable for potable water contact. Float and linkage shall be corrosion resistant. Valve assembly shall be rated for not less than 125 psi working pressure and shall provide positive shutoff at the adjusted water level. |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Agriculture, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-01 | RODRIGUEZ & GARLAND INCForest Service · ANGELITO TRAIL RECREATIONAL SITE ERFO REPAIRS | $2.72 million |
| 2027-01-01 | LIBERTY ELECTRIC INCForest Service · GAOA LCIC LIGHTING UPGRADE (RE-SOLICITATION) | $664,550 |
| 2027-01-01 | XENTURIS LLCForest Service · GAOA LCIC LIGHTING UPGRADES | $0 |
| 2026-12-01 | KWR CONSTRUCTION INCForest Service · GAOA WEAVER'S NEEDLE VISTA AND CANYON LAKE VISTA PAVEMENT PROJECT TONTO NF | $326,810 |
| 2026-10-26 | RTH MECHANICAL CONTRACTORS INCForest Service · WMF FHQ PROPANE BOILER REPLACEMENT | $73,950 |
| 2026-10-26 | AMER-X INC/ROOFING/BLADESForest Service · ROOF REPLACEMENT FOR QUARTERS BUILDINGS ON THE NORTH FORK JOHN DAY DISTRICT OF THE UMATILLA NATIONAL FOREST | $158,325 |
Source: USAspending.gov, retrieved 2026-11-05. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.